英语人>网络例句>well-arranged 相关的网络例句
well-arranged相关的网络例句

查询词典 well-arranged

与 well-arranged 相关的网络例句 [注:此内容来源于网络,仅供参考]

The ratio of the well-testing data is used and the reliability of the analysis results can be also increased. The well pressure of a swabbing producing well can be calculated with this new model as well.

同时,利用该理论还可计算抽汲过程中任一时刻的井底压力和关井时刻的井底压力,解决了抽汲井难以计算关井时刻井底压力的问题。

The analysis result shows that Kun 2# well and its vicinities is the beneficial oil-gas bearing province in Kunyite depression, and the sealing of Kun 1# fault zone is well, and the well wall in Kun 2# well region is relatively stable.

分析结果显示,昆2井及其附近地区为该凹陷的有利成藏地区,且昆1断裂带的封闭性较好,昆2井地区井壁较为稳定

Drilling time will be lasted and lateral force on casing exerted by drill pipe will increase in case of drilling deep well, ultradeep well, high inclined hole, extended reach well and horizontal well, therefore, friction and wear between casing and drill pipe became a severe problem.

在深井、超深井、大斜度井、大位移井及水平井中,钻井时间延长、钻柱作用在套管上的侧向力增高,因此套管和钻柱的摩擦与磨损问题越来越突出。

ABSTRACT Drilling time will be lasted and lateral force on casing exerted by drill pipe will increase in case of drilling deep well, ultradeep well, high inclined hole, extended reach well and horizontal well, therefore, friction and wear between casing and drill pipe became a severe problem.

在深井、超深井、大斜度井、大位移井及水平井中,钻井时间延长、钻柱作用在套管上的侧向力增高,因此套管和钻柱的摩擦与磨损问题越来越突出。

Drilling time will be lasted and lateral force on casing exerted by drill pipe will increase in case of drilling deep well, ultradeep well, high inclined hole, extended reach well and horizontal well, therefore, friction and wear between casing and drill pipe became a severe problem.

钻杆接头与套管摩擦磨损问题的理论与试验研究套管磨损

The results show that the water breakthrough time shortens with the increase of the horizontal well length. Under the same well space and production conditions, the water breakthrough time of five-spot pattern is longer than that of seven-spot and nine-spot pattern. With the increase of angle between the horizontal well and the horizontal direction, the water breakthrough time shortens in five-spot well pattern, firstly increases and then decreases in seven-spot pattern, and increases in nine-spot pattern. The influence of reservoir and fluid parameters on the water breakthough time is little.

计算结果表明,井网的见水时间随水平井长度的增加而缩短;相同的井距和生产条件下,五点法井网的见水时间要长于九点法和七点法井网;随水平井与水平方向夹角的增大,五点法井网的见水时间缩短,七点法井网的见水时间先增加后缩短,九点法井网的见水时间增加;油藏和流体参数对井网见水时间影响不大。

In order to find out a simple and efficient method to calculate the water breakthrough time in combination well pattern of horizontal and vertical wells, simplifing a horizontal well into a vertical well with the same well-hole radius, and considering the unpiston-like displacement, the water breakthrough time formulas of five-spot, seven-spot and nine-spot pattern were derived and revised by equivalent percolating resistance method. In this method, the percolation region is divided into three resistance regions.

为了寻求一种简单、有效的计算水平注水井与直井联合井网的见水时间的方法,将水平井简化为具有等效井筒半径的直井,考虑水平井与直井联合布井水驱油的非活塞性,运用等值渗流阻力法将渗流区划分为3个阻力区,推导出了五点法、七点法和九点法水平井与直井联合井网的油井见水时间的计算公式和修正公式。

Throats are so easily blocked up for clay in rocks that the permeability decreases and the output is affected. The problem can be mostly worked out by inputting clay inhibitor into formations. Production well loggings, such as well logging of output profile, well logging of injection profile with five parameters, engineering well logging, were gained research in Hailaer oil field in this paper.

海拉尔油田是低渗透且具有断块性质的新开发油田,本文提出在对海拉尔油田开发进行地球物理监测时需要解决一系列关联的钻井地质工程问题,诸如岩石中富含粘土成分容易引起地层微粒堵塞喉道、孔道,从而导致渗透率下降现象,直接影响采油井产量。

Through the star communication network of VSAT Ku wave band was set up and linked with distance-controlled telephone network at the base, so as to realize the free communication between production unit field and management department at base, at same time, by using the information system of exploration production. it is realized that the specific data processing such as log profile along with drilling well, well logging curves, playback of log second data, real lime data of log instrument, and oil-testing data, geophysical data as well as web releasing function, with the geological data, the daily report of drilling well and oil-testing released onsite together, the dynamic information platform of exploration management has been established, which provides leaders at various level, research personnel and managers with an integrated, abundant data, dynamic information platform along with drilling.

通过建立VSAT Ku波段星状通讯网络,并将其与基地程控电话网络相连,一方面实现了野外生产单位与基地通讯的畅通;另一方面,应用勘探生产信息系统实现随钻录井剖面图、测井曲线、录井秒数据回放、录井仪实时数据及试油、物探资料等专业数据的处理及Web发布功能,与现场生产传输系统发布的地质、钻井、试油日报共同作为勘探动态管理信息平台,为基地各级领导、研究人员、管理人员提供了一个集成的、具有丰富资料的井场随钻动态信息平台。

Methods The retinae of 6 postnatal 2-3 days Sprague-Dawley rats were dissociated into cell suspension with trypsin digestion. The cell suspension was implanted in 96-well culture plates covered with murine-tail collagen in each well(1×105 cells/well). The concentrations of PGP solution were 1g.L-1-10-5g.L-1. The period of culture was 1,3 and 5 days respectively, Then, the OD of living cells in each well was tested by MTT colorimetric microassay.

6只生后2-3d Sprague-Dawley大鼠,视网膜采用胰酶消化法制成细胞悬液后接种于经鼠尾胶原处理的96孔培养板(每孔1×105个细胞),同时加入1g.L-1-10-5g.L-1PGP及DMEM,分别培养1、3、5d,用MTT法测量OD值。

第9/100页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
Well Well Well
Well, Well
Well Well Well
Well, Well, Well
Well, Well
Well, Well, Well
Well, Well, Well
Well Well Well
Well Well Well
Well Well Well
推荐网络例句

I am accused of being overreligious," she said in her quiet, frank manner,"but that does not prevent me thinking the children very cruel who obstinately commit such suicide.""

客人们在卡罗利娜·埃凯家里,举止就文雅一些,因为卡罗利娜的母亲治家很严厉。

Designed by French fashion house Herm è s, this elegant uniform was manufactured in our home, Hong Kong, and was the first without a hat.

由著名品牌 Herm è s 设计,这件高贵的制服是香港本土制造,是我们第一套不配帽子的制服。

Do not 'inflate' your achievements and/or qualifications or skills .

不要 '夸大' 你的业绩或成果,条件或者技能。