英语人>网络例句>water-supply engineering 相关的网络例句
water-supply engineering相关的网络例句

查询词典 water-supply engineering

与 water-supply engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]

Combined with practical engineering,the author introduces the design and construction elements of deepwater high-rise pile cap foundation,and illustrates it from the construction of steel temporary bridge,construction of above-water operating platform and bored cast-in-situ pile,and construction of steel suspension box ,in order to offer a reference for similar engineering.

结合工程概况,介绍了深水高桩承台基础的设计及施工要点,着重从钢便桥修建、水上作业平台及钻孔灌注桩施工、钢吊箱施工等方面进行了阐述,从而为同类工程提供了参考。

Products include PLC, Touch Panel, VVVF, AC servo system, power distribution control, numerical control systems, but also to the field of enterprise customers tip of technical services, technical engineering staff of the PLC, Touch Panel, inverter, servo , step, such as automation and control systems, has a wealth of practical experience in engineering, a lot of companies have successfully carried out for the system design and technical transformation projects, covering machine building, metallurgy, textile, printing and dyeing, paper making and printing, food processing, water treatment and other industries to provide better and more efficient services.

产品包括PLC、触摸屏、变频调速器、交流伺服系统、配电控制产品、数控系统,同时也向该领域企业客户提供先端的技术服务,公司技术工程人员对PLC、触摸屏、变频器、伺服、步进等自动化控制系统等,有着丰富的实际工程经验,先后为很多公司成功进行系统设计和技术改造等项目,范围涉及机械制造、冶金、纺织、印染、造纸及印刷、食品加工、水处理等行业,提供更好、更快的服务。

The selection of geological prospecting in different stages(initial-prospecting, detailed-prospecting)(2)the selection of geological prospecting in the deep-laid and shallow-laid of tunnel project (3)the selection of geological prospecting of tunnel projecting in different geological conditions Finally, the author summed up main problems needing to be solved in tunnel engineering geological prospecting as follow:(1)differentiate stratum and find out the depth and thickness of different stratums in the tunnel section (2)find out geological structure and existence situation of fault, broken zone and weak plane (3)find out weathering level of bed rock to classify surrounding rock combining speed materials (4)differentiate stratum structure of the entrance of tunnel to judge the stability of it (5)find out existence situation and performance of ground water (6)situations of other harmful geological phenomenon In view of above problems and classification of surrounding rock, the author showed principles of rational choosing of methods in geological prospecting and counted disperse range of physical character parameter value in different petrosal character, getting achievements as follow:(1)summarization of effect, merits and demerits of different geological prospecting methods in the tunnel geological investigation (2)method selection and arrangement principle of tunnel engineering geological prospecting in different geological conditions and prospecting stages (3)According to previous experience and cases, the author concluded the物性parameters most in use ,and showed the basis of selecting geological prospecting methods in different geological conditions.

论文中用几个应用实例来说明:(1)不同勘察阶段物探工作的选用;(2)深埋、浅埋隧道工程物探工作的选用;(3)不同地质条件隧道工程物探工作的选用。最后总结归纳出隧道工程物探所需要解决的问题主要有:(1)划分地层,查明隧道通过剖面的各地层深度与厚度。(2)查明地质构造,隧道轴线段有无断层、破碎带、软弱层面等。(3)查明基岩风化程度,从而结合速度资料进行围岩分级。(4)划分洞口地层结构,判断洞口稳定性。(5)查明地下水赋存情况及其活动动态。(6)其他不良地质现象存在情况。针对上述需要查明的地质问题与计算围岩分级情况,论文提出合理选用物探方法的原则,并统计了物性参数值在不同岩性中的分布范围。得出以下研究成果:(1)总结出各物探方法在隧道地质调查中的作用和优缺点。(2)得出不同地质条件下和不同勘察阶段,隧道工程物探方法选择和布置的原则。(3)根据以往工作经验和事例,对常用的物性参数进行了归纳总结,同时介绍了不同地质条件下物探方法选择的依据。

Design of underground cavity is frequently used in water conservancy and hydropower engineering as the development of national hydroelectricity engineering.

随着国家水电事业的发展,水利水电工程中经常会遇到地下洞室的设计问题。

This article is based on the engineering of Huluding bridge in Nanning provinces, and take the foundation of deep water as research object, introduced the whole process of the engineering ,from perambulation、design to construction.

