查询词典 welder
- 与 welder 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The company has many advanced ASM Units modernization aluminum pressure welder, and have a perfect management system.
公司拥有多台现代化先进的ASM铝线压焊机、及完善的产生管理系统。
-
This paper,based on analyzing the process of Cu-Al pipe butt welding, discussed the design of the executive system and control system for PLC controlled Cu-Al pipe butt welder .
在分析了铜铝管焊接工艺过程的基础上,重点论述了铜铝管对焊机执行系统和控制系统的设计。
-
FB Series Metallic Wire Butt Welder is used for welding all kinds of metallic wire.
FB系列金属针布对焊机主要用于梳棉机金属针布的焊接。
-
The Hot Spot Capacitive Discharge Welder is designed to help solve your thermocouple fabrication and attachment problems.
Hotspot电容放电焊接机是帮您解决热电偶制造和焊接的设备。
-
Major equipment includes: J1VMC400 FANUC Oi-MB processing center Taiwan, Mpq-30 CNC punch one Taiwan, Amada ARZES255NT NC-1 Taiwan, Amada RG-100 CNC bending machine Taiwan, Amada RG-355 NC% 1 Taiwan-bending, high-precision CNC lathes 10, a universal tool grinder Taiwan, 2-line cutting, a planer Taiwan, 315 t and 500 of a hydraulic machine Taiwan, welder 5, It-315T Punch 25 Taiwan, the single hexagonal automatic lathes 10, 22 meters lathe Taiwan, cutting plate machine 5, with 1 Saw Taiwan, a Taiwan unmotivated mill, a plasma cutting machine Taiwan, three welding, riveting head of a Taiwan, 63 T Bending Machine 1 Taiwan, three carbon dioxide arc welding; otherwise ordinary lathe, tapping machine, drilling and other equipment several.
主要设备包括:J1VMC400 FANUC Oi-MB 加工中心1台、Mpq-30数控冲床1台、Amada ARZES255NT数控冲1台、Amada RG-100数控折弯机1台、Amada RG-355数控折弯机1台、高精度数控车床10台、万能工具磨床1台、线切割2台、刨床1台、315t及500液压机各1台、对焊机5台、It-315T冲床25台、单轴六角自动车床10台、仪表车床22台、剪板机5台、带锯床1台、无心磨1台、等离子切割机1台、氩弧焊3台、铆头机1台、63T折弯机1台、二氧化碳保护焊3台;另有普通车床、攻丝机、钻孔机等设备数台。
-
The executive mechanism of Cu-Al pipe butt welder ,based on above,was designed,including its air system and mating clamper.
在此基础上,设计了铜铝管对焊机的执行机构,包括其气动系统和配套夹具。
-
Welding equipment, electronic pulse points / convex welder
我们将一如继往的为客户提供更好的产品、更好的服务。
-
Company mainly engages in ship repairing and modifacation project, the geographical position is good, abundant human resources and has a strong management team, the existing area 396000 square meters, wharf length 480 metres, 300 workers, specialized technical personnel are more then 150 people, after years of operation, we are accumulated rich experience in ship repair and technical managementand, company owns a six DWT floating dock (lifting force 15000 tons, 35 meters inner wider, 210 meters in length), equipped with first-class facilities workshop 10000 square meters, 6pcs.of elevated car, 4 sets of 15 tons dock crane , 2 sets of 3060 type portal jib crane, more than 200 sets of equipments, air compressor, lathe, electric welder, CO2 welders etc.
公司主要从事国内外船舶厂内坞修及航修和船舶改造工程,公司所处地理位置佳,人力资源丰富,拥有强大的管理团队,现有土地396000㎡,在建码头480米,职工300人,其中专业技术人员达145人以上,经过多年运营,在船舶修理及改造工程中累积了丰富的船舶修理改造和技术管理经验,公司拥有6万吨级浮船坞一座(举力15000吨,内宽35米,长210米),配备一流的硬件设施厂房10000多平方米,高架车6台,坞吊15吨4台,门吊3060型2台,另有空压机、电焊机、 CO2焊机、车床等各类设备200多台。
-
The main production equipment has a large bending machine, shearing machine, VS-300 metal profile circular saw machine, automatic multi-type spot welder, Y32-315F Four-column hydraulic press, J23-63 four-post presses, such as open dumping windows the production of special equipment and can produce its own large-scale mold tooling, in order to ensure product quality and new product development to provide strong technical support.
主要生产设备有大型折弯机、剪板机、VS-300金属型材圆锯机、自动多头式点焊机、Y32-315F四柱液压机、J23-63四柱开式倾压力机等门窗制作专用设备,并可自行制作大型工装模具,为确保产品质量和新产品研制提供强有力的技术保障。
-
I have a new Hobart 185 amp Mig welder.
我有一个新的霍巴特一百八十五安培MIG焊机。
- 相关中文对照歌词
- Jock The Singing Welder
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。