查询词典 upper beam
- 与 upper beam 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
We hope you pay more attention to jobs are as follows haven't been finished this week:(1) right and left side of upper water wall has been aligned and fixed;(2) Nine downcomers been pre-stored;(3) All the wall packing aligned and fixed, then install right and left side rigid beam;(4) Finishing welding counterpart of front wall packing;(5) Get two booster pump for turbine driven boiler feed water pump aligned and make inspection;(6) Electric Feed Water Pump Unit, Coupling and Motor Pump positioned;(7) Equipment in Start-up Boiler House aligned and make inspection;(8) Get three Reusing Water Pump aligned;(9) Equipment in Integrated Water Pump House aligned and make inspection.
本周,以下工作未完成,希望贵单位引起重视:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)2台汽动前置泵找平找正,并验收;(6)电动给水泵组,耦合器和电泵就位;(7)启动锅炉房内设备找平找正,并验收;(8)3台复用水泵就位;(9)综合水泵房内设备找平找正,并验收。
-
Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.
下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。
-
In this paper combined with actual works the design and construction method are introduced that applying pouring joist with pin key one existing brick wall to form a wall beam with upper masonry enhances the wall's load after cutting a big hole in it.
结合工程实例,介绍了在已有砖墙上浇筑带销键的托梁,与上部砌体形成墙梁来承托开凿宽大窗洞后的洞顶墙体荷载的设计、施工方法,指出该方法取得了良好的应用效果,既加快了施工进度,又降低了造价。
-
Stand on the beam on the ball of one foot, lifting the other leg and using it and your arms to find a balance point. When you've mastered that, try standing on one leg with the other leg behind you, and then lean forward with your upper body while raising your back leg as high as possible, using only your outstretched arms as stabilizers to stave off a face plant.
用一只脚的圆形部位站在杆上,举起另一只脚然后用手臂来保持平衡,当你已经可以自由运用,尝试站著时,另一只脚伸到后面抬得愈高愈好,同时身体往前倾,只用你伸出去的那支手当平衡器免得脸摔到地上。
-
Because effect of upper bridge to longitudinal vibration of pier could not be neglected,fundamental frequency calculation formulas of pier restrained on its top by bridge beam were derived based on energy method.
针对实际工程中桥梁上部结构对桥墩顺桥方向振动具有不可忽略的约束作用,在能量法的基础上推导出了顶端受桥梁约束的桥墩复合振动基频计算公式。
-
Imported high-rigidity aluminum-alloy beam and linear slide rail are employed for transverse move and upper/lower arm Together with the application of high-rigidity bearing steel, the requirements of?
引拔及上下手臂使用质量轻高刚性的铝合金挤型梁配合线性轴承及高刚性轴承钢,高效能、震动些?
-
See revised figure will increase based on SC-02 schematic form filling is not aimed at a base, is here to meet the requirements of the two programs are filling in the rubble masonry walls directly on the basis of the provisions under the Chinese drawing specifications, structure Orthography of commonly used map drawing, there is no column in the upper part of the case can not indicate a position of the axis of the concrete beam elevation, sections and steel can be combined with SC-07 and SC-08
中国国家建筑标准设计图集《03G101-1》第4.2.3条第六项有说明:梁顶面标高高差,系指相对于结构层楼面标高的高差值,对于位于结构夹层的梁,则指相对于结构夹层楼面标高的高差。有高差时,需将其写入括号内,无高差时不注。中国规范现在均采用的是平法施工图的简化表示方法,不需表示梁的剖面
-
A beam laid along the ridge of a roof; provides attachment for upper end of rafters.
沿着屋脊的横梁;为椽的上顶提供辅助。
- 推荐网络例句
-
Plunder melds and run with this jewel!
掠夺melds和运行与此宝石!
-
My dream is to be a crazy growing tree and extend at the edge between the city and the forest.
此刻,也许正是在通往天国的路上,我体验着这白色的晕旋。
-
When you click Save, you save the file to the host′s hard disk or server, not to your own machine.
单击"保存"会将文件保存到主持人的硬盘或服务器上,而不是您自己的计算机上。