英语人>网络例句>water power 相关的网络例句
water power相关的网络例句

查询词典 water power

与 water power 相关的网络例句 [注:此内容来源于网络,仅供参考]

On the instance of sand factor to shallow evolvement being feeblish , The analysis of water power is especially important.

水动力因素是影响浅滩演变的一种主要因素,在泥沙等因素对浅滩演变影响较弱的情况下,水动力的分析就尤显重要。

Integrate with construction building and design ,municipal and governmental building , steel structure , installation of water ,power, heating and rest room , premaking parts , hoist , decoration , fitting and making of aluminum alloy with comprehensive service..

公司集建筑施工、设计、市政施工、钢结构、水电暖卫、装饰装修、铝合金制作安装等为一体,实行一条龙服务,公司机械设备力量雄厚,拥有与之配套的各种机械化施工设备。

As long as the wellspring there is plenty,we will build numbers of water power station.

内容加载中。。1。只要那里水源充分,就在那里修建大批的水电站。

Party A should consult with the airport who will provide Party B with water, power supply and passage convenience.

和工程方案的适当性及其与甲方广告方案的一致性承担全部责任。

This paper introduces the anchor design principle and calculation method of the crane girder on cliff wall in Huizhou pump and storage water power station,especially analyses the prototype observation and discusses the relating questions for the anchor design.

简要介绍惠州抽水蓄能电站工程岩壁吊车梁的锚杆设计原则和计算方法,重点对原形观测资料进行分析,并对岩壁吊车梁锚杆设计的有关问题作了探讨。

It is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes.

它是用来演练重型预应力锚孔在边坡的水电站,铁路或公路工程,以及排水孔。

The research in this thesis successfully resolved the downstream energy dissipation and erosion control problem of Yingping water power station, and thoroughly studied the hydraulic characteristics of the training frusta, which offers certain reference values for similar project problems.

该论文研究成果解决了阴坪水电站闸坝下游消能防冲实际问题,并深入探讨了导流墩的水力特性,为类似工程消能防冲问题的研究提供了参考依据。

Calculationsabout hydraulic transients are very important to make water power stations safe.

水力过渡过程的正确计算对于保证水电站的安全运行具有相当大的重要性。

All pontoons offer fresh water, power supply, telephone, fax, and satellite TV.

所有浮桥提供食水,电力,电话,传真和卫星电视。

As the construction of water-power engineering is mainly influenced by the environment conditions and the supply of resources, there are always many stochastic and unpredictable factors make the time arrangement of each item have several feasible schemes, and the different risks for different schemes.

由于水电工程在建设中受自然条件、资源供应等条件影响和制约,往往存在着一些随机的或难以预见的因素,使得各项工作的时间安排存在着几种可行方案。

第10/87页 首页 < ... 6 7 8 9 10 11 12 13 14 ... > 尾页
相关中文对照歌词
Water & Power
推荐网络例句

As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.

每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。

Maybe they'll disappear into a pothole.

也许他们将在壶穴里消失

But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.

但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。