查询词典 water power
- 与 water power 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It is composed of ZSFZ wet alarm valve, water-power alarm bell, delayer, pressure switcher, water supply pipe, water sprayer, etc.
系统由ZSFZ湿式报警阀、水力警铃、延迟器、压力开关、水流指示器、供水管网、闭式洒水喷头、报警控制装置和信号碟阀等部件组成。
-
However, maintenance-free batteries, the maintenance of the existing system is without water, this way, will inevitably WATER POWER CONTROL VALVE cause the battery to water loss, the battery dry.
但在免维护电池中,旋塞阀在现有的维护制度下是不加水的,这样一来,将不可避免造成电池的失水、电池干枯。
-
Rice-polishing device using water power;water power trip-hammer for husking rice
滴水可使石穿。比喻坚持不懈,集细微之力也能成就难能之功
-
The discharge calculation coefficient k,x can be used to the discharge calculation under the condition of fixed numerical value,solves some special demands in water power planning and design and similar calculation of unsteady flow in the pondage water power station.
马斯京根法流量演进系数K,x,在数值不变的条件下应用于河段短时段的流量演算,解决了水利水电工程规划设计中的一些特殊要求和水电站日调节不稳定流演进的近似计算问题。
-
Hydraulic transients of transport water system in water power stations are aboutwater hammer and surge in surge chamber, which are caused by load changes ofelectrical machine set in water diversion system or tail water system.
水电站输水系统的水力过渡过程是指由于电站机组负荷变化,在水电站输水系统中产生的水击、调压室涌波的过程。
-
In recent years, the company has completed 125 MW power plant in Sichuan Minjiang River unit, 125 MW unit of Pingdingshan in Henan, Shaanxi water-power plants of 300 MW Unit, Chengdu, Sichuan Wayao three 55 MW power plant unit of the overall task of construction and the construction of the Sichuan, Chongqing, Guizhou, Henan, Guangxi, Guangdong, Fujian, Hunan, and so a large number of 1,200 square meters to 10,000 square meters of hyperbolic cooling towers, 60 ~ 240 M Xin, such as its smoke 50 cigarettes or tower construction, construction output in 2003 from the 21000000-2004 years 55 million, from 2005 the 110000000-2006年230 million for four consecutive years of double the rate of increase has created one after another miracle!
近年来,公司先后完成四川岷江电厂125MW机组、河南平顶山125MW机组、陕西清水川电厂300MW机组、四川成都三瓦窑电厂55MW机组的整体建筑工程施工任务,并承建了四川、重庆、贵州、河南、广西、广东、福建、湖南等一大批1200㎡~10000㎡的双曲线冷却塔,60~240M烟囟等其计50座烟塔的施工,施工产值从2003年的2100万到2004年的5500万,从2005年的11000万到2006年23000万连续四年翻倍的速度递增,创造了一个又一个的奇迹!
-
The main business cleaning table, the coal jig, the spiral chute, the flotation machine, the spiral sorting machine, the ball mill, the stirring chest, the feeding engine, for the ore machine, the shaker, the breaker, the sand pump, the magnetic ore separator, the water power sorting machine, the water power cyclone, hits the granulated substance machine, the laboratory sand pump, the laboratory table, the laboratory spiral chute, the laboratory flotation machine, the laboratory ball mill, the laboratory breaker, the laboratory magnetic ore separator, the laboratory adjusts the stuffchest, the grinder, products and so on vacuumfilter, in addition may make to order each kind of model according to the customer request the dressing mechanical device.
主营选矿摇床,跳汰机,螺旋溜槽,浮选机,螺旋分级机,球磨机,搅拌槽,给料机,给矿机,振动筛,破碎机,砂泵,磁选机,水力分级机,水力旋流器,打砂机,实验室砂泵,实验室摇床,实验室螺旋溜槽,实验室浮选机,实验室球磨机,实验室破碎机,实验室磁选机,实验室调浆桶,研磨机,真空过滤机等产品,另可根据客户要求定做各种型号的选矿机械设备。
-
Fifty-year course of development for water power construction in Sichuan province is reviewed , typical hydropower stations are introduced in those years, the important role of hydropower as a vanguard in economic development in Sichuan is presented and several problems which restrict development for water power construction are pointed out .
回顾了四川省水电建设50 年的发展历程,介绍了50 年水电建设中有代表性的电站,阐述了水电在四川省充当&名符其实&的经济发展&先行官&的重要作用,指出了制约四川水电发展的几个问题。
-
Test analysis of sparse fall of water pressure In order to examine the water power relation situations of two levels, this ore carried on a experiment of closing the valve in -400m, after turned off the valve one day, the water level rose from -400m to -70m, accumulated water volume 240m3, also two hydraulic pressure rose, it explained that the two water entries had certain water power relation, it also accumulated that the hydrospace are not big.
测试分析稀疏秋天的水压力为了探讨水权关系的情况下两个层次,这个矿进行了一项实验,关闭阀门,在400米后,关掉阀门一天,水位上升至- 400米至70米,累积水量240立方米,还有两个水压上升,它解释说,这两个水作品,也有一定的水权关系,而且还积累了hydrospace并不大。
-
The pump shaft power is generally water, power, friction loss of power and leakage power of these three parts combined.
泵的轴功率一般为水功率、摩擦功率和泄漏损失功率这三部分的总和。
- 相关中文对照歌词
- Water & Power
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。