查询词典 water-jet
- 与 water-jet 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Through analysis on landscape water pattern, quality character and affinitive degree closing to people, this article does some research on water quality control technology application for river and man-made closed landscape water in Shanghai 2010 Expo site. The research results forms technology integration and provides some technical support to express the theme "better city, better life and beautiful water, beautiful city".
通过分析2010年上海世博会园区景观水体形式、水质特性以及与人体接触的密切程度,研究相应的水质控制技术在世博园区景观河道和人工景观水体中的应用,形成世博园区营造舒适水环境的水质控制技术集成,为体现&城市让生活更美好&的世博会主题提供技术保障。
-
Pereme , separately are 209%,295%,285%; the increasing of accumulating amount separately are 209%,295%,285%; The use of silicon has a tread to rise dry weight of Bermudagrass ,Agrostis Lolium. Pereme ; Under the drought condition , the use of silicon suppressed the reducing of the relative water content of leaf in turfgrass , delaying the time of wither , stress for the 11th day in the drought .compared with water normally and not using silicon ,after use silicon, the RWC of Bermudagrass , Agrostis Lolium. Pereme only separately depressed 14%,16%,32%; Under the drought condition ,the use of silicon can increased the content of proline of Bermudagrass ,Agrostis Lolium. Pereme, stress for the 11th day in the drought and using silicon , compared with water normally and ueing silicon, the content of Pro separately increased 203%,199%,473%;The using of silicon depressing the ET of Bermudagrass and Lolium. Pereme.Under water normally condition, separately depressed 21%,8% at eleven days ;Under drought condition , separately depressed 17%,5%.
施硅增加了草坪草狗牙根、剪股颖和黑麦草的含硅量,分别为209%、295%、285%;积累量分别提高了240%、364%、355%;施硅对草坪草狗牙根、剪股颖和黑麦草的干物质积累有促进趋势;在干旱的条件下,施硅抑制了草坪草的叶相对含水量的降低,延迟了叶片萎焉的时间,在干旱胁华中农业大学2001级时一艳丽硕士学位论文迫第n天,与正CK相比,施硅后狗牙根、剪股颖和黑麦草分别只降低了 14%;16%,32%。;施硅增加了狗牙根、剪股颖、黑麦草在干旱条件下脯氨酸的含量,增强了渗透调节能力,在干旱施硅的条件下,与正51相比,在干旱胁迫第11天,狗牙根、剪股颖和黑麦草脯氨酸的含量分别增加了2叨%、199%、473%;施硅减少了狗牙根和黑麦草的蒸散量在正常浇水的条件下,与正CK相比,第11天狗牙根和黑麦草的蒸散量分别降低了21%、吕%;在干旱的条件下,与干CK相比,在干旱胁迫的第11天,狗牙根和黑麦草的蒸散量分别降低了17%、5%。
-
The Atlantis Drinking Water Purifier uses proven technology to properly filter ALL contaminants AND then treats the water to re-mineralize and alkalinize the drinking water into Healthy Drinking Water.
原生态能量直饮机使用认可的新技术,滤除水中近乎一切的污染物,增加水中人体必须矿物质的含量,调节水的PH值,使其符合健康用水的标准。
-
Separately speeking, for outward rivers in Cansu (either to the Yellow River or to the Yangtze River), the allocable water resources are mainly the river runoff and groundwater, the priority sequence of water resources allocation would be: the water use for maintenance of local plantation including the environment-oriented and irrigated ones, water use for social and economic activities, and the runoff to lower reaches.
外流河流域的降水首先为当地的植被耗用,剩余的才形成可供开发的地表径流和地下水;水资源配置的顺序是:当地植被耗水,当地社会经济用水,最后形成干支流出境的径流供中下游地区使用。
-
Finally, the paper proposes that establishment of hydrological, meteorological, and ecology monitoring site should be carried out as soon as possible in the Altun mountains and the Qiangtang Plateau region, and also recommends that the first choice should be making full use of water resources at the north of Altun Mountains to satisfy industrial water demand of the Lop Nur potash mine in the near future, and conducting the water resources of Altun mountains and the Qiangtang Plateau could be used as a backup water source in the far future.
