查询词典 water and electricity
- 与 water and electricity 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Top Click: Beijing prosperous band \ power with tropical \ power tracing \ with tropical \ Electric Heating Band \ plus tropical \ Beijing band \ prosperous band \ constant power band \ Self-Regulating band \ explosion-proof band \ since limit temperature band \ silicone rubber band \ glass fiber band \ ceramic crawler band \ tank insulation band \ electricity with thermal insulation band \ Chemical pipeline explosion-proof band \ pipeline special explosion-proof band \Natural gas pipeline explosion-proof band \ special explosion-proof band \ offshore oil platform explosion dedicated band \ marine explosion-proof band \ silicone rubber band drums \ to heating a dedicated band \ Fire pipeline explosion dedicated band \ Instrumentation Pipeline explosion-proof band \ Power Plant special explosion-proof band \ steel plant-specific anti-band \ chemical special explosion-proof band \ solar water pipes dedicated band \ cement pipe dedicated band \Pipe insulation dedicated band \ constant power electric tracing band \ Self-Regulating Electric with tropical \ Distribution HA-specific anti-desiccant band \ substation explosion-proof band dedicated dehumidification \ high-pressure explosion-proof cable dedicated band of snow and ice \ Pharmaceuticals explosion-proof plant cooling tower dedicated band \ mine water pipeline explosion-proof band dedicated \ Oil and Gas Transport Special Vehicle explosion-proof band \ super-long and other type of special explosion-proof band.
热门点击:北京富强电热带 \电伴热带\ 电伴热\ 伴热带\ 电加热带\ 加热带\ 北京电热带 \富强电热带\ 恒功率电热带\ 自控温电热带 \防爆电热带 \自限温电热带 \硅橡胶电热带 \玻璃纤维电热带 \陶瓷履带式电热带\ 水箱保温电热带 \电伴热保温电热带 \化工管道防爆电热带 \输油管道专用防爆电热带\ 天然气管道防爆电热带\ 特种防爆电热带\ 海洋石油平台专用防爆电热带\ 船用防爆电热带\ 硅橡胶油桶电热带 \地采暖专用电热带 \消防管道专用防爆电热带 \仪表管线防爆电热带 \热电厂专用防爆电热带 \钢铁厂专用防爆电热带 \化工厂专用防爆电热带 \太阳能水管专用电热带 \水泥厂管道专用电热带\ 管道保温专用电热带\ 恒功率电伴热带 \自控温电伴热带\ 配电房除湿专用防爆电热带 \变电站除湿专用防爆电热带\ 高压电缆化冰雪专用防爆电热带 \制药厂冷却塔专用防爆电热带 \煤矿水管道专用防爆电热带\ 油气运输专用车防爆电热带\ 超长型特种防爆电热带等。
-
Second, pay close attention to water conservancy facilities, in fully grasping Shihfang nullah at the same time, a number of new water conservancy projects, after electricity dam irrigation, drainage and dam heights village branch lined on three sides, and strive each year for 600 acres of irrigated area.
其次是狠抓水利设施,在全力抓石坊大渠同时,新上一批水利工程,后坝电灌、高峰村水渠和河坝支渠三面衬砌,力争每年新争灌溉面积600亩。
-
This complex reaction was phenolic electronic substitution reaction, so reaction rate was related with the positive electricity of pro-electronic reagent, as well as the form of aromatic hydrocarbons. Rates of chlorination of phenol and 2-monochlorophenol were faster in alkaline water than that in weak acid water, so 2,4-dichlorophenol and 2,4,6-trichlorophenol formation concentrations increased with the reaction time.
该复合反应属于酚类电子取代反应,反应速率与亲电子试剂的阳电性以及芳香烃的形式有关,碱性水环境中氯取代苯酚和2-一氯酚的速率要快于在弱酸性水环境;随着pH的升高,2,4-DCP和2,4,6-TCP的生成浓度也不断增加。
-
Put through the high-pressure washing machine with the electricity power and water; fix the plastic pipes and inspect the water pistol.
将高压冲洗机接通电源、水源,装好冲洗胶管,检查水枪效果。
-
The furnace body is made ф2200×1500 the outer covering main body by the 12mm steel plate, lower part the furnace body 45° the installment has the sensor, the sensor orientation silicon steel plate is made the weight 2 ton induction iron cores by Wuhan Steel Corporation Silicon steel plate Factory production top gear's W-151 the cold rolling 0.35m/m, primary is made the water cooling coil by 10×10×2 the copper pipe, and installs the stainless steel water cooling restricting, the power frequency has the core smelting furnace's metal melt fluid namely for the sensor sencondary coil, the entire electric stove is a transformer actually, the necessary 6 grades from the pair regulating transformer, shift gears by the electricity cabinet control, the voltage may from low to high, divide 6 promotions to arrive at 380V, each grade of voltages are different, the output is also different, the furnace temperature along with the files position is also different, but the height is different, adapts smelts colored or the black and so on melting point different metals, and may make the new furnace lining to smelt diamantine drying furnace fireproof.
