英语人>网络例句>water power 相关的网络例句
water power相关的网络例句

查询词典 water power

与 water power 相关的网络例句 [注:此内容来源于网络,仅供参考]

Examples are industrial discharge such as brine, living sewage disposal, cooling water of power plant which is discharged to the river, dust or waste hot gas which is let to the atmosphere from chimney and cooling tower, and bilge water which is released to the port water area.

当废水或废气排放到环境流体中时,废流体的密度往往与环境流体的密度不同,这种由于密度差而产生的浮力不仅影响平均流本身,而且更主要的影响湍流及受湍流影响的动量、热量和质量的交换。

These are widely used in: micro-wave oven transformer, three-phase electric power, low-voltage control transformer, machine tool control transformer, neon light transformer, rectifier in lamps, electric soldering machine, washer double thermoelectricity machine, rectifier, wide screen color degaussing turn, kitchen electric machine, magnetic mine choosing facility, auto spare part, motor car spare parts, electric motor car, and wire and cable, fan jar, inverted power source, UPS power source, water pump electric machine, air-compress electric machine, disk wire, and so on.

公司的主营业务为漆包圆铝线,漆包圆铜线,铜包铝线和裸铝丝的制造和销售,主导产品为220级聚脂复合聚酰亚胺漆包圆铝线、铜包铝线和裸铝线等,广泛应用于:微波炉变压器、三相电力变压器、低压控制变压器、洗衣机双热电机、整流器、大屏幕彩电消磁线圈、厨房电机、磁矿选设备、汽车备件及电线电缆等。

Water treatment system of the power Plant adopts traditional electro deionization exchange of water processing craft, that craft exists high operating costs in the production and instability in the decimalized water, water loss, high energy consumption, complicated to operate, the personnel labor strength greatly etc.

热电厂化学水处理系统采用传统的电渗析+阴、阳离子交换的水处理工艺,该工艺在生产运行中存在着运行费用高、出水水质不稳定、水损失量大、能耗高、操作复杂、人员劳动强度大等缺点,不但水资源浪费较为严重,而且排放的酸、碱废水对环境造成了新的污染。

The Yangtse River learns unity and coherence in writing academy more than 40 names students enthusiastically in the afternoon on October 24, autumn loafs about on precious Ta He county of neighbouring the Yangtse River Guanyin rock projecting over the water Sha Shi Duan sandy beach cooking a meal in the open. Shi more than 10 college student present is carried out immediately saved , one important more than ten students saw that the power is composed of the person ladder offal at that time rescuing people , still had a sum daughter schoolmate who can not swim for among them , thought that second children save quickly when going on shore in 14:15 or so , the incautious drop-in of 2 vicinity children river,the ladder has fallen apart , nine college students have fallen into water since the lack of physical strength prepares the subterranean flow , person, rescue hubbub slice immediately , happen to make contact with winter swimming sixty several old people the coming year rescue up six college students group, Two fall into water teenager has been rescued, but three heroes indistinct but ice-cold river water of submergence is already middle.

10月24日下午,长江大学文理学院40多名学生,在长江观音矶附近的沙市宝塔河段沙滩上秋游野炊。14时15分左右,附近2名儿童不慎落入江中,在场的10余名大学生立即开展施救,当时十几名大一学生见势组成人梯下水救人,其中还有不会游泳的和女同学,当第二个小孩快救上岸时,由于体力不支和暗流,人梯散了,九名大学生落水,顿时救喊声一片,正好碰上冬泳队几名六十来岁的老人救起六名大学生,两位落水少年获救了,而三位英雄已经沉入苍茫而冰冷的江水中。

C. Fire-control room must ensure that quantity of water in fire-control water storage facilities such as high fire gun, fire-water pond, gas pressure water tank and so on is enough; ensure that outlet pipe valve of fire pump and valves on the pipes of automatic sprinkle system are open, ensure that switches of fire power equipments such as fire service pump, smoke blower, fire-resisting shutter are in automatic status.

c。 消防控制室应确保高位消防水枪、消防水池、气压水罐等消防储水设施水量充足;确保消防泵出水管阀门、自动喷水灭火系统管道上的阀门常开;确保消防水泵、防排烟风机、防火卷帘等消防用电设备的配备框开关处于自动位置。

The main products are: all kinds of out of style, power distribution cabinets, as well as fixed capacitance cabinet; central air-conditioning automatic control system; a variety of lighting boxes, wall-mounted box, outdoor waterproof box, meter boxes, power boxes; a variety of fire control box , joint boxes, console; a variety of dual-power switch box, since the lotus root decompression starter boxes, variable frequency constant pressure water supply system.