本论文主要以南宁市葫芦鼎大桥工程项目为背景,以深水基础作为研究对象,从工程的勘查、设计到施工过程进行全面系统的介绍与分析,并根据本工程的具体情况借鉴国内外相关工程项目的实施经验,对设计参数、设备选型及施工工艺等方面作了全面的研究。

The corporation to develop from the action scilicet that establish, production and promotion new material and in lieu of iron, supersede the lumber product the material for oneself to allow, resolve the evolution that the Chinese material resource in push supersedes, supersedes the iron, lumber vocation, the amalgamation sets out from the current problem " City trap " in settle, cooperates with the science and engineering university south of R.O.C., Hubei the science and engineering university development section grinds, the year of on stream produces 50,000 high and strong and colorful manhole cover of compound material, water grate, the year produces 150,000 even meters the high and strong and colorful tree of pattern of landscape of round the trench the blind flange, low cost substitution iron no burn brick 、building block produce with the stock, the new uses the stock with the cargo, diseases of compound material road cage、 protective cage of pattern of landscape, the low cost site the photocopy to model the culture bricks, the productive capacity of the set grasses bricks, curb stone, compound calcium silicate culture stone, careful choose to anticipate, set the new formula, amalgamation can seconded client the necessity designs the build, color, pattern sign, green environmental protection, and hue saturation, the texture is delicate, the employment put together economic effects, social performance is very addicted.

公司自成立之初即以研发、生产及推广新型材料及替代铁、替代木材产品材料为己任,立志于推动中国材料资源替代、替代铁、木材行业的发展,并从解决当前"城市陷阱"这一问题出发,与华南理工大学、湖北理工大学开展科研合作,投产年产5万套景观型高强彩色复合材料检查井盖、雨箅,年产15万平米景观型高强彩色树围沟盖板,低成本代铁免烧、砖砌块生产用托盘,新型商用货用托盘,景观型复合材料道路隔离栏、护栏,低成本现场压印成型文化路面砖,植草砖、路沿石、复合硅酸钙文化石的生产能力,严谨选料,创新配方,并可根据客户需要设计造型、颜色、图案标志,绿色环保,而且色彩饱和,质感细腻,使用综合经济效益、社会效益很好。

In this thesis, the engineering property of the frozen earth in the frozen railway roadbed in Anduo section (between DK1561+975-DK1562+530) of Naquhe region of Qinghai-Tibet railway was studied indoor. The change of engineering property of the earth samples with different water content , density and temperature were researched. The influence of concentration of the diffluent salt to the frozen strength was pilot studied. The thermal conductivity of the soil was experimented. With the result and data of the tests, the earth temperature field in Anduo section was demonstrated by numerical analysis, the structure parameter of the spall revetmentd and the rubble berm was given, the stability of the railway roadbed was evaluated.

本文以青藏铁路格尔木-拉萨段那曲河地区安多段(DK1561+975~DK1562+530)冻土路基为对象,对该地区冻土的工程性质进行了室内试验研究;对不同含水率、不同压实度的土样,研究在特定温度变化范围内工程性质的变化:初步分析了易溶盐含量对冻结强度的影响:测试了土样的导热系数;在室内土工试验的基础上,根据测试结果和数据,对安多段区域地温场进行了数值模拟,分析了该工点区间内合理片石护道、碎石护坡结构参数,评价了路基稳定性。

Based on the date,there are more than 90% disasters in Geotechnic Engineering come from the action of underground water.So we shoud pay much attention to the mechanical effects in the research of Geotechnic Engineering.

据统计,超过90%的岩体工程的失事都与地下水的活动有关,故在岩体力学研究中必须充分重视水与岩体的耦合力学效应。

Based on the test of practical measure of laser water-level gauge, the error is less than 0.6mm in the measure range less than 5 meters. Compared with other field water-level measure apparatuses in common use, the precision of laser water-level gauge has obvious improvement. And this gauge can also be applied to physical modeling experiment in river engineering.

4研制开发的激光水位仪经实测检验,在5米测距范围内,测量误差小于0.6mm,比常用的野外水位观测仪器的精度有明显的提高,该仪器亦可用于河工模型试验的水位测量。

Based on a thorough investigation of the engineering geological condition for the reservoir region of the Huizhou Pumped Storage Power Station, the in-situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass.

摘要在对惠州抽水蓄能电站库区工程地质条件进行详细调查的基础上,采用现场试坑注水和钻孔注水、压水试验等方法了解岩土体的透水性。

第9/34页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?