英语人>网络例句>up-face 相关的网络例句
up-face相关的网络例句

查询词典 up-face

与 up-face 相关的网络例句 [注:此内容来源于网络,仅供参考]

Looking back, even though the direction of speaking, lighten up are doing right, but because we have relatively large size of this fund, and some have been victimizes the stock quickly recovered up, so they are actually lighten up to enjoy the benefits is also very low and is not obvious.

现在回过头来看,虽然从方向上来说,减仓是做对了,但是因为我们这个基金规模比较大,而且有些被错杀的股票很快就恢复了上涨,所以其实减仓享受到的收益也很微薄,并不明显。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Secondly, it summarizes development and gradual progress about operational risk measurement. Analyzes and compares two main categories at present: bottom-up and top-down, and Loss Distribution Approach of top-down and Income Model of bottom-up is studied deeply, then finds out the main challenges of operational risk measure methods. Thirdly, taking examples for Shanghai Pudong Development Bank and Shenzhen Development Bank, it demonstrates operational risk measurement of our banking using Basic Indicator Approach and Income Model of bottom-up. And by comparing its effects with analysis result of concrete loss incidents of operational risk, it is approved that to apply operational risk measurement to our banking is feasibility. Finally, the paper analyzes difficulties to measure operational risk, such as weak consciousness of measuring operational risk, short of effective modern measuring model, behindhand of loss data collection and lack of perfect inside management mechanism of measurement, and then gives some advices.

接着总结了操作风险度量方法的发展演进过程,对目前度量操作风险的两类主流方法&自下而上&法和&自上而下&法进行了详细的分析和比较,分别选取&自下而上&的损失分布法和&自上而下&的收入模型法展开深入研究,并剖析了操作风险度量方法面临的主要挑战;接着以&浦东发展银行&和&深圳发展银行&为例,选用&自上而下&的基本指标法和收入模型法进行了操作风险度量的实证分析,并将分析结果与使用具体损失事件的实际操作风险分析结果进行了比较,证实了操作风险度量方法应用于我国的可行性;最后文章对我国银行业度量操作风险中存在的现实困难进行了深入探讨,指出了我国存在操作风险度量认识障碍、缺乏适用的现代操作风险度量模型、损失数据收集工作滞后以及操作风险度量缺乏完善的内部管理机制保证四大方面的现实问题,并提出了对策建议。

As to the mate lag problems in loom beat up mechanism,comparing traditional four bar linkages with quick return four bar linkages beat up mechanism,the latter can solve the lag problems effectively.A CAD method of designing the quickreturn four bar linkages beat up mechanism is pointed out,and the design mathematics model and the kinematic analysis model are also presented.

针对现有织机打纬机构和开口机构在运动配合上存在的滞后问题,比较了传统的四连杆打纬和具有急回特性的四连杆打纬机构,基于后者能有效地改善配合上的滞后问题,提出了精确设计具有急回特性的四连杆打纬机构的CAD方法,给出了设计的数学模型、机构运动分析的数学模型。

Charge sound blowing up The battle drum strikes up and shout War cries up, 600 cavalry from the high-tilt down the slope, suddenly playing Everywhere looks for the tooth Yuan,Civilian clown Tsam Ma was also under the legislation.

冲锋号吹起来,战鼓擂起来,杀声喊起来,六百铁骑从高坡上倾斜而下,顿时打得袁军满地找牙,文丑也被立斩马下。

While the up-flow reactor is the key equipment in medium- and high-consistency clean bleach process, including oxygen delignification、hydrogen peroxide bleach、chlorine dioxide bleach、 ozone bleach, the flow characteristics of the medium consistency pulp in up-flow reactor have significant impact on the quality and the efficiency of the bleach reaction. In this work, a series of equipments are designed and manufactured for a systematic and deep study on the flow characteristics of the medium consistency pulp in up-flow reactor.

而升流式反应器是中高浓清洁漂白工艺(包括氧气脱木素、过氧化氢漂白、二氧化氯漂白、臭氧漂白等工艺)中的大型关键设备,中浓纸浆在升流式漂白反应器中的流动特性与漂白反应的质量、效率都有密切关系,因此本研究自行设计和制造了相关的实验设备,对中浓纸浆在升流式反应器中的流动特性进行了较为系统、深入的研究。

And the first trumpeted, and there was hail and fire mingled with blood, and it was cast to the earth; and the third part of the earth was burned up, and the third part of the trees were burned up, and all green grass was burned up.

8:7 第一位天使吹号,就有雹子与火搀著血丢在地上,地的三分之一被烧了,树的三分之一被烧了,一切的青草也被烧了。

Rev. 8:7 And the first trumpeted, and there was hail and fire mingled with blood, and it was cast to the earth; and the third part of the earth was burned up, and the third part of the trees were burned up, and all green grass was burned up.

启八7 第一位天使吹号,就有雹子与火搀著血丢在地上,地的三分之一被烧了,树的三分之一被烧了,一切的青草也被烧了。

And the first angel sounded the trumpet, and there followed hail and fire, mingled with blood, and it was cast on the earth, and the third part of the earth was burnt up, and the third part of the trees was burnt up, and all green grass was burnt up.

第一位一吹号角,就有搀著血的冰雹和火抛到地上;於是大地被烧毁了三分之一,树木也被烧毁了三分之一,青草全被烧尽。

第54/100页 首页 < ... 50 51 52 53 54 55 56 57 58 ... > 尾页
相关中文对照歌词
Chin Up, Cheer Up
Up, Up And Away
Up Up Up Up Up Up
Up, Up, Down, Down, Left, Right, Left, Right, B, A, Start
Up! Up! Up!
Roll It Up, Light It Up, Smoke It Up
Wrapped Up, Tied Up, Tangled Up
Up Up Up
Up Up Up
Up Up Up
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?