查询词典 water-way
- 与 water-way 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the explore in water seepage mechanism of highway engineering, at the foundation of author's and other people's research, the author study the groundwater seepage and infiltration of rain and water with the groundwater dynamics, the rock mechanics ,the soil mechanics, the hydrologic geology, the engineering geology, the agrology. With the research result of the water seepage mechanism of highway, the author also study the principle design of waterproof, drainage and water environmental protection. The author's work is as follows:(1) The water circulation, the groundwater type and conversion, the equilibrium and circulation in soil water are introduced and studied; The seepage characteristics of rock and soil in response to stress are analyzed and studied.
作为在"公路工程地质环境中水渗流机制问题研究"中的探索研究,在本人科研和前人研究工作的基础上,以地下水动力学、岩土力学、水文地质学、工程地质学、土壤学为基础,研究公路工程建设对地下水渗流和雨水入渗的影响,以及公路防排水和水环境保护设计的原则方法,具体开展了如下研究工作:(1)首先对水循环、地下水类型及转化、土壤水平衡与循环进行了研究和介绍;分析研究了应力对岩土体渗流特性产生影响的机理。
-
Because the fish drying Shrinkage small Shrinkage crack surfaces, more in Water, so the bibulous rate of early (see figure 4) soon, absorbing ability, 1.2 m in bibulous rate (Water absorption Measurement can reach 1 36), In the early EHD water are slower, bibulous rate in 30 m in later, when the water absorption speed enough time to also can achieve higher bibulous rate and natural drying EHD with dry bibulous rate basic same, in addition, natural drying and EHD dry fish good water resistance, 120 m in water can still keep complete shape after drying fish, but by 120 m in pieces after absorbing began.
由于热风干燥鱼的收缩率较小、表面有较多缝隙,所以在吸水初期的吸水速度很快(见图4),吸水能力很强, 120 m in 吸水率可达到1。 36; EHD在吸水初期的吸水速度均较慢,在30 m in以后吸水速度加快,当吸水时间足够时也能达到较高的吸水率,自然干燥与EHD干燥的吸水率基本相同,另外,自然干燥和EHD干燥鱼的耐水性好, 120 m in 吸水后仍能保持完整形状,而热风干燥鱼经120 m in 吸水后即开始溃散。
-
The steam acts upon the surface of the water in the receiver, which surface only being heated by the steam, it does not condense, but the steam gravitates or presses with an elastic quality like air, and still increasing its elasticity or spring, until it counterpoises, or rather exceeds, the weight of the column of water in the force pipe, which then it will necessarily drive up that pipe; the steam then takes some time to recover its power, but it will at last discharge the water out at the top of the pipe You may see on the outside of the receiver how the water goes out, as well as if it were transparent; for, so far as the steam is contained within the vessel, it is dry without, and so hot as scarcely to endure the least touch of the hand; but so far as the water is inside the vessel, it will be cold and wet on the outside, where any water has fallen on it; which cold and moisture vanish as fast as the steam takes the place of the water in its descent.
&&蒸汽行为后,水面在接收端,而只是表面被加热水蒸汽,它不浓密,但相互依赖蒸汽或印刷机具有弹性质量一样的空气,并仍在增加其弹性,或春天,直到它网,而超过重量栏水警队管道,然后它一定会推到管;蒸汽则需要一段时间来恢复其权力,但它会在最后排放水出顶管,你可以看到外面的接收机如何当然水,以及如果它的透明度;,目前为止由于蒸汽载船,它是未经干燥,所以作为热几乎要忍受至少触摸的手;但到目前为止,由于水内的船只,将寒冷和潮湿对外面,那里没有水落下;其中寒冷和水分消失快蒸汽需地方水在其后裔。
-
In the metallurgy profession, small steel plant waste water pollution, which mainly has the acid and alkali waste water, the waste water of containing oil, the emulsion waste water, recalculated cooling water and the desalinization water treatment and some domestic waste water.
冶金行业中小钢铁废水污染,一般主要有酸碱废水、含油废水、乳化液废水、循环冷却水处理和脱盐水处理及部分生活污水。
-
Jiangxi Provincial Water Resources Department Director of SUN Xiao-shan traveled to the shore of Poyang Lake is located in Xingzi County, Jiangxi Province, Poyang Lake Water Environment Monitoring Center held a forum to seriously listen to Provincial Hydrological Bureau and the Poyang Lake Hydrographic Office person in charge on a comprehensive work program to carry out the Poyang Lake water quality monitoring reports, etc., and discussions with relevant experts to listen to opinions and suggestions, but also by boat in-depth Pan Yang Lake, examining Duchang County hydrological stations, hydrological stations, and Tong Yam DUCHANG COUNTY Kornhill hydrological station, a cordial call on the fighting in the first line of grass-roots hydrological workers to understand the grass-roots hydrological conditions and water quality monitoring of workers and staff to carry out work of a comprehensive program of work on the elaboration of a comprehensive monitoring of water quality of Poyang Lake launched to promote the Poyang Lake water and water environment protection.
