查询词典 water way
- 与 water way 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
There are two possibilities, one lit and you can try to give your baby to drink water, sleep in the baby to the baby with aureomycin eye ointment, and the other is congenital lacrimal plug, if there is no way way去火eliminate the眼屎If your baby needs to go to the hospital with Qualcomm lacrimal gland.
有两种可能,一是上火,你可以试着多给孩子喝水,在孩子睡觉时给孩子用金霉素眼药膏,二是先天性泪腺堵塞,如果用去火的方法没有办法祛除眼屎的话就需要带孩子去医院通泪腺。
-
The polysaccharose of mycelium of Grifola umbellate (PPS1) and the polysaccha rose of sclerotium of Grifola umbellate (PPS2) both were extracted by hot water leaching way, which were purified dispoing by Sevage way, determined the polysac charose content by 3,5-dinitro-salicylate way, and comparablly analysed infrared spectrum by Fourier transforming infrared spectrophotometer,which suggest that two kinds of polysaccharose were the similar infrared spectrum.
本试验通过人工液体浅层培养方式成功培养出猪苓菌丝体;经热水浸提法分别提取猪苓菌丝体多糖(PPS1)和猪苓菌核多糖(PPS2);用Sevage法进行纯化处理;用3,5-二硝基水杨酸法测定其糖含量;用傅里叶变换红外分光光度计对两种多糖进行红外光谱比对分析,结果表明两者红外光谱相似。
-
According to my deduction, 3 gorge dam may result in earthquake in this way, 39.3 billons tons water is exerted to the Asia block piece, just like a tank of water is swinging on the tail of branch of tree, If the water in the tank is changing just like a boy is swing in the tail of tree, result is the broken branch.
根据我的推测:三峡大坝有可能是这样造成地震灾难的,393亿吨水加到脆弱的亚非板块上,就象是在大树枝的末梢加上了一桶水,如果这桶水在不断增减,相当于有人在末梢晃动,大树枝自然会断裂。
-
Due to the fact that the valve seat hole of free-ball float trap is always below the level of condensed water, ultimately formed water seal that separated water and steam in a natural way, therefore, there should be in no circumstance of leakage of steam during operation of the equipment.
由于自由浮球式疏水阀的阀座孔总处于凝结水液位以下,形成水封,水汽自然分离,工作时达到无蒸汽泄漏。
-
It has attracted many famous domestic enterprises such as Wahaha, Nongfu Spring, Master Kang, Wutai Group to build factories in Baishan. What's more, it has developed its own famous brand –"Quanyangquan" mineral water, has had annual production capacity of one million tons of mineral water. It is stepping in a well-coordinated way which can guarantee both protection and exploitation of mineral water resource, and become the best area in developing and protecting the mineral spring industry in China.
先后吸纳了&娃哈哈&、&农夫山泉&、&康师傅&、吴太集团等国内外知名企业来白山投资建厂,并且培育出了自己的知名品牌——&泉阳泉&矿泉水,形成了年产百万吨的生产能力,走上了矿泉水资源保护与开发相协调的良性发展道路,成为全国矿泉水产业开发与保护最好的地区。
-
For each strategy, a corresponding exploitation plan of groundwater was designed. Then each designed exploitation plan (except scheme 3) was put into the model for calculation and simulation. The analysis on the forecasting results every plan indicates that:(1) Shuting down the self-provided wells is the most direct and effective method, playing an important role in the land subsidence prevention.(2) The resumption of compressed soil by groundwater artificial recharge is limited. So the artificial recharge can\'t provide essential effect for the resumption of land subsidence, unless the artificial recharge is much more than the groundwater withdrawal.(3) The method of "adjusting the exploitation stratum of groundwater to the shallow" has an obvious effect on the land subsidence prevention.(4)"Sand wells" can increase the leakage recharge for confined aquifer, and thus can slow and prevent the development of the land subsidence.(5) For the groundwater exploitation in Xi\'an, emergency self-provided wells should be managed according to the well spacing of 1600m, 2000m and 1600m, respectively, in the river terrace area, alluvial-proluvial fan area and loess tableland area to exploit the first confined groundwater. Corresponding individual well yield can be set as 2500m~3/d, 1500 m~3/d and 200 m~3/d. Make emergency self-provided wells pump in the dry year and stop pumping groundwater to restore and conserve underground water sources in average years and wet years. In this way, groundwater withdrawal of 162000m~3/d can be obtained to provide for the supplement of water supply in Xi\'an. As a result, the water supply stress can be released in dry years. The groundwater depression formed in the exploiting year can resume in 3-4 years. At the same time, this exploitation manner will not lead to obvious land subsidence.
