查询词典 water-heater
- 与 water-heater 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Cooking water or fruit juice: The fresh vegetables or fruits chopped Wash, a bowl of water in a bowl of vegetables the proportion of open water first, and then cut vegetables or fruits Add to pot, stamping cook 5 minutes, coolish will filter out water can be consumed.
菜水或果汁:将新鲜蔬菜或水果洗净切碎,以一碗菜一碗水的比例,先将水煮开,再将切好的菜或水果放入锅内,加盖煮5分钟,稍冷后,将水滤出即可食用。
-
By using Lee\'s matching law, the excess pore-air pressure, excess pore-water pressure and settlement in the Laplace-transformed domain are obtained for one-dimensional consolidation in unsaturated soils, under the large-area uniform instantaneous loading. A computer program using the method by Crump and Durbin is developed to obtain the semi-analytical solution of the excess pore-air pressure, excess pore-water pressure and settlement under the boundary conditions of the top surface permeable to water and air and the bottom impermeable to water and air.
8采用李氏比拟法,应用Merchant粘弹性模型,得到了Laplace变换域内粘弹性非饱和土地基一维固结时超孔隙水压力,超孔隙气压力以及土层沉降的解;采用Crump及Durbin方法实现Laplace逆变换,获得大面积均布瞬时加荷,在顶面排气排水,底面不排气不排水情况下粘弹性非饱和土地基一维固结时的半解析解。
-
By introducing cybernetics into water resource research, critical cybernation and mathematic representation are presented, at the premise of improving agricultural utilization water efficiency, effective method of agricultural utilization water control is used, which provide scientific ground for rational distribution of Yellow River water.
5将控制论引入到水资源研究中,创造性的提出了临界控制及其数学表达,提出以提高农业用水效率为前提的农业用水控制的有效途径,为黄河水量合理分配提供了科学依据。
-
In the development of massive oil pool of normal cyclothem with sufficient reservoir energy and active edge and bottom water drive, the primary means of controlling the appearance of secondary bottom water and the intervention of water coning is to perforate only the upper part of the reservoir at limited interval so as to prolong the period of production and increase the amount of output without water cut.
本文介绍了大港油田港东六断块和羊二庄油田的块状砂岩油藏注水开发后,很快地由原始半底水变成全底水的情况,从而使水锥带来的油井减产进一步扩大。
-
In recent years, some new water glass sand processes have been developed according to the rule of water glass theory. We have developed the coating transferring precision casting process to be used in mold making. A new reinforce 2000 multiplex denature water glass has been invented. The specific binding strength is improved 1~1. 5 times and the addition amount of new water glass can be reduced to 2. 8~3. 0% for CO〓 sand process.
近年来,在水玻璃砂基础理论的指导下,相继开发出了一系列新型水玻璃砂工艺,例如将涂层转移法精密铸造技术应用于模具的制造,开发了强力2000型多重变性水玻璃粘结剂等,使水玻璃的比粘结强度提高了1~1.5倍,CO〓硬化的水玻璃加入量降低到2.8~3.0%,在生产实践中得到了应用。
-
In the Mu Us desert, either vertical distributions of soil moisture isogram before irrigation or vertical distributions of soil moisture isogram after irrigation shows obviously vertical-layered character. When the irrigation is finished 24 hours later, there is little correlation between vertical distributions of soil moisture isogram before irrigation and vertical distributions of soil moisture isogram after irrigation. All of probability distribution of soil water content before irrigation are left-skewed distribution, but some of probability distribution of soil water content after irrigation is left-skewed distribution, some is right-skewed distribution or normal distribution. The distributed pattern shows different between the probability distribution of water depth of rain gauge and that of soil moisture in horizontal section of different depth. There is close correlation between the distribution of water depth of rain gauge and that of soil moisture in horizontal section, but the correlation debases as the horizontal section turns deeper. Also after irrigation close correlation occurs between the distribution of soil moisture of layers bordering upon each other, but which reduces with space of different layers being larger.
