英语人>网络例句>water system 相关的网络例句
water system相关的网络例句

查询词典 water system

与 water system 相关的网络例句 [注:此内容来源于网络,仅供参考]

As the electric furnace water heating system of the complexity of their own, so the use of the system on its real-time simulation of dynamic performance and control law, and so have important practical significance.

由于电炉烧水系统的本身的复杂性,所以利用该系统进行的实时仿真对研究其动态性能和控制规律等均有重要的现实意义。

Jiangsu ligang Electric Power Co.Ltd,,Wuxi 21444 ChinaAbstract: introduce the reformation of chemistry water treatment control system in Jiangsu Ligang Fired Power Station Phase one.2×350MW .The new system characterize in both PLC and epigyny control mode .

摘 要:介绍江苏利港电力有限公司一期2×350MW燃煤机组化学水理控制系统更新改造,原有系统采用模拟盘显示状态、控制按钮操作,显示表显示实时参数,记录仪记录过程参数,再生部分以程序控制的控制方式。

They have close relationship as the former may provide new ideas and approaches for the later, while the later may be the simulation for the former and gives it helps in degradation products identification and mechanism explanation. It is necessary to choose a suitable system, which has high potential of treating EDs and close relationship to the natural environment, to combine the researches in the two aspects. Our group has been engaged in researches on the photochemical properties and application to water pollution control of different ferric species including Fe -OH complexes, Fe -polycarboxylate complexes, Ferric oxides and Fe -humic acid complexes. Fe -oxalate complexes system has higher efficiency than the other ferric species systems in photooxidation and degradation of organic compounds. This thesis is focused on the photodegradation of nine EDs estradiol (E2), estrone (E1), 17α-ethynyl estradiol (EE2), diethylstilbestrol , bisphenol-A , 4-Nonylphenol , 4-Octylphenol , di-n-butyl phthalate , and di (2-ethylhexyl) phthalate .

因此从处理效率和环境化学意义两方面考虑,结合本课题组在不同铁形态(包括Fe-OH配合物、Fe-多羧酸配合物、Fe氧化物、Fe-腐殖酸配合物等)的光化学特性及其在水污染控制中的应用方面较系统的研究工作基础,本论文选择了四类共9种典型的内分泌干扰物(雌二醇(E2)、雌酮(E1)、17α-乙炔基雌二醇(EE2)己雌酚、双酚A、壬基酚、辛基酚、酞酸二丁酯和酞酸二乙基己基酯),研究了它们在Fe-草酸盐配合物体系中的光降解效果,推测其降解机理,探索环境内分泌干扰物光氧化处理的新体系,同时为预测其在环境中的光降解行为提供了依据。

In order to find out completely the soil-wheat contaiminated by heavy metals in Tianjin sewage farm, we collect samples on the dry land and examinate contents of heavy metals in soil-wheat system. Firstly, the anthor evaluates that soil irrigated by sewage that has been contaminated slightly, the main polluting factors are Cd and Zn, and then the anthor evaluates soil according to different regions, soil types and irrigating water. Secondly, the anthor analyzes content and enrichment ability of heavy metals in different part of wheat, evaluates wheat is contaiminated by Cd widespreadly, only few samples polluted by Zn.Finally the anthor put up correlative analysis about heavy metal contents in the soil-wheat system, as well as plant enrichment coefficient and some physico-chemical properties of soil, and establishes a prognostic model about heavy metal content among wheat spike, soil, soil types, PH, organic matter and salinity with the quantifying theory.The prognostic accuracy of primarily contaminative factors is the best with compound correlative coefficient examining, the model can be founded.With improvement of living level, people need cleaner food.

为全面了解天津市污灌区农产品生产地土壤和旱地作物小麦的重金属污染状况,我们于2004~2005年对全市污灌区的土壤和小麦进行了采样,在对该区土壤—小麦系统中六种重金属元素(Cd、Cu、Pb、Zn、Cr和Ni)的含量进行检测的基础上,本文首先分析评价了污灌区农田土壤的环境质量总体已达到了轻度污染水平,主要的污染因子是Cd和Zn,同时对污灌区农田土壤分区县、土壤类型和不同灌水类型进行了评价;然后分析了重金属在小麦不同部位的含量与富集能力,评价了污灌区旱地作物小麦普遍遭受了Cd的污染,只有个别样点遭受了Zn的污染;最后对土壤—小麦系统重金属含量间以及植物富集系数与土壤部分理化性质间进行了相关分析,由于土壤类型是定性变量,本论文以数量化理论建立了小麦穗实中重金属含量与土壤中重金属全量、土壤类型、PH值、有机质和全盐量间的预测模型,经复相关系数检验,污灌区主要的污染因子Cd和Zn的预测精度最高,模型可以成立。

It's main products contain station computer monitoring system, water turbing governors used stepmotor, temperature controlling system, excitor and speedmeter.

主要产品有厂站计算机房监控系统、同步发电机励磁设备、水轮机步进式调速器、温控系统及励磁调节器等。

The thesis expatiate on the thought base,principle,design process and calculate technique that used in the foundation of the service pipe network geography information manage system,and set up each module's math model.It handles the network's graphics and words in a whole using the geography information system technique.That will make the water pipe network management easy, facilely and exactly.

本文详细阐述了建立城市给水管网地理信息管理系统的思想基础、遵循原则、设计过程以及采用的计算技术,对管网各功能模块建立了数学模型,运用地理信息技术对城市给水管网进行了图形和属性数据一体化的操作,从而使给水管网的管理更加直观、便利和准确。

Examples and corresponding analysis of results are given at processes of both arithmetic design and system conformity. The simulation system can do decision-making of ballast water for each step of floating dock work procedure and simulate the process with a visible front panel.

本文在算法设计阶段和系统整合阶段都给出了相应的算例和结果分析,得出结论如下:开发的仿真系统能够根据浮船坞的浮态要求实时仿真船体分段上、下坞以及坞体的浮、沉过程中各压载水舱水量的实时调节情况。

PROTOS 90E filter cigarette maker used fluidized bed principle on the feeder,water-cooled garniture with optimized shape to improve rod forming action, SRM rod weight control system with micowave system, optical densed-end and missing filter check modular.

PROTOS 90E卷接机组采用流化床供丝系统,配最优化成型水冷烟枪、微波重量控制系统、光学松头缺嘴检测系统。

It can be used for boiler / cooling tower water loop system and ground source system .

可用于锅炉/冷却塔水环系统、地源系统。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

第90/100页 首页 < ... 86 87 88 89 90 91 92 93 94 ... > 尾页
推荐网络例句

I am accused of being overreligious," she said in her quiet, frank manner,"but that does not prevent me thinking the children very cruel who obstinately commit such suicide.""

客人们在卡罗利娜·埃凯家里,举止就文雅一些,因为卡罗利娜的母亲治家很严厉。

Designed by French fashion house Herm è s, this elegant uniform was manufactured in our home, Hong Kong, and was the first without a hat.

由著名品牌 Herm è s 设计,这件高贵的制服是香港本土制造,是我们第一套不配帽子的制服。

Do not 'inflate' your achievements and/or qualifications or skills .

不要 '夸大' 你的业绩或成果,条件或者技能。