查询词典 wind tunnel
- 与 wind tunnel 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
According to the "measures" to apply for the funds industry of wind power equipment manufacturing enterprises must comply with six conditions: First, equipment with independent intellectual property rights and brands, including independent research and development, joint development or re-introduction of technology innovation, we must have complete technical documentation; Second, stand-alone wind turbine capacity of 1500 kilowatts above; are three wind turbine through the Beijing Kam value of product certification and Certification Center; four are supporting wind turbine blades, gear box, generators owned by owned or-controlled enterprises in manufacturing, to encourage the adoption of Chinese-funded or Chinese-holding enterprises manufactured converter and bearings; five are the same enterprise applications using the same technology to support different models of products, poor power 500 kW above; six wind turbine are completed in the domestic production, installation, commissioning, trouble-free operation for more than 240 hours, and through acceptance owners.
根据&措施&的风力发电设备制造企业基金行业申请必须符合6个条件:一,具有自主知识产权和品牌,包括自主研发,联合开发或重新引进设备技术创新,我们必须有完整的技术文档;第二,独立风力发电机组1500万千瓦以上;有三个,通过北京鉴认证和产品认证中心的价值,风力发电机;四是支持风力涡轮机叶片,齿轮中,所拥有或控制的生产企业所属发电机,鼓励采用中资或中控股转换器和轴承制造企业,5个是相同的企业应用程序使用相同的技术来支持不同型号的产品,功率差500千瓦以上; 6个风力发电机组是在国内生产,安装完成,调试,无故障运行超过240小时,并通过业主验收。
-
Sailing into the wind causes the apparent wind to be greater than the true wind and the direction of the apparent wind will be forward of the true wind.
帆船迎风原因显然风力大于真正的风和方向的风力将明显着的真正风。
-
For the present problem of most Xi\'an metro lines passing obliquely through manyactive ground fissure zones,the effect of intersection angle with active ground fissure ofmetro tunnel on metro tunnel lining structure is studied with FEM,and the deformation andfailure characteristics and ranges of influence zones of tunnel are determined.
5针对西安地铁大多数线路斜交穿越地裂缝带的现状,采用有限元数值模拟方法揭示了地铁隧道与地裂缝斜交角度θ对地铁隧道衬砌结构变形破坏的影响规律。
-
In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.
本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。
-
The rectangle shaped member mentioned by this article is a prefabricated one for the internal construction of circular tunnel, and is located along tunnel axis line, to be lifted into place by a dedicated crane onboard the shield machine in synchronised manner, followed by placement at both sides of tunnel, of ballast block, or in-situ cast members, corbel, pavement slab and the like.
由于隧道比较长,为节约工期,在盾构机推进的同时,隧道的内部结构也跟进施工,本文所叙述的口字型构件是圆隧道内部结构中的预制构件,它位于圆隧道的中心轴线位置,在同步施工中由盾构机上的专门起重机吊放入位,再于两侧施工压重块、牛腿、路面板等现浇结构。
-
And the preparing method has the steps of: fixing the charge transfer complex on a scanning tunnel microscope, starting up the cut mode of the scanning tunnel, controlling the motion of pointer of the scanning tunnel, applying a voltage pulse between the charge transfer complex and the pointer, writing the information hole array in the charge transfer complex.
按如下过程进行制备:将电荷转移复合物固定于扫描隧道显微镜上,启动扫描隧道显微镜的刻写模式,控制扫描隧道显微镜的针尖的运动,在电荷转移复合物和针尖之间施加电压脉冲,在电荷转移复合物上写入信息孔阵。
-
On the basis of the knowledge highway's ruin of the past, in high earthquake intensity area of highway, underground structure may be fall into ruin for the seismic motion, especially, the entrance of tunnel is the weakest of the tunnel. As based on the soil-structure interaction model, adopting the soft of FLAC3D and numerical analysis method, the tunnel entrance has been computed by the elastic and plastic method, the results obtained are discussed and the measures for design and solution are presented.
根据以往的受震破坏经验,在公路隧道的高烈度地震带,地下工程可能会遭受严重震害,尤其洞口段为抗震薄弱区,本文采用FLAC3D软件,从土-结构相互作用模型出发,运用数值分析方法对隧道洞口段进行了三维弹性和弹塑性分析,得出了相应结论,并对结果进行分析,指出隧道抗减震设计中应注意的事项,并提出相应解决措施。
-
The deformation and failure model of tunnel induced by ground fissure is tensile failure, and tunnel cracks mainly appear in the footwall of ground fissure, but tunnel located in the hanging wall is basically good, which is just adverse to that the damage of buildings or structures on the ground surface caused by the ground fissure mainly in the hanging wall.
地裂缝作用下隧道变形破坏模式为拉张破坏,且隧道衬砌开裂主要出现在下盘距地裂缝14.0 m范围内,而位于上盘的隧道衬砌基本完好,这与地裂缝活动引起土体和地表建筑物的变形破坏主要发生在上盘刚好相反。
-
When the single pile just exists at the upside of the tunnel crown, the minimum safe distance between pile toe and tunnel crown is half tunnel diameter.
4桩体位于隧道拱顶正上方时,桩端与隧道拱顶间的最小安全距离为0.5倍隧道直径。
-
In company with nonstop rushing of the long-span tunnel construction, a matterstation encounter more and more. For instance, the demand of the present design and construction code is already insatiability with the need of long-span tunnel engineering design and construction. And both domestic and foreign concerned research output is not too much to refer. So the engineering design and construction on long-span tunnel has definite blindness of the approve use for reference.
随着大跨度隧道建设的不断涌现,所遇到的问题也越来越多,比如现行的设计与施工规范已经不能满足大跨度隧道设计与施工的需要了,但国内外有关的研究成果并不多,可借鉴的设计与施工经验较少,大跨度隧道的设计与施工带有一定的盲目性。
- 相关中文对照歌词
- 30 Seconds
- The Tunnel
- Tunnel Vision
- Tunnel Vision
- Wind It (Remix)
- Ritalin (Born In America)
- Vagina Mine
- Vagina Mine (Deflowering Mix)
- Vagina (Version)
- Vagina Mine (Alive At Club Nokia)
- 推荐网络例句
-
As of Tuesday, Google's results were still censored in China.
截至周二,谷歌的搜索结果仍受中国审查。
-
In order to make the positive action increase and negative one decrease, the sub-forces of the social factors must be adjusted to form a centripetal force.
在这一过程中,人的主体性发挥是社会有机体健康发展的灵魂。
-
Objective To investigate the relationship between the telomer ase activity and apoptosis in gastric cancer.
目的为了探讨胃癌组织中端粒酶与细胞凋亡的关系。