查询词典 water level
- 与 water level 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on the management principle and objective of Jiangsu SNWDP, the thesis establishes its management framework and designs three management patterns and four modes. Through analyzing the anticipative management effect, scopes in point, advantages and disadvantages of each modes seriatim, the thesis confirms the recommended pattern. It makes framework refinement design, defines rights and duties of control level, execution level and participation level for the recommended pattern. According to the principles of planned water use, metered water use, contract water use, toll water use, it studies project operation for recommended pattern from four aspects, namely water supply plan, measure intensified, water supply contract, and water rate enacted. The thesis analyses and studies how to ensure water supply quality of Jiangsu SNWDP from three levels, including doing watershed protection, intensifying intermediate process, and establishing a long-term mechanism. It makes brief design for dispatching management applied system, studies emphases parts which may affect operation of the pattern in practice, also analyses dispatching optimization of Provincial boundary project management, pumping station management, and different water resources. Finally, the thesis studies relevant basal supports and development stratagems for the management of Jiangsu SNWDP.
本文从分析南水北调江苏境内工程的管理原则、管理目标入手,构建南水北调东线江苏境内工程管理组织框架,设计了管理的三种模式,四个方案,对各种方案的预期管理效果、方案的适用范围、方案的利弊逐一分析,经比选后确定推荐模式;并对推荐模式进行结构细化设计,界定调控层次、执行层次、参与层次的权责;从供水计划、加强计量、供水合同、水价制定方面对推荐模式进行了工程运营的具体研究;从做好源头保护、强化中间过程、建立长效机制三个层次,分析研究如何确保南水北调江苏境内供水水质;对调度管理应用系统作了简要设计;针对实际管理中可能影响整个模式运行的重点细部:省界工程管理、泵站工程管理、不同水资源的优化调度等进行了研究;本论文还分析研究了南水北调江苏境内工程管理的相关基础支撑和发展战略。
-
The paper through the mechanism which produces to the asphalt road surface water harm carries on the induction to summarize, as well as the different type bituminous mixture water stability has carried on a series of contrasts experiment to several kind of different aggregates and the asphalt adherency, has analyzed the aggregate and the asphalt adherency and the bituminous mixture water stability; Meanwhile moves the water action mechanism take the pavement structure in as the key point, in the basis room experiments to the design half rigid base bituminous mixture test sample carries on washes out the experiment, the observation test sample and washes out when the number of times increase along with the time variation the basic unit wash load situation, has analyzed the water to the bituminous pavement various structures level damage rule; To immerses under the condition using the ANASYS finite element software the bituminous pavement structure level the stress to carry on the analysis computation, and analyzed the bituminous pavement according to the computed result to produce the unboiled water harm the rule, further to understand the structure level produced the unboiled water harm the rule.
本论文通过对沥青路面水损害产生的机理进行归纳总结,对几种不同集料和沥青的粘附性以及采用不同抗剥落措施的沥青混合料的水稳性进行了一系列对比试验,分析了集料与沥青的粘附性及沥青混合料的水稳定性,并对水稳性试验进行了评价;同时以路面结构中的动水作用机理为重点,依据室内试验对设计的半刚性基层沥青混合料组合试件进行冲刷试验,观察试件随时间变化和冲刷次数增加时基层的冲刷量情况,分析了水对沥青路面结构层的损坏规律;利用ANSYS有限元软件对浸水前后沥青路面层底应力进行分析计算,并根据计算结果分析了沥青路面产生水损害的规律,进一步了解结构层产生水损害的规律。
-
The stress distribution of the semi-circular breakwaters with holes by different quantitative ice value to water level, especially the stress distribution of holes is analyzed. The effect of the stress distribution to the holes and the wall thickness are discussed. At last, the result is compared to the stress distribution by wave
应用ANSYS程序计算了不同水位不同量级冰力作用下开孔半圆型防波堤的应力分布,尤其分析了孔洞周围的应力分布;并且讨论了开孔和壁厚对于应力分布的影响;最后将分析结果与波浪力作用下的应力分布进行了比较。
-
The control system can turn on/off the laser rangefinder, extract the water-level data, process data and store data in SDRAM and Flash Memory.
设计完成的控制系统可以实现控制激光测距仪的开关、测量数据的获取和处理、测量数据的SDRAM存储和FLASH存储。
-
We get the conclusion that geomagnetism and underground water level observations are the fairly good precursor methods.
我们认为地磁和地下水位是比较好的前兆观测方法。
-
The Three Gorges Project of the Yangtze River; Water level fluctuation; Landslides and rockfalls; Principles of prevention
袁中友;唐晓春;作者单位:华南师范大学地理系;华南师范大学地理系广东广州中文关键字:长江三峡工程;水位变动;崩塌滑坡;治理对策
-
The internship is required of instruments used are mainly water level, standard ruler, tripods, theodolites.
本次实习中需要用到的仪器主要有水准仪、水准尺、脚架、经纬仪。
-
A recent upswing in Balkhash's water level, which some link to the rapid melting of the glaciers, is one explanation for the lack of urgency.
最近的回升,在巴尔喀什的水位,其中一些连结到快速融化的冰川,是一个解释为缺乏紧迫感。
-
At the Hoover Dam, the water level has dropped more than 80 feet.
胡佛水坝的水位线至今已经下降了不止80英尺(约为24米)。
-
In view of the calculation of the start-up time difference of in-lake and out-lake pumping stations on the upper and lower lakes,this article researches on the following related contents,such as the necessary and sufficient conditions of start-up of out-lake pumping station,the relation between the start-up time of out-lake pumping station and rising velocity of lake water level.
针对南水北调南四湖上、下级湖各自调水的出、入湖口提水泵站开启时间差的计算问题,开展了调水出湖提水泵站开启的必要和充分条件、出湖提水泵站开启时间和湖内水位升高速率等相关内容的研究。
- 推荐网络例句
-
Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".
歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。
-
This is Kate, and that's Erin.
这是凯特,那个是爱朗。
-
Articulate the aims, objectives and key aspects of a strategic business plan.
明确的宗旨,目标和重点战略业务计划。