查询词典 wind tunnel
- 与 wind tunnel 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
China has been the major focus of the project by project, such as the Shanghai Pudong International Airport, the Shanghai International Circuit F-1, the first Chinese high Jinmao Tower in Shanghai, the Shanghai Tunnel Pipeline project, Datong, Shanxi Mining Bureau, Yangquan Mining Bureau, South Korea City Mining Bureau, Tatun coal-fired electricity, Shandong Yankuang, Tongchuan Mining Bureau, the Xiamen ABB, Nanjing Auto Electric Co., Ltd. Beihai Yinhe Electrical Technology Co., Ltd. Jiangxi Geological Engineering Corporation, China water conservancy and hydropower, 11, the China Water Conservancy The 13 water and electricity, water and electricity Baju, Zhejiang Institute of Water estuary, the Ministry of Water Resources Survey and Design Institute of the Northeast, Daikin Air Conditioning Co., Ltd., Shanghai Tunnel Co., Ltd. Shield subsidiaries, Shandong Rongcheng Haida Shipbuilding limited Company, Shanghai Shipyard, Jiangnan Shipyard, Qingdao Raytheon Electronics Co., Ltd., Guangzhou Jinglong Construction Machinery Co., Ltd., the company Baosteel Services Branch, Nanjing Nanrui Group of the dam project monitoring branch, Zhenjiang Eastern Air conditioning Accessories Co., Ltd, Beijing can work together wooden Technology Co., Ltd, China Aluminum shares of a company in Guizhou Branch, Huangshi Yangtze River PSA a limited liability company, Shanxi Cable Co., Ltd. of China, the altar Huacheng Electronics Co., Ltd., from Putian City Machinery Manufacturing Co., Harbin, Wei welding cutting complete sets of equipment Limited, and so on.
先后被国内各大工程重点项目采用,如上海浦东国际机场,上海F-1国际赛车场,中华第一高楼上海金茂大厦,上海隧道复线工程,山西大同矿务局、阳泉矿务局,韩城矿务局,大屯煤电,山东兖矿,铜川矿务局,厦门ABB、南京奥特电气有限公司北海银河科技电气有限公司江西地质工程总公司、中国水利水电十一局、中国水利水电十三局、水电八局、浙江省水利河口研究院、水利部东北勘测设计院、大金空调有限公司、上海隧道股份有限公司盾构分公司、山东荣成海达造船有限公司、上海船厂、江南船厂、青岛雷声电子有限责任有限公司、广州京龙工程机械有限公司、市政二公司宝钢分公司、南京南瑞集团大坝工程监测分公司、镇江东方空调设备配件有限公司、北京木联能工程科技有限公司、中国铝业股份有公司贵州分公司、黄石长江港务集团有限责任公司、晋中华线缆有限公司、金坛华诚电子有限公司、莆田市大起机械制造有限公司、哈尔滨华崴焊切成套设备有限公司等等。
-
This article focuses on research of prediction of rock-burst happened in Cangling extreme long-tunnel engineering, comparison of tunnel carving details in the performing stage and prevention measures.
通过对苍岭特长隧道岩爆问题的预测研究和施工阶段洞身开挖情况对比,以及针对本工程的岩爆防治措施研究,探讨了岩爆预测判据对苍岭隧道工程的适用性,揭示了苍岭隧道围岩的岩性特征和初始应力场,掌握了苍岭隧道岩爆发生的烈度和基本分布规律,提出了对岩爆问题的工程防治措施,另外,根据工程区地质条件和岩石物理力学性能参数,建立了相应的地质力学模型,采用有限元法建模反演分析,其结果与通过钻孔水压致裂试验测得的地应力结果比较,显得较为吻合,并得到施工阶段通过洞壁应力恢复法分析结果的验证,验证表明理论模型和有限元模型的适用性及分析应力场是较为准确和合理的,并在此基础上对苍岭隧道岩爆进行分段预测和采取了较有成效的工程防治措施,具有较高的工程应用价值。
-
The results of geostress measurement within two vertical boreholes of an extra-long railway tunnel are presented in this paper, and the distribution trend representing the whole tunnel is analyzed from the geological conditions.