炉体由12mm钢板制成Ф2200×1500外壳主体,炉体下部45°安装有感应器,感应器由武钢硅钢片厂生产的最高档的W-151冷轧0.35m/m取向硅钢片制成重2吨感应铁心,初级由10×10×2铜管制成水冷线圈,并安装不锈钢水冷保护套,工频有芯熔炼炉的金属熔液即为感应器的次级线圈,整个电炉实际就是一个变压器,配套一台6档的自耦调压变压器,由电柜控制换档,电压可由低到高,分6级升到380V,每档电压不同,输出功率也不同,炉温也随档位不同而高低不同,以适应熔炼有色或黑色等熔点不同的金属,并可作新炉衬耐火冶金砂烘炉之用。
-
The furnace body is made ф2200×1500 theouter covering main body by the 12mm steel plate, lower part the furnace body 45° the installment has the sensor, the sensor orientation silicon steel plate is made the weight 2 ton induction iron cores by Wuhan Steel Corporation Silicon steel plate Factory production top gear's W-151 the cold rolling0.35m/m, primary is made the water cooling coil by 10×10×2 the copper pipe, and installs the stainless steel water cooling restricting, the power frequency has the core smelting furnace's metal melt fluid namely for the sensor sencondary coil, the entire electric stove is a transformer actually, thenecessary 6 grades from the pair regulating transformer, shift gears by the electricity cabinet control, the voltage may from low to high, divide 6 promotions to arrive at 380V, each grade of voltages are different, the output is also different, the furnace temperature along with the files position isalso different, but the height is different, adapts smelts colored or the black and so on melting point different metals, and may make the new furnace lining to smelt diamantine drying furnace fireproof.
炉体由12mm钢板制成Ф2200×1500外壳主体,炉体下部45°安装有感应器,感应器由武钢硅钢片厂生产的最高档的W-151冷轧0.35m/m取向硅钢片制成重2吨感应铁心,初级由10×10×2铜管制成水冷线圈,并安装不锈钢水冷保护套,工频有芯熔炼炉的金属熔液即为感应器的次级线圈,整个电炉实际就是一个变压器,配套一台6档的自耦调压变压器,由电柜控制换档,电压可由低到高,分6级升到380V,每档电压不同,输出功率也不同,炉温也随档位不同而高低不同,以适应熔炼有色或黑色等熔点不同的金属,并可作新炉衬耐火冶金砂烘炉之用。
-
The apartment house rents out the CBD competitive product. 60 flat hardcover apartment houses rent out the other times of CBD national trade building two well subway international one bedroom and one living room. Firmly enter on August 8 , 2008. 200 rice of national trade building CBD south , three east ring two well bridges edges, the times international praises one one government department at the provincial level of one standard garden room kitchen one Wei 60 all , decorate the brand-new brand home appliance accurate: HAFELE brand overall cupboard , SAMSUNG air-conditioning, SRONA white surpasses reality wooden floor board, XOCECO 29 inches of mirror surface pure tie right angle figure core TV , full-automatic washing machine of SANYO , MIDEA electricity water heater , municipal administration two roads circulation supply hot water , AUPU bath despot , the central heating in winter temperature self is adjustable , machine and the stainless steel stove check VANWARD lampblack, ROYALSTAR surpasses big refrigeration refrigerators 186 litres , 2 meters of luxury China of FULEHUA double bed seat dream thinks of bed , 3 opens the door the luxurious wardrobe , cloth gown sofa , stalinite end table, have a dining table.
国贸CBD南200米,东三环双井桥边,时代国际嘉园正规一室一厅一厨一卫60平,精装修全新品牌家电:HAFELE品牌整体橱柜,SAMSUNG空调,SRONA白色超实木地板,XOCECO29英寸镜面纯平直角数字芯电视,SANYO全自动洗衣机,MIDEA电热水器、市政两路循环供应热水,AUPU浴霸,冬天集中供暖温度自己可调,VANWARD油烟机及不锈钢炉盘,ROYALSTAR186升超大冷藏冰箱,FULEHUA富丽华2米双人床席梦思床,3开门豪华衣柜,布衣沙发,钢化玻璃茶几,有饭桌。
-
For electricity, they communicated with CR3B and the power supply came back on the evening of February 16th. For water, they "mooched" from nearby parties and organized the staff to fire the pipes, then the water supply got right on the fourth day. For the residence, the staff crowded into the limited rooms and put up temporary tents.
没有电,出面与三局调度协调沟通,在2月16日晚恢复供电;没有水,先到周边单位&讨&,再组织人员对管道进行&烧烤&,第四天保证自供水;没有住,人员往有限的房间挤,住不下的,搭临时帐篷。
-
Free fees for processing for registration of land from collective ownership to national ownership in the district .2.All the roads and facility of water,electricity,greens ,water supply and drainage is solved by Hanting district,Also being built by developers by land changing.
六、有关政策:1、办理集体土地转为国有土地手续,免收区及区以下各类收费2、城区主次道路及和主次道路配套的水、电、绿化、供排水等设施有区政府统一配套,或由开发商以土地置换式建设3、所有建筑的地下建筑部分免缴配套费4、建筑高度大于25米(即住宅约8层,办公、金融、商务等约7层)以上建筑面积免收城市建设配套费。
-
The company launched the "three-saving" activities and focus on day-to-day work from the start, in the office take full advantage of natural illumination region and resolutely put an end to the "light" and "day light", to strengthen the internal management of water equipment maintenance, and resolutely put an end to " long flowing water ", make full use of network resources, the promotion of office automation and paperless office, a serious work ahead of time in front of the reasonable use of the material planning and arrangements, was to make good use of electricity, a piece of paper, a nut, a pin nails a pin, one inch wire.
该公司在开展&三节约&活动过程中注重从日常行为和工作入手,在办公区域充分利用自然光照,坚决杜绝&长明灯&和&白昼灯&,加强公司内部的用水设备维护管理,坚决杜绝&长流水&,充分利用网络资源,提倡办公自动化和无纸化办公,认真提前做好工作前的使用材料的合理计划和安排,用好一度电,一张纸、一个螺帽、一个脚钉、一个销子、一寸导线。
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。