查询词典 water-washed
- 与 water-washed 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the channel regulating work, regulating structures such as groyne, longitudinal dam are used to change water depth, water velocity and water surface slope of the channel.
航道整治工程中,常采用修建整治建筑物如丁坝、顺坝等来改善河流的水深、流速、水面比降,使河流达到通航要求。
-
Calves in group 1were fed by traditional model(power feed + guinea grass),fresh milk 4L/d and warm water, and were trained to ingest guinea grass freely; Calves in group 2 were fed with fresh milk 7L/d and warm water, and were trained to ingest pellet concentrate freely; Calves in group 3 were fed with fresh milk 7L/dand warm water, and were trained to ingest pellet concentrate added with yeast culture(20g/d). Calves in group 2 and group 3 were forbidden to contact guinea grass.
处理组1中犊牛按照传统模式饲喂,日哺喂鲜乳4L,饮温水,逐渐增加精料饲喂量,羊草在犊牛入舍后便训练其自由采食;处理组2犊牛日哺喂鲜乳7L、饮温水,自由采食颗粒精料;处理组3犊牛日哺喂鲜乳7L,饮温水,自由采食颗粒精料并禁饲羊草,在处理组2日粮基础上每日添加20g酵母培养物。
-
Headwaters resource protection, water pollution control and sustainable utilization of city drinking water resources have become an important target of city water management.
保护水源、治理水污染,实现饮用水资源的可持续利用成为城市水管理的重要目标。
-
N transfer Taocha Headwork water diversion project is run by the State Council approved the construction of the national large-scale water conservancy project is a project of N transfer an important part of both the water diversion project Headwork middle main channel Butterfly Valveswater diversion headworks but also Danjiang auxiliary dam reservoir engineering design for the new site redevelopment and build more power stations buildings are mainly cited sewers grvity induced gate stilling basin power plant and management of space and so on.
南水北调中线陶岔渠首枢纽工程是经国务院南水北调办批准建设的国度大型水利工程,是南水北调中线一期工程的重要状干部分,渠首枢纽工程既是南水北调中线输水总干渠的引水渠首,也是丹江水库的副坝,工程设计为新址重建,并增建发电站,建筑物主要有引渠、重力坝、引水闸、消力池、电站厂房和治理用房等。
-
According to Einstein's theory, if the temperature of 1 gram of 0 ℃ water, heated to 100 ℃ water absorption heat of the 100 card, then the quality of water has also increased.
按照爱因斯坦的理论,如果把1克温度为0℃的水,加热到100℃水吸收了100卡的热量,这时水的质量也相应增加了。
-
The heat transfer coefficient in the different water press, water flux and compared with the actual heat transfer coefficient the error in 5%~9% are got in the tests, It is shown that the tests of the nozzle heat transfer character provides proof for rational disposal nozzles and optimizing secondary water cooling system.
通过对喷嘴传热性能的测试,得到了水/气-水喷嘴在不同喷水压力下的传热系数;实验得到的双喷嘴平均传热系数与生产过程数据计算的传热系数的误差在5%~9%以内,研究结果表明喷嘴传热性能的热态实验可以为合理布置喷嘴、优化二冷制度提供依据。
-
The company has gas-fired water heater, electric water heater manufacturing plant; specializing in the production of wall-mounted gas water heater heating plant.
公司拥有燃气热水器、电热水器的生产厂房;专业生产壁挂式家用燃气取暖热水器厂房。
-
The results showed that a group of drinking water, 40 minutes, flip the temperature has not been restored, while the drinking water, a group of hesperidin, only 30 to 35 minutes in hand on the back to the pre-soaked in cold water temperature, fingertip capillary blood flow significantly improved.
结果表明,喝纯水的一组,40分钟后手的温度仍未恢复,而喝橙皮甙水的一组,只需30至35分钟手就恢复到冷水浸泡之前的温度,指尖的毛细血管血流明显改善。
-
The priorities are the diversification characteristics of each targetin the subsequent water flooding. According to diversification characteristics of these targets,the paper studies how the heterogeneousness, water flooded condition, interconnectingcondition of zone;key measures injector parameters affect these targets from polymer floodingmechanism. Based on influence equations, production target prediction models are built usingHall curve theory, relative permeability curve, relations of water saturation and relativepermeability and material balance equation. Parameters of models are calculated by the way ofcomputer program and so that a simple, fast way have been gained to predict production targetof polymer subsequent flooding.
针对这些指标的变化特点,从聚合物驱油机理上分析其油层非均质性、油层水淹状况、油层连通状况、主要措施及注入参数等因素对这些指标的影响,在分流方程的基础上,利用霍尔曲线原理、相对渗透率曲线、含水饱和度与相对渗透率之间的关系以及物质平衡方程建立起开发指标预测模型,结合数学方法对模型参数进行计算,形成简便、快速、实用的聚合物驱后续水驱阶段开发指标预测方法。
-
Bath Therapy: The temperature around 40 degrees Celsius water, into the basin, each hip bath 10 ~ 30 minutes, the water temperature is lowered and add an appropriate amount of hot water, one day ~ 2 times, 10 days for a course of treatment
坐浴疗法:将温度在40摄氏度左右的水,倒入盆内,每次坐浴10~30分钟,水温降低时再添加适量的热水,每天1~2次,10天为一疗程
- 相关中文对照歌词
- Down Into Muddy Water
- Bridge Over Troubled Water
- Hell Or High Water
- Hot Water Burn Baby
- Don't Ask For The Water
- Muddy Water
- Walk On Water
- Water
- Turn On The Water
- Bridge Over Troubled Water
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。