文章首先介绍了某超长铁路隧道两个钻孔的地应力测量结果,并从地质条件出发分析了代表整个隧道的地应力趋势。
-
They are applied widely to full-mechanized mining face in the Pit, roadway of top grade general mining and common mechanical mining face and tunnel digging transport; equipped with gate stage loader, the tail links with conveyors on the work face, when they are used in tunnel digging transport, the tail equipped with belt conveyors links with header.
适用于煤矿井下综采工作面,高档普采和一般机采工作面的顺槽和巷道掘进运输;尾部配刮板转载机与工作面运输机相接。用于巷道掘进运输时,尾部配皮带转载机与掘进机相接。
-
By mechanics analysis of ground deformation, this paper makes a systematic research on the affecting factors of ground deformation of shield tunnel and excavation and establishes a predicted model of ground deformation based on neural network. This model is applied to predict actual ground deformation caused by shield tunnel and excavation in Shanghai, Guangzhou, Nanjing etc.
本文以盾构法隧道和基坑为研究对象,通过对地面变形机理的分析,全面系统地从理论上探讨了盾构隧道和基坑引起地面变形的影响因素,建立了基于神经网络的地面变形预测模型,并运用该模型对上海、广州、南京等城市的盾构隧道和基坑工程所引起的地面变形进行了实际预测,获得了令人满意的预测结果。
-
Based on the method used to calculate ground elastic displacement around deep tunnel and some researches on gap parameter of shield tunnel, a brief method for estimating subsurface ground horizontal movement induced by shield tunneling is presented.
在深埋隧道周围土体弹性位移计算方法及盾构问隙参数研究成果的基础上,通过相应的分析和假设提出了一种预测盾构隧道施工引起地表下土体水平变位的简便估算方法。
-
When the ground surface at the entrance of tunnel is sloping,the structure of double-arch tunnel with half-open and half-hidden structure is an optimum pattern to be selected.
连拱隧道半明半暗结构形式是隧道洞口地表偏斜地段的一种优选方案,针对该种结构形式进行合理施工方法的研究较少。
-
The conclusion could be referred as the basis for tunnel fire protection engineering in highway tunnel.
该结论可为我国公路隧道防火措施的制定提供有益的参考。
-
If we adopt hot-mix asphalt to construct the asphalt pavement of the tunnel,the heat and harmful gas exhausted by hot-mix asphalt can not be dissipated quickly,so the environment in the tunnel is very uncomfortable,this will affect the construction equipments continuous work and the builders health.
在这样长的隧道中如采用热拌沥青混合料施工,由于隧道空间相对封闭,热拌沥青混合料所释放出的热量和有害气体不能很快排走,使得现场施工环境恶劣,严重影响现场施工设备的正常运转以及施工人员的身体健康。
-
This text with the certain place iron stand and it close together zone tunnel for main research object, make use of currently at home and abroad acquire extensively applied of the software FLUENT of the calculation fluid mechanics point to railroad train the condition carries on when the subway website perhaps zone tunnel take place a fire analysis, and combine domestic and international related research the result tally up a subway a fire of characteristics.
本文以某地铁站及其相邻区间隧道为主要研究对象,利用目前国内外获得广泛应用的计算流体力学软件FLUENT重点对列车在地铁站台或者区间隧道发生火灾时状况进行分析,并且结合国内外的相关研究成果总结出地铁火灾的特点。
- 相关中文对照歌词
- 30 Seconds
- The Tunnel
- Tunnel Vision
- Tunnel Vision
- Wind It (Remix)
- Ritalin (Born In America)
- Vagina Mine
- Vagina Mine (Deflowering Mix)
- Vagina (Version)
- Vagina Mine (Alive At Club Nokia)
- 推荐网络例句
-
You can do some assertiveness training.
你可以进行一些自信训练。
-
We were well on the path to making a rear-wheel-drive global platform," says Mays."
我们正致力于建立一个后轮驱动的平台,"Mays这样说道。"
-
F: I think the oval shape suits you well.
我觉得这副椭圆形的可能很适合你。