英语人>网络例句>water-washed 相关的网络例句
water-washed相关的网络例句

查询词典 water-washed

与 water-washed 相关的网络例句 [注:此内容来源于网络,仅供参考]

The experimental results suggested that there were some rules during the fermentation as follows: pit temperature increased rapidly and then dropped at the beginning of the fermentation and kept stable eventually at 20~22 ℃; there was slight change in yellow water pH value at first and then pH value decreased gradually in middle fermentation stage and finally kept stable; the change rules of total acids of yellow water were opposite to pH change rules; the reducing sugar of yellow water increased at first and then dropped and kept stable eventually; there was almost no change in alcohol content of yellow water in prior fermentation period, and then it increased rapidly and dropped slowly and finally kept stable; gas production rate was as high as 550 L/d within the first week in fermentation and then dropped undulatingly and changed to zero or even negative gas production rate.

窖池温度在发酵前几天迅速升高,然后下降,最后趋于稳定,保持在20~22 ℃;黄水pH开始变化不大,中间逐渐下降,最后趋于稳定;黄水的总酸变化与pH相反;黄水中还原糖先升高后下降,最后基本保持稳定;黄水中酒精含量在发酵前期变化不大,后期先是迅速升高,然后缓慢下降,最后趋于稳定;在发酵前期一周内,产气量很大,最高达550 L/d;之后产气量呈波动式下降并逐渐平稳,最后趋于零甚至负产气量。

Over a 20-year period there was no increase in soil water content in the grazed grassland at depths of 2~9.9 m. There was a small increase(0.5~3.7 mm/a) in soil water content in the protected grassland, however the slow rate of increase suggests that at least 150 years would be needed for ungrazed grassland soils to regain water content similar to that present prior to planting trees. Recharge of deep soil moisture was faster in cropland(15 mm/a), but at this rate it would still take about 40 years to restore cropland soil water content to pre-plantation conditions.

结果表明,人工林死后的放牧荒坡在20a的时间里,其土壤水分没有补偿;人工林死后的保护草地土壤水分有微弱恢复迹象,但年恢复速度在0.5~3.7 mm之间,以这样的速度恢复到持续放牧荒坡的土壤含水量,至少需要150a以上;林后农地土壤含水量有恢复趋势,年平均恢复速度为15 mm左右,其土壤含水量要恢复到持续农地当前的水平,大约需要40a的时间。

Just like a red, blue, or white lotus — born in the water, grown in the water, rising up above the water — stands unsmeared by the water, in the same way I — born in the world, grown in the world, having overcome the world — live unsmeared by the world.

就像一朵红色、蓝色或白色的莲花──它生於水中、长於水中、矗立於水面之上──而不被水所染污。同样地,我出生在这世间,生长在这世间,超越了这个世间──而不被这世间所染污。所以,婆罗门!

Introduced the principles of hydrodynamics in the household hot water heating system,Analyzed characteristics of hydrodynamics in the household hot water heating system,using unequal temperature reduction hydraulic balance method,established hydraulic analysis mathematics model for household hot water heating system.Using the model analyzed the upfeed system of household hot water heating in engineering.

介绍了分户式热水供暖系统的水力工况原理,通过分析分户供暖系统的水力特点,应用不等温降的管网水力平差的计算方法,建立了分户供暖管网系统水力分析的数学模型,并应用该模型对工程中习惯采用的下供下回式分户热水供暖系统进行了分析,编制了水力分析软件。

No life without water, for more than one century, VAG has offered high-quality, long-life, reliable, and economic-effective solutions from water storage within dams and reservoirs to water transmission, distribution and waste water treatment.