应采取的措施:(1)尽快在阿尔金山及羌塘高原区域建立水文、气象、生态等监测站点;(2)通过加大阿尔金山北麓水资源的开发力度来解决罗布泊钾盐矿近期工业用水需求,将阿尔金山及羌塘高原的水资源作为远期备用水源。
-
Third, introducing the evaluation theory of ecosystem service, it set up an appraisable system of ecosystem service values of water resources, which is specially carried on to Haihe Basin too. Fourth, it coupled the evaluation theory of ecological service function and the holistic analysis model of water resources carrying capacity for a try, and then set up the analysis mechanism of regional macro-economy, water resources and ecological environment, which carried on a preliminary research of carrying capacity of ecological environment of water resources in Haihe Basin.
第二,建立了水资源承载能力分析模型,针对海河流域进行专门的分析,提出流域合理的经济社会发展规划参考目标,第三,引入生态系统服务功能价值理论,建立了水资源生态系统服务功能价值评价体系,并在海河流域内进行实践应用,第四,将生态服务功能价值理念与水资源承载能力分析模型进行尝试性的耦合,初步提出基于区域宏观经济、水资源及生态环境分析机制的流域的水资源生态环境承载能力分析框架。
-
In this research, the total aquacultural water use is predicted to be 367,457,000 m^3, in which 36,696,000 m^3 is ground water; 178,647,000 m^3 is surface fresh water and 188,810,000 m^3 is sea water.
本研究推估嘉义县区域养殖用水,其总用水量为367,457,000 m^3,其中海水用水量为188,810,000 m^3、淡水总用水量为178,647,000 m^3、地下水用水量为36,696,000 m^(3)。
-
They are all fresh water, however, new snow is extreme soft water, neutro-acidic, old snow is extreme soft awater, neutro-alkaline, and river water is alkaline soft water.
虽然它们都属淡水范畴,但新雪是中性偏酸的极软水,老雪是偏碱的极软水,河水则属碱性软水。
-
Based on the unique characteristics of the Yellow River and previous research on its ecological water requirement, the present paper recommends that the water requirement for transport in the flood season and base ecological flow in non-flood season should be both included in the ecological water requirement. The water requirement for transport is 80 × 108-120 × 108 m3 per year if the bankfull discharge carries the largest sediment and contaminant load over a long period of time. The base ecological flows in non-flood season at Huayuankou and Lijin stations are 80 × 108-100×108 m3 and 50 × 108-60 × 108 m3, respectively.
通过分析黄河下游1958~2000年实测生态可用水,探讨生态需水量内涵,根据黄河特殊性及黄河生态需水量的研究现状,将维持和保护河流功能的黄河下游生态需水量分为汛期输运水量和非汛期生态基流量,在平滩流量输运能力最强的前提下,估算黄河下游汛期输运水量为80~120亿m3,根据实测资料估算作为黄河下游水量控制断面花园口水文站和作为河口地区水量控制断面利津水文站的非汛期生态基分别为80~100亿m3和50~60亿m3。
-
In the selection of the program made full use of the original base of the water, excavating the stream, waterfall or arranged to create a style unique natural water features, cleverly water park landscape will be extended to the sea, the vastness of the sea will penetrate into the park landscape, Park and will be classified as "Lingbo Rainbow","Water Italy Rong","Bihai grievances","Lin Feng-tao" four scenic areas, ready to develop into the city after万绿园Following the second large public green space.
在遴选程序充分利用了原有的基础上的水,开挖流,瀑布或安排建立一个风格独特的自然水景,巧妙地用水将公园景观延伸到大海,辽阔的大海将渗透到公园景观,公园,将被归类为&凌波彩虹&,&水意大利荣&,&碧海冤情&,&林风涛&四个景区,准备发展成为该市继后万绿园第二个大型公共绿地。
- 相关中文对照歌词
- Down Into Muddy Water
- Bridge Over Troubled Water
- Hell Or High Water
- Hot Water Burn Baby
- Don't Ask For The Water
- Muddy Water
- Walk On Water
- Water
- Turn On The Water
- Bridge Over Troubled Water
- 推荐网络例句
-
And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.
同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。
-
Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.
运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。
-
If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.
如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。