查询词典 water-repellent
- 与 water-repellent 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Jiangnan is the first sign of the train, the window is rolling hills, mist-filled, green river flows slowly, water through mist, fog close to the River, along River Road, lingering fog, mountains are quiet and far-reaching, the water is clean and elegant, only 1 more along the mountain just far seen the mountains of trees, seems to disappear in a sea-green mist, the hill to the far extension of the water to spread , meeting in concert has a unique music, the air seemed to have music with a rhythm, beat, ups and downs, with a 1 wire 1 strand of water vapor, in the gradually dispersed inside ......
初见江南是在火车里,车窗外是连绵的小山,雾气缭绕,绿色的江水缓缓流动,水靠着雾,雾贴着江,江顺着路,大雾不散,山是宁静而深远的,水是清新而淡雅的,山只有1些大意罢了,远远望见山上的树,仿佛是一片绿海消失在雾霭中,山向远处延伸,水向那头漫延,交汇中演奏了一首无与伦比的名曲,空气中仿佛也含着音乐的节奏,跳动,起伏,含着1丝1缕的水汽,在车厢内渐渐地散去
-
Along the water and salt G is less than 325, the minimum water temperature of 15 ° C, up to 30 ° C; enter the Bay, the South B is greater than 340 sea-surface water salinity, water temperature of 20-30 ° C.
沿岸水盐G度小于325,最低水温为15°C,最高为30°C;进入此湾的南B海表层水盐度大于340,水温为20—30°C。
-
The SEADOG doesn't involve any electrical components that can be damaged by sea water, and, because the device pumps water to a reservoir, it can store salt water or desalinated fresh water in the form of potential energy to generate power on demand, even if the current wave regime during a particular period is too low to generate power.
SEADOG pump不会陷入任何电力组成部分的困扰——这些部分通常容易被海水损坏。另外,因为,这套装置是把水泵送至蓄水池,所以在需要甚或特殊时期的海浪过低而不能产生电力时,它可以将盐水或者是淡化海水转化作为势能"储备"起来。
-
The SEADOG doesnt involve any electrical components that can be damaged by sea water, and, because the device pumps water to a reservoir, it can store salt water or desalinated fresh water in the form of potential energy to generate power on demand, even if the current wave regime during a particular period is too low to generate power.
SEADOG pump不会陷入任何电力组成部分的困扰——这些部分通常容易被海水损坏。另外,因为,这套装置是把水泵送至蓄水池,所以在需要甚或特殊时期的海浪过低而不能产生电力时,它可以将盐水或者是淡化海水转化作为势能"储备"起来。
-
Firstly, it introduces the composing and nature of natural water body, discusses the reasons, major types of water pollution, transfer, transformation and self-purification mechanism of various pollutants and features of water resources, water pollution situation in China .
一是介绍了天然水体的组成和性质,讨论了水污染形成的原因、主要类型、水体中各种污染物质迁移、转化与自净的机制及我国的水资源特点、水污染的状况。
-
water right trading ; shadow price of water resources ; temporary water right trading ; long-term water right trading
随着义乌市的经济发展,城市规模的不断扩大,水资源不足成了越来越严重的制约因素。
-
Effect of distilled water,salt water and alkaline water on pH value,water holding capacityand protein extration of silver carp were evaluated.
本试验采用三种漂洗方法,即清水漂洗、盐水漂洗和碱水漂洗,研究不同漂洗条件对鲢鱼pH值、保水性和蛋白质含量的影响。
-
These tests include colour fastness to rubbing/crocking, light, perspiration, water, chlorinated water and seawater; strength tests, namely of tensile strength, tearing strength, seam strength, slippage characteristics, bursting strength etc.; pilling resistance; oil repellence; soil release; air permeability; water vapour permeability; abrasion resistance; water repellence; zipper strength, durability and operability; velcro shearing and peeling; snap fastener security; and the corrosion of metallic finishes, etc.
这些测试包括磨擦、日晒、汗液、水、氯水和海水的色牢度;强度,即拉伸强度、撕裂强度、接缝强度、滑移特性、破裂强度等;抗起球特性;防油性;防污性;透气性;水气通透性;耐磨性;防水性;拉链的强度、耐用性和运作顺畅性;尼龙搭扣剪切力和剥离力;按扣强度;金属饰物的耐腐蚀性等。
-
We are trained as senior engineering technicians with the knowledge in anti-pollution of water, gas, sound, solid waste, pollution control, water supply and drainage works, water pollution control and planning and protection of water resources for cities and towns, who are able to be engaged in the aspects of planning, design, management, education, and research and development for environmental engineering.
本专业通过学习物理化学、工程力学、工程制图、微生物学、水力学、环境监测、固体废弃物处理与处置、大气污染控制等环境工程学科的基本理论、基本知识,培养具备城市和城镇水、气、声、固体废物等污染防治和给排水工程、水污染控制规划和水资源保护等方面的知识,能从事规划、设计、管理、教育和研究开发方面工作的环境工程高级工程技术人才。
-
According to the theory of coupling of solid and fluid, the influence of fault step and dip angle on the stresses and deformations of coal layer and confining rock along with the pressure of pore water are numerically simulated by finite element method during the process of excavation above a confined aquifer. The mechanism of water inrush and the potential point of water inrush are explored. The distance of coal column for preventing water inrush is also analyzed quantitatively.
根据流固耦合理论,采用有限元数值模拟的方法,针对承压水体上采煤过程中断层参数对煤层、围岩的应力、变形和水压力变化的影响进行了模拟分析,探讨了存在断层时突水的机理和可能的突水点位置,并定量分析了防水煤柱的预留距离。
- 相关中文对照歌词
- Down Into Muddy Water
- Bridge Over Troubled Water
- Hell Or High Water
- Hot Water Burn Baby
- Don't Ask For The Water
- Muddy Water
- Walk On Water
- Water
- Turn On The Water
- Bridge Over Troubled Water
- 推荐网络例句
-
She gently rebuff ed him, but agreed that they could be friends
她婉言拒绝了,但同意作为朋友相处。
-
If in the penal farm, you were sure to be criticized.
要是在劳改农场,你等着挨绳子吧!
-
Several theories about reigniting and extinguishing of the arc have been refered.
本文综合考虑了几种电弧重燃和熄灭理论。