查询词典 water pressure
- 与 water pressure 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The Veliger larvae of Crassostrea gigas swan regularly in the water column under the ambient pressure, either in a vertically orientated lineal or spiral pathway.
在正常大气压下,太平洋牡蛎面盘幼虫的游泳较为舒缓,压力提高时,表现为快速的直线运动或螺径小而螺距大的螺旋运动,并出现更频繁的下沉行为,表明幼虫的紧张度已提高。
-
Flow measurement of oil-water two-phase flow was carried out with a Venturi meter using differential pressure method.
利用文丘里管基于差压法来测量油水两相流的流量。
-
The results show that the turbulence intensity, fouling cleaning intensity and pressure drop increase with the increase of flow velocity, particle size and the volume fraction. The effect of liquid-solid fluidzed-bed cleaning fouling depends on the reasonable combination of flow velocity, particle size and the volume fraction. Through an integral consideration of water saving and energy saving and uniformity of fouling cleaning, the optimum flow velocity of flow, particle size and volume fraction are 2.0 m/s~2.5 m/s, 3 mm~4 mm and of 5%~8 vol%, respectively.
结果表明:流体的湍流强度、壁面污垢清洗强度和压力降均随流速、颗粒粒径和体积分数的增加而增加;液固流态化清洗防垢除垢效果取决于流速、液固颗粒粒径和体积分数的合理组合;综合考虑节水节能及污垢清洗的均匀性,高炉冷却壁的最佳流速为2.0~2.5 m/s,固相颗粒粒径为3~4 mm,体积分数为5%~8%。
-
Current various product lines are as follows: 3 static press Molding Line, 5 Air Impact lines, 6 Resin Sand lines, 2 Lipid Vulcanize Water Glass Sand lines, 10 Jolt-Squeeze Mechanical Molding lines, 3 Shell Molding lines with Resin Sand, 4 Sand Coated Iron Mould lines used for Ferrous Moulding, 11 investment casting lines, 5 Precision Casting of Lost Form lines, 27 Die Casting lines, 22 Gravity Casting of non-ferrous Metal lines and 16 Low Pressure Die Casting lines.
现有各种生产线构成如下:静压造型线3条,气冲生产线5条,树脂砂生产线6条,脂硬化水玻璃砂生产线2条,震压式机械造型生产线10条,壳型铸造生产线3条,黑色金属铁模覆砂生产线4条,熔模精密铸造生产线11条,消失模生产线5条,压铸生产线27条,有色金属重力铸造生产线22条,低压铸造生产线16条。
-
Static press Molding Line, 5 Air Impact lines, 6 Resin Sand lines, 2 Lipid Vulcanize Water Glass Sand lines, 10 Jolt-Squeeze Mechanical Molding lines, 3 Shell Molding lines with Resin Sand, 4 Sand Coated Iron Mould lines used for Ferrous Moulding, 11 investment casting lines, 5 Precision Casting of Lost Form lines, 27 Die Casting lines, 22 Gravity Casting of non-ferrous Metal lines and 16 Low Pressure Die Casting lines.
现有各种生产线构成如下:静压造型线3条,气冲生产线5条,树脂砂生产线6条,脂硬化水玻璃砂生产线2条,震压式机械造型生产线10条,壳型铸造生产线3条,黑色金属铁模覆砂生产线4条,熔模精密铸造生产线11条,消失模生产线5条,压铸生产线27条,有色金属重力铸造生产线22条,低压铸造生产线16条。
-
Business Scope 1, battery machinery: sealing machine, high speed sealing machine, injection machine, zinc cream machine, spray mixer, divide the paper machine, powder boxes, and examination of motor, electric wash drawing, dry electric pull, tableting machines, granulation machines, automatic combination machine, roll machine, stamp-pad ink machine, glue water machine, pressure machine, pulling machine, the machine and so on, battery accessories to the workshop, the battery of Health workshop planning and construction, automated battery production line design and manufacturing.
电池机械:封口机、高速封口机、注液机、锌膏机、喷液搅拌机、隔膜纸机、粉箱、验电机、洗电拉、干电拉、压片机、造粒机、自动组合机、卷片机、印油机、涂胶水机、测压机、拉浆机、开片机等,电池配件车间、电池生车间的规划与建设,自动化电池生产线设计及制造。
-
The basic configuration and work principle of hydraulic pressure system are introduced,which is for skateboard configuration of steel water bag.
介绍了钢包滑动水口液压系统的基本构成和工作原理,讨论了主要参数的设计原则与具体确定,并对该系统的特点进行了总结。
-
Thermal power plants in high-pressure boiler water level gauge package on the use of gas is also ideal.
在火电厂高压锅炉气包水位计上使用也很理想。
-
Hose Connection Gauge for Testing Water Supply Pressure in a Building.
软管连接仪表,用于测试建筑内的水供应压力,配置高压压力计指针
-
The company currently a high-pressure water gun to produce.
本公司目前出要生产高压水枪。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。