查询词典 wind furnace
- 与 wind furnace 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The basic tea at the four major pieces: cold stove, with the wind Zhushui furnace; Tea kettle, iron Zhushui use of a covered large bowl; Tang bottles, tea with a mouth of the Daibing tank, said "urgent need"; Chawan, Sheng tea with the Ciwan.
其基本茶具分四大件:凉炉,煮水用的风炉;茶釜,煮水用的铁制的有盖大钵;汤瓶,泡茶用的带柄有嘴罐,称&急须&;茶碗,盛茶汤用的瓷碗。
-
Drive a vehicle of 1 foreword 125/32t is my factory the crucial equipment of molten steel of a swing, main task is seasonable transmitting; of stage of packets of Lian Zhu is big circumgyrate smoothly is the most crucial one annulus on steel-making production catenary, once have an accident, can suspend steel-making production, bring about blast furnace even cease wind, of this equipment move smoothly, very important.
梗概: 1引言125/32t行车是我厂一台吊运钢水的关键设备,主要任务是及时将转炉出来的钢水平安、平稳地转送到连铸大包回转台;是炼钢生产链上最关键的一环,一旦出事,会中断炼钢生产,甚至导致高炉的休风,这台设备的平稳运行,非常重要。
-
2 Ironmaking plant, the body is oxidizing and corrading heavily during baking furnace , the reason is the hearth has no protective brick and the high air quantity and wind pressure.
济钢第二炼铁厂1#高炉大修后炉腹以下全部采用铝碳砖砌筑,烘炉时铝碳砖砌体发生严重的氧化侵蚀,分析其原因是炉缸未加保护砖、风量和风压过高等。
-
Some examples of existing CDM projects are:installing a waste heat-recovery system into a coking plant; establishing a coal mine methane-utilisation scheme for households currently using coal, and installation of an electricity generation station fuelled by coal mine methane; capturing waste gases (blast furnace gas and coke oven gas) from the steel-making process for utilisation in a new, combined-cycle power plant; constructing a pilot biomass power plant, utilising cotton and corn straw as fuel, to generate electricity to be supplied to the North China grid system; capturing methane from a landfill to produce power for the local grid; establishing wind farms; and reforesting mixed-used forest in Guangxi.
现有的一些清洁发展机制项目例子有:在焦化厂安装余热回收系统;对家庭目前使用煤炭状况建立了煤矿甲烷利用计划并利用煤矿甲烷为安装的发电机提供燃料;从炼钢过程中获取废气用于一种新的循环电厂;利用棉花和玉米秸秆为燃料建设生物质能发电厂,发电提供给中国北部网格系统;从一个垃圾填埋场获取甲烷为本地网格发电;建立风力发电厂;对广西混合使用的森林进行重新植林。
-
Some examples of existing CDM projects are:installing a waste heat-recovery system into a coking plant; establishing a coal mine methane-utilisation scheme for households currently using coal, and installation of an electricity generation station fuelled by coal mine methane; capturing waste gases (blast furnace gas and coke oven gas) from the steel-making process for utilisation in a new, combined-cycle power plant; constructing a pilot biomass power plant, utilising cotton and corn straw as fuel, to generate electricity to be supplied to the North China grid system; capturing methane from a landfill to produce power for the local grid; establishing wind farms; and reforesting mixed-used forest in Guangxi.
现有的一些清洁发展机制项目例子有:在焦化厂安装余热回收系统;对家庭目前使用煤炭状况建立了煤矿甲烷利用计划并利用煤矿甲烷为安装的发电机提供燃料;从炼钢过程中获取废气用於一种新的循环电厂;利用棉花和玉米稭秆为燃料建设生物质能发电厂,发电提供给中国北部网格系统;从一个垃圾填埋场获取甲烷为本地网格发电;建立风力发电厂;对广西混合使用的森林进行重新植林。
-
On the crucible salt bath's furnace shell is loaded with the circular upper hood, the crown has the air vent to put through the wind system series, removes the noxious gas, lower part the upper hood has the cover gate which and the port hole two leaves may rotate.
坩锅盐浴炉的炉壳上部装有圆形上罩,顶部有排气口可接通风系统,以排除有害气体,上罩下部有两扇可转动的罩门和观察孔。
-
I plant in 1998, invested 450,000 yuan to carry out rectification Glass Furnace using Dust seal antihypertensive treatment after reaching effects, in order to enable wastewater to be fully utilized, I plant in September 2004 to invest 30,000 yuan into two wastewater clarifiers, and take advantage of production in August this year during the overhaul machinery investment of 1.8 million yuan to purchase the primer dust wind equipment, is currently running well and solved the problem of dust pollution, the number of environmental protection investment of about 500,000 yuan.
我厂于 1998 年投入 45 万元对玻璃池炉进行整改,采用水封降压除尘后达到了治理效果,为使废水得到充分利用,我厂于 2004 年 9 月投资 3 万元建成两座废水澄清池,并利用今年 8 月停产检修机器期间投资 1.8 万余元购置了引风除尘设备,目前运行良好,解决了烟尘污染问题,此几项环保投入资金约 50 万元。
-
The hot blast circulates evenly from the furnace up-wind leaf through 45° the stainless steel air deflector from the hearth both sides to the hearth lower part, through the suspension fork type stainless steel roller conveyer lower part the air flue, circulates the material plate base,passes through the material plate stainless steel mesh, through all workpieces, circulates evenly above material plate's return air guiding plate, forms a complete heated air circulation cycle, the high speed heated air circulation, causes in the material plate the workpiece temperature to be even sorepeatedly.
热风由炉顶风叶通过45°不锈钢风板均匀从炉膛两侧循环到炉膛下部,通过悬架式不锈钢滚道下部风道,循环到料盘底部,穿过料盘不锈钢网,均匀通过所有工件,循环到料盘上方的回风导板,形成一个完整的热风循环周期,如此反复高速热风循环,使料盘内工件温度均匀。
-
Hot-blast stove wind level control has also increased significantly, which has very important impact and significance for blast furnace smelting.
热风炉风温控制水平也有了明显的提高,对高炉冶炼具有非常重要的影响及重大意义。
-
The RF-340-2 hot blast electric furnace mainly provides the stable hot blast for each kind of drying plant, the hot-blast temperature and wind speed could adjust, and control temperature automatically.
RF-340-2热风电炉主要为各种烘干设备提供稳定的热风,热风温度和风速均可调节,并自动控温。
- 推荐网络例句
-
Plunder melds and run with this jewel!
掠夺melds和运行与此宝石!
-
My dream is to be a crazy growing tree and extend at the edge between the city and the forest.
此刻,也许正是在通往天国的路上,我体验着这白色的晕旋。
-
When you click Save, you save the file to the host′s hard disk or server, not to your own machine.
单击"保存"会将文件保存到主持人的硬盘或服务器上,而不是您自己的计算机上。