VAG阀门广泛应用于市政,电力,水处理及其各个工业领域,并与其优秀的品质和完善的服务在国际上享有很高的知名度。

It is composed by the activated carbon filter , the precision filter , the ion exchange , the security filter , the circulating water pump , the static pressure tank and vaporing make - up water treatment equipment and so on , constitutes a set of complete cobalt well water circulation processing devices , through the stainless steel pipe which buries in advance connected with the cobalt well water

它由活性炭过滤器、精密过滤器、离子交换器、保安过滤器、循环水泵、静压供水箱和蒸发补水的制水装置等组成,构成一套完整的钴源井水循环处理器,通过预埋的不锈钢管与钴源井水相连。

Field survey, sampling and testing were used to discuss the characteristics of soil water content between different subsidence stages. The results show that after mining collapsing, the soil water content and soil water storage capacity of subsidence area is obviously less than the nature area, especially for the fissure zone. It is indicated that the collapsing fissures are extremely disadvantageous for soil water-holding capacity and the conditions of vegetational cover on the subsidence area also confirmed this result.

现以神府东胜煤田为研究背景,选择两个主要塌陷阶段分布区大柳塔矿区双沟村原农场和补连塔矿区原补连沟村作为研究区,采用野外勘查、取样测试与室内参数分析综合研究的方法,对采矿塌陷不同阶段表层包气带土壤水分进行对比分析,结果表明,采矿塌陷后,塌陷区尤其是塌陷裂缝区的土壤含水量与土壤储水量值均小于未塌陷区,说明塌陷裂缝对土壤的持水作用具有非常不利的影响,塌陷区与未塌陷区的地表植被覆盖情况也证实了这一点。

The artifical fillers are hung under the plant floating bed then the remedial system combined by plant and microorganism came into being. The remedial effectiveness of the system was visibly better than that of the phytoremediation alone. So when the temperature is higher the remedial system combined by plant and microorganism is the preferable remedial technique to remedy contaminated water. In autumnal end and winterly outset, the temperature is lower, the plants begin to fade and die, and the plant must be harvested lest the relict of plant should contaminate water again. At the same time the technique combined by immobilized nitrogen cycling bacteria and microorganism which already existed in the water was used to remedy contaminated water.

将人工填料悬挂于植物浮床下,形成植物和微生物相结合的修复系统,其修复效果明显好于单独植物修复技术,因此温度较高时用植物和微生物共同结合的生物修复技术修复水体污染;秋末冬初温度较低时,植物开始死亡,必须将植物收割,以免植物残体造成二次污染,此时用固定化氮循环细菌和水体中原有微生物相结合的技术来修复水体的污染。

From seeding to florescence phase, water consumptions of potato of Wote15, Wote30, PAM15 and PAM30 were significantly lower than that in CK. From seeding to harvest phase, water consumption of potato of all treatments had no difference with that in CK. In florescence and harvest phase, water use efficiency and water output rate of Wote and PAM treatments were super significantly higher than that in CK.

从播种到花期沃特、PAM穴施用量15和30 kg/hm2处理的耗水量显著低于对照,从播种到收获期不同处理的耗水量与对照无显著差异,但花期、收获期不同处理的水分利用率和水分产出率均极显著高于对照。

Our main products are:-36000 bottle 5000 bottles per hour hot filling, temperature filling, aseptic cold filling beverage production line of a full set of 5000 bottles per hour -36000 bottle of mineral water, pure water production line 5000 bottles per hour -20000 gas bottle beverage production line -1800 barrels 150 barrels per hour, 3 gallons, 5 gallons barreled water production line a variety of water treatment equipment bad machine PET injection and blow molding machine plate and tube UHT devices, CIP System whole plant turnkey project

公司主要产品有:每小时5000瓶-36000瓶热灌装、中温灌装、无菌冷灌装饮料全套生产线每小时5000瓶-36000瓶矿泉水、纯净水生产线每小时5000瓶-20000瓶含气饮料生产线每小时150桶-1800桶,3加仑、5加仑桶装饮用水生产线各种水处理设备 PET注坏机及吹瓶机板式和管式UHT装置、CIP系统整厂交钥匙工程

第60/100页 首页 < ... 56 57 58 59 60 61 62 63 64 ... > 尾页
相关中文对照歌词
Down Into Muddy Water
Bridge Over Troubled Water
Hell Or High Water
Hot Water Burn Baby
Don't Ask For The Water
Muddy Water
Walk On Water
Water
Turn On The Water
Bridge Over Troubled Water
推荐网络例句

And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.

同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。

Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.

运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。

If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.

如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。