查询词典 water power
- 与 water power 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The residential sewage, waste water containing oil or coal, and blowoff water from boilers in the power plant are collected together, and reused for whole station service system after centralized treatment, and the waste water from chemical desalting is used as ashsluicing water.
沙角C电厂废水回用工程将生活污水、含油废水、含煤废水、锅炉排污水收集起来,集中处理后回用于全厂杂用水系统,并将化学除盐废水用于冲灰。
-
The oil sewage disposed process is a complex disposal technique. The disposal process is more difficult for the change of PH Flux temperature of raw water and the other polluted quality. At present the disposed water by the system of oil of sewage is unstable and high cost. Now the method for the oil of sewage have physics chemistry physical chemistry and biology etc. In the every disposed method has its own specially, Basis of the oil sewage condition of power plant. The text use chemic method. Another word is method of Flocculation-deposition. Injecting Dosage into sewage. Making small suspends grain and the electrophorus colloid gather into bigger colloid and deposit. Separated it from water and purify the oil sewage. Make disposed oil water up to grade.
含油污水处理工艺是一个复杂的处理过程,在处理过程中由于受到原水浊度、PH值、配水流量、原水温度和其他水质污染等因素的影响,处理难度相当大,现时的含油污水处理系统普遍存在处理后的水质不稳定和处理成本高等问题,国内外含油污水处理采用的方法有物理法、化学法、物理化学法和生物法等,每种处理方法都有自己的特点,结合电厂含油污水的情况,本文主要采用化学法,具体来说是采用絮凝沉淀的方法,通过向废水中投加混凝剂,使细小的悬浮颗粒和带电胶体微粒聚集成较大颗粒而沉淀,使其与水分离,使含油污水得到净化,使处理后的废水各项指标达到排放标准。
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
This article introduced the general situation of the domestic and international ice jam research and the necessity of the water level research firstly. In succession, discussed the formation condition and the formation process of the ice cover in detail, the ice jam formation mechanism and the general regulation of development in the space, the water level variety process that caused by ice jam, factors that influence the ice jam water level: the river power factor, the thermodynamic energy factor, the water current dynamical factor and artificial factor etc..
文章首先介绍了国内外冰情研究的概况以及进行冰塞水位研究的必要性,接着,详细论述了冰盖的形成条件及形成过程,冰塞的形成机理及冰塞在空间发展的一般规律,由冰塞所引起的水位变化过程,影响冰塞水位的河势因素、热力因素、水流动力因素及人为因素等。
-
The problem was that the water pump could not pump in a nine-story residential building, as result the water would soon be used up. I arrived at night; found that liquid level relay broke down. then I installed a three-pole knife switch next to liquid level relay to power the pump manually, so the problem with no water to be solved provisionally. then I fitted the Level relay for them, finally the water pump can pump automatically again
有一次来电,物管说他们小区没有电工,说一幢9层的住宅楼一楼的水泵泵不上水,水池很快就会无水用了,晚上我到达现场,原来是液位继电器坏了,我当时已带上了三极的闸刀开关,在继电器的旁边装上闸刀开关,手动供电给水泵,临时解决了没水用的问题,过后才为他装上液位继电器,又恢复了自动泵水。
-
The characteristic of this installation compared with toe technologys now availatble is as follows; it needs no driving power, the structure of which is very simple; the water-supply height is not restricted for any factors within the most scops. Using H-O internal storing high-pressure gas pope as the pessure device, we can at least make the water-supply height to be 403.2 metres. If we use 16MPa mine filter press, transfering water freeboard can be very, and the height of weater-supply will be at least 1,644 meters, If the strenth of alloyed steel is desighed to be at least 50kg per square millimeters, the water-supply height will reach 50,565.6 metres.
该装置与现有技术相比其特点是:结构简单,不用动力,且上水高度在较大范围内不受任何条件的限制,采用H-0型内贮式高压气管作加压工具,从而使上水高度最少为403.2米,如果使用16MPa矿压机便可实现超高输水,其上水高度最少为1644米,按照合金钢强度最低50千克力/平方毫米设计,该装置的上水高度最少可达到50565.6米。
-
Sichuan Provincial Foreign Trade Metals and Minerals Import and Export limited liability company mainly engaged in technology transfer and production of complete sets of equipment and raw materials in bulk import and export business, operating the main products are: thermal power generation equipment, hydro-electric power equipment, power transmission equipment, environmental equipment, water treatment Equipment, general machinery, light industrial machinery, construction machinery, grain, oil, food machinery, transport machinery, plastics machinery, chemical machinery, packaging machinery, machine tools, machine tools, measuring tool cutting tools, hand tools, farm tools, rubber processing equipment, telecommunications equipment, system Sugar equipment, compressed air equipment, geological drilling equipment, ceramic equipment, railroad equipment, rolling stock, chemical equipment, industrial Li, teaching equipment, communications equipment, glass equipment, communication cables, power cables, all kinds of special light bulbs, all kinds of Electronic components, all kinds of hardware, all kinds of aluminum, profiles, steel, pig iron, iron alloy, nonferrous metals, ferrous metals, non-metallic mineral products and chemical raw materials, the company is now working with various world-renowned brand manufacturers and agents There is a close business contacts at the same time the company has also developed international financial institutions, loans and government bonds, and other related businesses bidding, so far, I Division in loans from the World Bank, Asian Bank loans in the tender have been repeatedly successful.
