查询词典 wall bearing
- 与 wall bearing 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
On the basis of the former researches and taking into account the practice of our country, this paper take the low period repeat loading experiment for three rigid conjunction node of steel beam and concrete wall, researching their load-bearing capacity and earthquake resistance performance under the low period repeat loading action, the main content concentrate on the following aspects:(1) Analyzing the three joint's damage shape、hysteretic curve、change of rigidity、yielding load、limit load、damage load、durability、energy dissipation capacity、the strain of the key position and the moment transferring mechanism.(2) Comparing the joint's load-bearing capacity and earthquake resistance performance among the joints with different stud bolt diameter and different connection plate thickness, researching some factor's influence on the work performance of the joint such as the high and strong stud bolt specification、connection plate thickness .
本文在前人研究的基础上,结合我国的实际情况,对3个钢梁-混凝土墙刚接节点试件进行了低周反复荷载试验,对其在低周反复荷载作用下的承载力和抗震性能进行了研究,内容主要集中在以下几个方面:(1)对3个节点试件在低周反复荷载作用下的破坏形态、滞回曲线特性、刚度变化、屈服荷载、极限荷载、破坏荷载、延性性能、耗能能力、关键部位的应变分布情况及节点核心区的受力情况进行了试验研究和理论分析;(2)比较了不同螺栓规格和不同连接板厚度的节点试件的承载力和抗震性能,研究了高强螺栓规格和连接板厚度这2个因素对节点工作性能的影响;(3)介绍了光纤光栅传感技术在土木工程领域中的应用研究现状及其基本原理;并通过对比试验,探讨了光纤光栅传感器用于土木工程检测的可行性及实现途径。
-
The tuckstones with broken end and bearing plate for breast wall can be replaced without demolishing breast wall during cold repair.
熔窑冷修不用拆胸墙就可以更换断头的挂钩砖和胸墙托板,方法新颖,节约投资,效果良好。
-
Decades, the system does not always produce pipes, tiles, cement products and other traditional rod, but the development should be high (high-strength, high pressure) and large, new (new building materials and products) as a key to develop new products In detail: to develop high-strength prestressed concrete pile; apply to set up more than 110 kilovolt high voltage transmission lines and electrified railway lines, etc. Catenary large t m poles; application of new high-speed heavy rail with pre-stressed concrete sleeper; high-pressure , large-diameter prestressed concrete cylinder pipe; steel concrete and prestressed steel-concrete composite pipe; new type of reinforced concrete pipes, such as the mouth and socket bearing steel reinforced concrete pipes, square pipes, short-shaped pipes, common drains ; reinforced concrete inspection and; urban and rural construction using a variety of hollow interior wall panels and composite wall panels, concrete hollow block.
不能几十年一贯制生产管、瓦、杆等传统水泥制品,更应把发展高、大、新作为重点开发新产品,具体讲:大力发展预应力高强混凝土桩;适用于架设110 千伏以上高压输电线路和电气化铁路接触网线路等的大吨米电杆;适用高速重载铁路用的新型预应力混凝土轨枕;高压、大口径预应力钢筒混凝土管;钢板混凝土和预应力钢板混凝土复合管件;新型钢筋混凝土排水管,如钢承口和承插式钢筋混凝土排水管、方型渠、短形渠、共同渠;钢筋混凝土检查并;城乡建设用的各种空心内墙板和复合外墙板、混凝土空心砌块。
-
The factors that influence the reliability index of retaining wall, such as base friction coefficient and inclined base, are discussed. The objective reliability index of anti-slide , anti-overturning of retaining wall and stability of bearing capacity of foundation soil have been obtained.
对按现行设计方法设计的重力式挡土墙的抗滑动和抗倾覆稳定性以及基底承载力的可靠指标进行了系统的计算和分析,并对影响可靠指标的因素进行了探讨。
-
The test results show:(1) Under the action of the EL-centro seismic wave the yield sequence of the structures is the root of shearing wall - end of beams - root of columns, while the shearing wall functions as bearing of the most of anti-seismic action of the structures.
试验结果表明:(1)在EL -centro地震波作用下,结构的屈服顺序为:剪力墙根部—梁的端部—柱的根部,且结构的大部分抗震作用将由剪力墙承担,因此剪力墙的屈服强度对结构的承载能力和变形影响很大。
-
This paper uses LIZHENG to check the stability of the retaining wall. Both of them aren't meet the requirements. And the bearing capacity at the toe of the retaining wall which belongs to AB slope isn't meet the requirement.
利用理正软件对边坡的挡墙进行稳定性验算:两段边坡下挡墙的抗滑移稳定性均不满足要求,且AB段挡墙墙趾处的承载能力也不满足要求。
-
The bung uses the stainless steel plate to make the ledger wall, the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire doorclosure the entire fire door is a circular whole, the fire door sealing property strengthens, the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the workpiecewillfully, because turntable every 40 minutes turn on lathe biography one week, when work the operators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntableto be possible in 20-60The minute revolves one week-long time to modulate velocity willfully, no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, onlyneed press down on the control electricity tank's pause button then, the fire door opens shuts, grasps voluntarily by the operators, presses installs nearby the fire door opens shuts button then. Transfers the bottom type resistance furnace's temperature control part to use the microcomputer automatic
炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。
-
The bung uses the stainless steel plate to make the ledger wall, the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire door closure the entire fire door is a circular whole, the fire door sealing property strengthens, the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the work piece willfully, because turntable every 40 minutes turn on lathe biography one week, when work the operators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntable to be possible in 20-60The minute revolves one week-long time to modulate velocity willfully, no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, only need press down on the control electricity cabinet's pause button then, the fire door opens shuts, grasps voluntarily by the operators, presses installs nearby the fire door opens shuts Niu then.
炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。
-
The bung uses the stainless steel plate to make the ledger wall,the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire door closure the entire fire door is a circular whole, the fire door sealing property strengthens,the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the work piece willfully, because turntable every 40 minutes turn on lathe biography one week, when work theoperators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntable to be possible in 20-60The minute revolves one week-long time to modulate velocity willfully,no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, only need press down on the control electricity cabinet's pause button then, the fire door opens shuts,grasps voluntarily by the operators, presses installs nearby the fire door opens shuts Niu then.
炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。
-
According to quality problems of wall,it analyzes causes of cracks、scumming and abscission in mass cement sand pulp wall plastering ,and puts forward prevention measures to ensure beautiful view of wall.
针对工程墙面存在质量病害的现象,分析了大面积水泥砂浆墙面抹灰出现裂纹、泛霜、脱落的原因,介绍了其防治措施,以保证墙面的美观效果。
- 相关中文对照歌词
- Fly On The Wall (Intro)
- Do The John Wall
- Apnoea
- Empire State Human
- Hittin' A Wall
- The Heathen
- Big Beer Wall
- Get Down On It
- Pictures On My Wall
- Balls To The Wall
- 推荐网络例句
-
Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.
目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。
-
On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.
一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。
-
What is the topic sentence of this article?
这篇文章中心的句子是那一句?