本文利用所建的模型预测了现状开采条件下未来20年的地下水位和地面沉降的变化,在此基础上,提出了防治西安市地面沉降的五个地下水开采方案,利用所建的地面沉降模型对各个设计方案其进行了模拟和预报,对预测结果的分析表明:①封停自备井是防治地面沉降最为直接和最有效的对策,对防治地面沉降起着最为积极的作用;②采用人工回灌方法使被压缩的土层得到的恢复是非常有限的,对地面沉降不能起到根治作用,只有回灌量明显大于开采量时才能有一定的效果;③&调整开采层次,在浅层取水&对防治地面沉降的效果十分明显;④布设&砂井&可以增加对承压含水层的越流补给量,从而可以有效地缓解和控制地面沉降的发生和发展;⑤对西安市的地下水开采,可在河流阶地区、冲洪积扇区和黄土塬区分别采用1600m、2000m、1600m的井间距布置应急自备井,分别采用2500m~3/d、1500 m~3/d和200 m~3/d的单井开采量,开采第一承压水,在平水年或者丰水年不开采,涵养地下水源,在枯水年启动这些应急自备井开采,在输出分析范围内共可获得162000 m~3/d(5913万m~3/a)开采量,可以有效地补充西安市的供水水源,缓解供水紧张局面,开采年开采导致的下降的水位可在停采3~4年后得到基本恢复,同时,这种开采方式不会造成大的地面沉降量。
-
The MC nylon lath water-seal and wedge supporting slide block are adopted in the working anchor gate of the water transmission way of the Spring Lake s navigation lock, which has solved the problems of frequent operation of the anchor gate and the water-seal under condition of bearing bilateral pressure.
春天湖船闸输水廊道工作闸门采用了MC尼龙板条封水和楔形支承滑块,解决了闸门运行频繁、承受双向水压力情况下封水的问题。
-
According to the project practice of pumps in Yu-zhong Steelworks, this paper put forward some water hammer preventive measures of long distance pipe pump station of water supplying, such as the multifunction controlling valve of the water pump, one-way surge tank and vent valve, etc.
根据水锤计算的特徵线法,建立了泵出口附近设单向调压塔水锤计算的数学模型,结合榆中钢厂供水泵站的工程实际,提出了长管道供水泵站采用多功能水泵控制阀、单向调压塔、进排气补气阀对事故停泵水锤的防护措施。
-
Trail has been in the car division between the large half-day I walk in the six-bridge for a short complement and finishing, are somewhat ill-prepared, in the four bridge after almost no chance to get on the way to the mountain spring water, In the following trip can only be used to save the only two bottles of mineral water, and good in more than 4,000 meters above sea level the temperature is very low, low water consumption.
已在车师古道间行走了大半日的我,在六道桥进行了短暂的补充和修整,感到有些准备不足的是,在四道桥过后,一路之上几乎没有机会取到山间的泉水,只能在以下的行程中节省地使用仅有的两瓶矿泉水,好在4000多米的海拔气温很低,水分消耗不多。
-
The system uses PID controller and fuzzy controller to design automatic control loops, a study of fuzzy three-element feed-water control system for a CFB municipal waste incinerator is introduced. The incinerator is faced with problems such as large-scale fluctuation of furnace heat load and low regulation resolution of main control feed-water valve. The fuzzy logic control system is applied to modulate PI control parameters according to steam drum water level to fit fluctuated heat load, the inner and outer control loops are realized in an asynchronous way to effectively decrease regulation time and improve regulation precision.
针对垃圾炉炉膛负荷波动较大,同时给水调节阀门执行机构的调节精度较低的现状,在传统三冲量串级汽包水位控制方式的基础上,采用模糊控制策略对内、外串级回路的PI控制参数进行分区域调整,强调了PI参数在被控参量处于不同范围时的分离作用,同时内、外控制回路采用异步控制方式,浙江大学硕士学位论文从而有效地减小了被控参量的调节时间,提高调节精度,使水位波动控制在△为士12~范围内。
- 相关中文对照歌词
- Water Will Find A Way
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。