9 17,江西省水利厅主任孙晓山奔波于鄱阳湖滨,是在星子县,位于江西省,鄱阳湖水环境监测中心召开座谈会,认真听取省水文局和鄱阳湖水文局负责人就一项全面的工作计划,开展鄱阳湖水质监测报告等,并与有关专家讨论,听取意见和建议,而且还乘船深入Pan杨拉珂,研究都昌县水文站,水文站,与棠荫都昌县康山水文站,就在基层第一线战斗的基层水文职工亲切看望,了解基层水文条件和水的质量监测和工人工作人员进行了一对鄱阳湖水质量综合监测制定一项全面的工作方案开展工作,促进鄱阳湖水资源和水环境的保护。07.9.24
-
Rated at extraction conditions, one pump is running, because the cycle of water to reduce the system's water resistance decrease the flow of water pumps 12274T / H, head will drop to 15.0-16.0 m, in the extraction steam turbine at the maximum operating conditions, the recycled water to meet the system requirements to run a pump, because of substantial reduction in the volume of water supplied, so that substantially improve pump head, a direct result of the cooling tower water gushing, increase淋水device with a flow rate of the sink, fill up water in the hot淋水exchange reduce the time and reduces the cooling effect of cooling towers.
在额定抽汽工况下,一台水泵运行,由于循环水量减少、系统的水阻下降,水泵的流量12274T/H,扬程将下降至15.0-16.0米,在汽轮机在最大抽汽工况时,为满足循环水系统要求运行一台水泵,由于供水量大幅度减少,使水泵扬程大幅度提高,直接造成冷却塔涌水,加大淋水装置配水槽的流速,水流在淋水填料上热交换的时间减少,降低了冷却塔的冷却效果。
-
This study mainly focused on the water resource and environmental crisis, which are all caused by agricultural irrigation in Inner Mongolia irrigation area. Based on the balance of total water quantity between ground water, underground water and soil water, a study was made on the water quantity varieties in the headraces and offtakes, and the affection of the water cycle under the human activities was quantitively caculated.
针对引黄灌区所面临的水资源问题及灌溉引起的环境问题,以内蒙古河套灌区为研究对象,从灌溉引水、用水、排水之间的转化关系为切入点,以地表水、土壤水和地下水之间的水量平衡理论为基础,定量研究河套灌区在人类影响条件下的水循环特征。
-
General layout: General idea should focus on protecting urban water sources, restoring riverways, wetlands and groundwater, improving the water body function, strengthening water resources allocation and water function regions management. Based on existing water project structures, the generallayout follows as that urban water sources conservation on the upriver, wetland and groundwater restoration on mid-river and coastal wetland and estuarine eco-area restoration on the downriver, achieve the target that rivers and lakes 'connection, green bank, clean water, flowing river', then form aquaticecosystem protection and guarantee system.
以保护城市水源地为重点,以修复河道湿地、地下水和改善水体功能为核心,以强化水资源配置和水功能区管理为关键,基于现有的水利工程体系,在流域上游建立以城市饮用水水源地为主体的生态保护屏障,在流域中游建设以湖泊为点、河道为线、地下水为面的水生态修复系统,在流域下游构建以滨海湿地和入海河口为中心的生态恢复区,遏制水土流失,增强水源涵养,保护水功能区,实现河、湖&连通、绿岸、清水、流水&,进而形成防控结合的水生态环境保护与修复保障体系。
-
This study mainly focused on the water resource and environmental crisis, which are both caused by agricultural irrigation in the Inner Mongolia irrigation area. Based on the balance of total water quantity between ground water, underground water and soil water, a study was made on the water quantity in the head races and offtakes, and the effect of human activities on the water cycle was quantitatively calculated.
针对引黄灌区所面临的水资源问题及灌溉引起的环境问题,以内蒙古河套灌区为研究对象,从灌溉引水、用水、排水之间的转化关系为切入点,以地表水、土壤水和地下水之间的水量平衡理论为基础,定量研究了河套灌区在人类影响条件下的水循环特征。
-
The invention comprises sprinkler, water pipe, water valve, and pump with large flow or high-level water tank. Sprinklers are set on the water pipe evenly. The upper of water pipe is connected with the pump with large flow or high-level water tank by water valve. In installing said sprinklers are located above the spray nozzle of surface evaporative air cooler.
本发明包括喷头、水管、水阀、大流量水泵或高位水箱,水管上均匀设置喷头,水管的上游通过水阀连接大流量水泵或高位水箱,安装时所述喷头位于表面蒸发式空冷器喷淋管的上方。
- 相关中文对照歌词
- Down Into Muddy Water
- Bridge Over Troubled Water
- Hell Or High Water
- Hot Water Burn Baby
- Don't Ask For The Water
- Muddy Water
- Walk On Water
- Water
- Turn On The Water
- Bridge Over Troubled Water
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。