四川省外贸五金矿产进出口有限责任公司主要从事技术引进,成套设备和大宗生产原材料的进出口业务,经营的主要产品有:火力发电设备、水力发电设备、输变电设备、环保设备、水处理设备、通用机械、轻工机械、建筑施工机械、粮油食品机械、运输机械、塑料机械、化工机械、包装机械、机床、机床工具、量具刃具、手工工具、农具、橡胶加工设备、邮电设备、制糖设备、空气压缩设备、地质钻探设备、搪瓷设备、铁道设备、机车车辆、化工仪器、工业黧器、示教仪器、通讯仪器、玻璃仪器、通信电缆、电力电缆、各种特种灯泡、各种电子元件、各种小五金、各种铝材、型材、钢材、生铁、铁合金、有色金属、黑色金属、非金属矿产品和化工原料等,公司现与多个世界著名品牌的生产厂和代理商有着密切的业务往来;同时公司还开展国际金融机构贷款和国债项目等相关的招投标业务,迄今为止,我司在世界银行贷款、亚洲银行贷款等的招标中曾先后多次中标。
-
Based on water balance model, the change of figure coefficients of infiltration water and surface water storage under border irrigation was analyzed. The power index of movement distance and time has little influence on the figure coefficient of infiltration water in the course of surface water movement, which can be substituted by a stable value.
该文依据水量平衡模型,分析畦灌下渗水形状系数、地表储水形状系数的变化规律,结果表明下渗水形状系数受地表水推进过程中的推进距离和时间的幂指数影响很小,可用一个稳定值代替,由此建立了基于水量平衡原理的畦灌水流推进简化解析模型。
-
My company off the project has: Huaneng Nantong Power Plant chimney painted buoy 214 meters, Huaneng Nanjing Power Plant Boiler steel anti-corrosion, Jinggangshan Huaneng Power Plant chimney repair, the Beijing Coking Plant chimney buoy to improve environmental protection, Dalian TV Tower preservative 180 meters Shanghai Baoshan Iron and Steel Brick Chimney Demolition 55 meters height, Anshan Iron and Steel Company of seven anti-corrosion and repair chimneys, chimney towers Yangzi Petrochemical Company antisepsis, waterproof plugging Taizhou Telecom Tower, Dalian Power Plant cold water tower preservative, Guangdong Textile Ltd. Waterloo BOND Die 80-meter chimney and so on affect the arduous work by the construction units highly.
我公司承担过的工程项目有:华能南通电厂 214 米烟囱涂航标、华能南京电厂锅炉钢架防腐、华能井冈山电厂烟囱的维修、北京焦化厂烟囱环保航标改进,大连电视台 180 米铁塔防腐,上海宝钢 55 米砖烟囱拆除加高、鞍山钢铁公司七个烟囱的防腐和维修、扬子石化公司烟囱水塔防腐、泰州电信大楼防水堵漏、大连发电厂凉水塔防腐、广东奔达纺织有限公司滑模 80 米烟囱等等有影响艰巨工程,受到建设单位的高度评价。
-
Is a power tool to focus the design, manufacture and sale of the manufacturing enterprise, the company strictly in accordance with ISO9001: 2000 quality management system operation in the production process, the whole process of product quality control, the use of a sound work installed with a full range of technology to guarantee that is the first approved by the Department of Commerce export Europe and the United States, Japan and other countries of the enterprises, Li Wang—based resource integration of globalization, the internationalization of the operation team, ahead of the process design and perfect after—sale system , developed a truly international quality of the water and electricity installation of automatic slotting machine, a special impact on an electric drill, universal cutting machine, such as conventional power tools, which have a milestone, a revolutionary for carrying the tripod — the deep water and electricity automatic slotting machine global users, as a global market for electric tools manufacturers, our hearts with gratitude Wang, honored to return to China, to return to their homes, because China is the birthplace of China has the world's largest market, China is the real you.
湘潭力王电动工具制造有限公司是一家专注电动工具设计,制造,销售的制造企业,公司严格按照ISO9001:2000质量管理体系运作,在生产过程中,对产品进行全过程质量控制,采用完善的工装机具进行全方位的工艺保证,是国内首批经商务部批准出口欧美、日本等国的企业,力王立足全球化资源整合,国际化的营运团队,超前的工艺设计,完善的售后系统,开发出了真正具有国际品质的水电安装自动开槽机,特殊冲击电钻,万能切割机等常规电动工具,其中具有里程碑式,革命性的扛鼎之作——水电自动开槽机深受全球用户欢迎,作为全球电动工具市场的主要生产商,力王怀着感恩之心,无上光荣回到中国,回到自己的家,因为中国是发源地,中国拥有世界上最大的市场,中国是真正的大家。
- 相关中文对照歌词
- Water & Power
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。