主要生产的产品有:各种抽出式、固定式配电柜以及电容柜;中央空调自动控制系统;各种照明箱、挂墙箱、室外防水箱、电表箱、动力箱;各种消防控制箱、联动箱、控制台;各种双电源切换箱、自藕减压起动箱、变频恒压供水系统。

Power has an adequate built-in area of 330 kilovolts, five 220-kilovolt substations, Longyangxia, salt pot Gorge Power Station are the largest network in our region to the northwest, north around the Yaojie Coal Mining Bureau of the Treasury thermal power generation Plants, Xiangtang, such as hydropower station is being developed, basically forming a water and coal-fired electricity industry chain.

电力充足辖区内建有一座330千伏、五座220千伏变电站、龙羊峡、盐锅峡电站的大网皆经我区输往西北、华北各地,窑街矿务局务质煤火力发电厂,享堂水电站等正在筹建,基本形成了水、煤电产业链。

The company product has more than 100 serieses totally, more than 18000 species specification, all products have already pass national compulsory CCC attestation, parts of products pass CE attestation in Europe, the German GS attestation...etc., The product from the Chinese people insurance company product the quantity responsibility the stand as guarantor, the electric leakage chopper series ,department of national power company recommends the product, the electric power form the department as the national economic trade, the water conservancy electric power department, the company combine to be list as the oil- field of Ta- ching provides the member unit.

公司产品共有100多个系列,18000多个品种规格,全部产品已通过国家强制性CCC认证,部分产品通过欧共体CE认证、德国GS认证等,产品由中国人民保险公司产品质量责任承保,其中生产的漏电断路器系列系国家电力公司农村电网改造推荐产品,电能表系列被列为国家经贸、水利电力部入网推荐产品,公司并被列为大庆油田供应成员单位。

If the scheme were implemented in full, it would involve spending 400 billion ($560 billion) at today's prices, over the next 40 years, building enough solar power stations to satisfy 15% of European demand in 2050—together with most of North Africa's and Arabia's—and about 20 trans-Mediterranean HVDC cables which, unlike conventional AC power lines, can transmit power over long distances and through water without significant losses.

若计划得以全面实施,以当今的价格,将需花费4千亿欧元(5千6百亿美元),在接下来的40年,即到2050年建设足够多的太阳能发电站来满足欧洲15%的需电量,同时满足北非和阿拉伯半岛大部分地区的;修建大约20根跨地中海不同于传统交流电源线的高压直流电缆,它们可在海底长距离输电而无明显的损耗。

In recent years we have to undertake Shandong Haihua Group, Jinan Iron and Steel Group, Shandong Haitian Group, the total water in Shandong, Beijing Rui Sifu Technology Co., Ltd., Shenyang Heavy Machinery Manufacturing Co. Two-horse, Jiangsu Lianyungang Soda Plant, in Power Plant, Poplar River Power Plant, South Power Plant, and other units for the casting and machining of large projects, has been made in praise.

近年来我们先后承接山东海化集团、济南钢铁集团、山东海天集团、山东水总、北京瑞斯福科技有限公司、沈阳重型双马机械制造有限公司、江苏连云港碱厂、里能电厂、白杨河电厂、南定热电厂等单位的大型铸造与机加工项目,均取得了好评。

第18/87页 首页 < ... 14 15 16 17 18 19 20 21 22 ... > 尾页
相关中文对照歌词
Water & Power
推荐网络例句

And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.

47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。

Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.

提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。

Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...

嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。