查询词典 well-beaten
- 与 well-beaten 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
1St, foreword main point: A, about Earth's internal heat circulation as well as successional variation process three important times: Birth time, lifeless time, until has the life time; B, the earth interior stone fruits archery target thermonuclear reaction, causes the earth interior material convection and the Earth revolve production as well as terrestrial magnetic field production three between relations; C, also has in has the life time, the vital activity to the entire internal heat circulation influence as well as to the earth's atmosphere influence; D, has the life time, in the stratum the coal and the petroleum, the natural gas and so on the fixed energy storage which as a result of energies and so on zoology and botany absorption transformation sunlight forms, to Earth internal heat circulation influence as well as with earth's crust each kind of movement relation, such as: The plate movement, the volcanic earthquake, the orogenesis, the Earth moves the fierce degree the periodic phenomenon and so on.
前言要点: A 、关于地球的内热循环以及演变过程的三个重要时期:诞生时期,无生命时期,直至有生命时期; B 、地球内部核物质的热核反应,引起的地球内部物质对流与地球旋转的产生以及地球磁场的产生三者之间的关系; C 、还有在有生命时期,生命活动对整个内热循环的影响以及对地球大气的影响; D 、有生命时期,地层中煤与石油、天然气等由于动植物吸收转化太阳光等能量而形成的固定能量存储,对地球内热循环的影响以及与地壳各种运动的联系,诸如:板块运动,火山地震,造山运动,地球活动剧烈程度的周期性现象等。
-
You can enjoy dining following her, because she knows well of many well-reputed restaurants and some well-liked traditonal snacks as well.
跟她一起享受美味,她对那些深受好评的饭店、餐厅了如指掌,还有那些深得大家喜爱的民间传统小吃。
-
According to Jinqiao mine auxiliary well surface soil s floor pour plasm reinforce and the introduce of wall of a well strain observation technology, this paper analyzed wall of a well s safety assurable technology during the pour plasm, and it put forward synthetic technique development way of deep surface soil breaking wall of a well.
通过对金桥矿副井表土段地面注浆加固及井壁应变观测技术的应用介绍,分析了注浆期间的井壁安全保证技术,提出了深厚表土层破裂井壁综合治理技术的发展方向。
-
The relation between the coseismic changes of water level and water temperature of artesion well has been analyzed by use of the coseismic data of Ms8.7 Sumatera earthquake and the structure information of well-aquifer system in the studied area. The physical model is established by simulating the changes of water temperature and water level of the well. The mechanism of coseismic response to distant earthquake in such artesian well is also revealed.
利用本溪自流井水位及水温对苏门答腊Ms8.7大震的同震响应资料,通过分析水位变化与水温变化的相互关系和研究区的井-含水层系统结构,建立了不同层位地下水混合的物理模型,并根据水位变化数据模拟出水温变化曲线,同时也揭示了同类型观测井水位与水温对远场大震的同震响应机理。
-
Currently, in the oil-field exploitation, existing the phenomenon of garbling the lack thickness of stratum with vertical fault-throw in well logging identification of strata while meeting fault in drilling well. In most case, consider the lack thickness of stratum which contrast the imperfection geologic strata thickness to the well and the well as the fault-throw. The method which using very popular in oil-field exist shortages, it very much easily lead people into the areas of misplay. especially when the seismic person and geology confirm the fault-throw, It often appear inconsistent instance.
目前,在油田开发中钻井钻遇断层时,地质人员时常存在将测井分层与相邻井对比时缺失地层厚度与铅直地层断距混淆的现象,很多情况下把井与井对比缺失地层厚度等同于断层断距等,这些现今在油田非常流行的用法存在一些不足之处,容易把人们引入一些认识上的误区,特别是在地震与地质人员进行断层断距的确定时,经常出现矛盾的情况。
-
Testing tech with pump can provide a direct basis for knowing reservoir property (formation effective permeability) of nonflowing well dynamically, well's completion degree and red situation of formation, adjusting exploitation plan in injection well to conduct next step of treatment (especially for new well in new district).
随泵测试技术为动态了解非自喷井油藏的储层特性,井的完善程度、地层亏空情况,调整注水开发方案进行下一步增产措施提供了直接依据。
-
A constant ultra-low density slurry system is developed to fit for three different thermometric well conditions,which means the low temperature well (BHCT:49℃),medium temperature well (BHCT:89℃)and high temperature well (BHCT:170℃).
研究出分别适用于低温(此处指井底静止温度为49℃的井况)、中温(此处指井底静止温度为89℃的井况)以及高温(此处指井底静止温度为170℃的井况)条件下的恒密度超低密度水泥浆体系。
-
Along with horizon development well to implement, some problem became more and more gravity, such as sandbody'scale and sandbody'boundary was uncertainty and layer pressure was uneqilibrium for different well area development degree is not community. These taked a few difficulty of comprehensive evaluaterating, deploying horizon development well, adjusting well trackway for the gas field, and it might take any geologic risk.
随着该气田水平开发井的逐步实施,其含气砂体规模及砂体边界的不确定性以及由于各井块开发程度的不均一性而导致的地层压力不均衡等地质难题都日益显现出来,这些都给该气田的全面评价、水平开发井部署和井轨迹的调整带来困难,并可能引起更大的勘探开发风险。
-
Any given oil well has a finite supply of oil, and the wells' production follows the shape of a bell curve. Extracting oil is cheap and easy on the curve's upslope but after the the well has peaked – the point at which half of the well's oil has been extracted – production becomes more difficult and expensive. The output of the well begins to decline and will never recover; production falls steadily and the cost to extract the oil rises.
由於任何一个油井都只有固定的供应量,因此每个油井的原油产量都会遵循钟型曲线:一开始汲取原油很便宜也很容易,因此曲线是上升的,但当油井的产量到顶之后–也就是油井中的原油存量已被汲取出一半时–原油的生产就会变得愈渐困难且昂贵,油井的输出产量也开始下降,而且再也无法恢复,所以产量也将持续减少、使得生产成本不断增加。
-
The upright artesian well is one of the main ways of artesian well of coal mine, its techniques includes four sections : artesian well ,prefabricating of the wall of well, prefabrication of the wall and filling.
煤矿立井钻井法是煤矿钻井的主要方法之一,其施工工艺主要包括:钻井、井壁预制、下沉井壁和壁后填充四个阶段。
- 相关中文对照歌词
- Well Well Well
- Well, Well
- Well Well Well
- Well, Well, Well
- Well, Well
- Well, Well, Well
- Well, Well, Well
- Well Well Well
- Well Well Well
- Well Well Well
- 推荐网络例句
-
Plunder melds and run with this jewel!
掠夺melds和运行与此宝石!
-
My dream is to be a crazy growing tree and extend at the edge between the city and the forest.
此刻,也许正是在通往天国的路上,我体验着这白色的晕旋。
-
When you click Save, you save the file to the host′s hard disk or server, not to your own machine.
单击"保存"会将文件保存到主持人的硬盘或服务器上,而不是您自己的计算机上。