在毛乌素沙地,喷灌前后土壤含水率等值线垂直分布均具有显著的垂直分层特征;在喷灌结束24h后,喷灌前土壤含水率的垂直分布与喷灌后土壤含水率的垂直分布间地相关性较弱;灌水前土壤初始含水率的概率分布形态均表现为较典型的左偏态分布,灌后土壤含水率分布形态表现为左偏态、右偏形态或正态分布;雨量筒水深概率分布与土壤不同深度剖面层水平方向的含水率概率分布在形态特征上表现出一定程度的差异,雨量筒水深分布与水平层土壤含水率分布、灌后相邻深度层土壤含水率分布、之间的相关程度较高,其相关性随着剖面深度和层间距的增加而降低。
-
The results show that after the water transfer project,water level and the capacity of the middle and lower reaches of Hanjiang River will be enhanced,the concentration of the water pollutant will be reduced,the "water bloom" phenomenon will be controlled,fish''s survival space will be improved,but the potential risk of schistosomiasis diffuseness may be increased.
研究结果表明:引江济汉工程在一定程度上提高了汉江中下游的水位和流量,降低了汉江中下游水体的污染物浓度,能够在一定程度上控制"水华"现象,改善鱼类的生存空间,但同时也存在造成血吸虫病传播的潜在风险。
-
At length I spy'd a little Cove on the right Shore of the Creek, to which with great Pain and Difficulty I guided my Raft, and at last got so near, as that, reaching Ground with my Oar, I could thrust her directly in, but here I had like to have dipt all my Cargo in the Sea again; for that Shore lying pretty steep, that is to say sloping, there was no Place to land, but where one End of my Float, if it run on Shore, would lie so high, and the other sink lower as before, that it would endanger my Cargo again: All that I could do, was to wait 'till the Tide was at highest, keeping the Raft with my Oar like an Anchor to hold the Side of it fast to the Shore, near a flat Piece of Ground, which I expected the Water would flow over; and so it did: As soon as I found Water enough, for my Raft drew about a Foot of Water, I thrust her on upon that flat Piece of Ground, and there fasten'd or mor'd her by sticking my two broken Oars into the Ground; one on one Side near one End, and one on the other Side near the other End; and thus I lay 'till the Water ebb'd away, and left my Raft and all my Cargo safe on Shore.
最后,我终于在小河的右岸发现一个小湾。我费尽艰辛,好不容易把木排驶到最浅的地方。我用桨抵住河底,尽力把木排撑进去。可是,在这里,我几乎又一次险些把货物全都倒翻在水里。这一带河岸又陡又直,找不到可以登岸的地方。如果木排一头搁浅在岸上,另一头必定会像前次那样向下倾斜,结果货物又有滑向水里的危险。这时,我只好用桨作锚,把木排一边固定在一片靠近河岸的平坦的沙滩上,以等待潮水涨高,漫过沙滩再说。后来,潮水果然继续上涨,漫上沙滩,等水涨得够高了,我就把木排撑过去,因为木排吃水有一尺多深。到了那儿,我用两支断桨插入沙滩里,前后各一支,把木排停泊好,单等潮水退去,就可把木排和货物品平安安地留在岸上了。
-
It's water resources states are waterlogging, water shortage,water dirtiness and water pollution and ecological environment unbalance.
从总体上来说,区域水资源可持续利用指标体系的研究尚处于探索阶段,缺乏系统的、公认的评价指标体系。
-
But the water pollution in Suzhou is very disproportional with its image both home and abroad. It is very necessary and urgent to protect the water resources, to treat the water pollution and to improve the water environment.
但是,苏州的水环境问题与苏州在国内外的形象极不相称,保护水资源、治理水污染、改善水环境十分必要而紧迫。
- 相关中文对照歌词
- Down Into Muddy Water
- Bridge Over Troubled Water
- Hell Or High Water
- Hot Water Burn Baby
- Don't Ask For The Water
- Muddy Water
- Walk On Water
- Water
- Turn On The Water
- Bridge Over Troubled Water
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。