英语人>网络例句>up to 5 相关的网络例句
up to 5相关的网络例句

up to 5

与 up to 5 相关的网络例句 [注:此内容来源于网络,仅供参考]

"If Mum already get up, finish the following household duties or or before 5:30pm according to the timetable 1. clean up the toilet bath tub, sink, toilet bowl, mirror… ect; 2. kitchen (clean up cupboard, stove, wall, ventilation fan… ect"

"11:00-5:30pm ","开始做家务:若太太已经起床,然后根据时间表打扫 1 清洁及整理厕所(浴缸、洗面盆、马桶、镜) 2厨房(橱柜、煮食炉、墙、抽油烟机),这些工作必需於5:30pm前完成。"

Most kindergartener had the obvious job burnout symptom more or less, but the degree not extremely serious; 2.in the tired meter three dimensions, the emotional dries up the dimension to score points high, has the obvious symptom the population also most, next is the low achievement feeling, goes to the individuality population and the score is all lowest; 3.different rank, the disparity in age, the different teaching sonority, the different marital status kindergartner dries up in the dimension in the emotion to have the remarkable difference; 4.cartel 16 center personalities factors E, F, L, the O four factors tiredly have the remarkable influence to the kindergartener occupation; 5. Four secondary personalities factors tired all have the remarkable influence to the kindergartener occupation; 6. Kindergartener's emotion dries up differently because of the emotional intelligence total score displays the remarkable difference, the emotion dries up the degree to increase along with the emotional intelligence score drops.

调查结果表明:1、大部分幼儿教师已出现明显的职业倦怠症状,但程度并不十分严重;2、在倦怠的三个维度上,情绪枯竭维度的得分最高,出现明显症状的人数也最多,其次是低成就感,去个性化的人数和分数都最低;3、不同级别、不同年龄、不同教龄、不同婚姻状况幼儿教师在情感枯竭维度上存在着显著差异;4、卡特尔16种人格因素中的E、F、L、O四个因素对幼儿教师的职业倦怠有着显著的影响;5、四个次级人格因素对幼儿教师的职业倦怠都有着显著的影响;6、幼儿教师的情感枯竭因情绪智力的总分不同而表现出显著差异,情感枯竭程度随情绪智力分数增加而下降。

My baby is 5 months has not yet stand up, I also urgent, but he was 2 months when I will be when he climbed in bed, he doubled over, I do not know this has to stand up be counted, and in any case to has now been five months he has not second breakthrough, after careful observation of my husband after the baby should be like the waist is too thick, because he could have 90 degrees sideways, but did not turn over, you also have his really no way, and my friends baby 5 months when the 16 kg, has been in bed of rolling, so I think it was and build a significant relationship.

我家宝宝也是5个月还没有翻身,我也很急,不过他在2个月的时候我将他爬在床上时,他到是翻了过来,不知道这样算不算已经翻身了,反正到现在已经5个月了他还没有第二次突破,后来经过我先生的仔细观察后想宝宝应该是腰太粗,因为他早就可以90度侧身了,但是就是不翻过来,你还拿他真的没有办法,而我朋友的宝宝5个月时16斤,在床上已经滚来滚去的了,所以我想应该是和身形有相当大的关系。

The Levy style Cable Dome model is made up of 〓5 tension piano-wires and 〓32×1 5 compressive steel pipes, distance between nodes and the tension force of cables is adjusted by screw up and down the turnbuckle The procedure of shaping up included four ways, and the loading included fully loaded and half loaded, to validate the influence of unconservative property, the author carried through the slack procedure and the unload procedure.

该Levy型索穹顶模型,以受拉的〓5高强钢丝和〓32×1.5受压钢管构成,节点间拉索的长度以及拉索的预拉力通过拧紧或放松花篮螺丝来调节。试验内容包括成形试验和承载力试验,成形试验尝试了四种不同的成形方法,为了考察结构非保守性的影响,每种成形方法成形后,还逆序进行了结构的松弛试验,荷载态试验包括均布荷载满载(即在所有压杆上部节点施加集中荷载)和半载(在结构1/2的压杆上部节点施加集中荷载)的加载和卸载时结构工作性能的测试。

Except 58 cases missed and 5 cases induced abortion, we followed up 163 cases(241 kidneys) in different gestational age and postnatal period. Among them, 209 kidneys (86.72%) were discovered pyelectasis between 5mm to l0mm. The pyelectasis of 30 kidneys(12.45%) was between l0mm to l5mm, and that of 2 kidneys(0.83%) was thicker than 15mm. Follow-up result is as follow: 137 cases(214 kidneys) were recovered in normal in fetus period or postnatal 15 months. Their pyelectasis was thinner than 5mm(88.80%). Among them, 16 cases(2l kidneys) were recovered in fetus period(8.71%). 121 cases(193 kidneys) were recovered in postnatal 15 months(80.09%). The rest 20 kidneys' pyelectasis was between 5mm to l0mm(8.30%). 4 kidneys' pyelectatis was between 10mm to l5mm(1.66%), and 3 kidneys' pyelectasis was thicker than l5mm(1.24%).

结果:发现一侧或双侧肾盂扩张≥5mm的胎儿有226例,除58例失访,5例引产外,对163例241只肾脏在不同孕龄及出生后的孩子进行了随访。241只肾脏按肾盂扩张在5~10mm间2的只(占86.72%),在10~15mm间30只(占12.45%),≥15mm者2只(占0.83%)分组观察,随访结局如下:137例214只肾盂在胎儿期或孩子出生后15个月内恢复正常,肾盂扩张<5mm(占88.80%):其中16例21只肾盂在胎儿期恢复至5mm以下(占8.71%),121例193只肾盂在孩子出生后15个月内恢复至5mm以下(占80.09)。20只肾盂扩张在5~10mm间(占8.30%)。4只肾盂扩张在10~15mm间(占1.66%)。3只肾盂扩张≥15mm(占1.24%)。

The advantage of Servicemix: 1, be based on JBI standard; 2, can heat up deploy; 3, supportive Camel (can develop compositive technological process with DSL); The defect of Servicemix: 1, JBI standard was brought use those who go up is trival, and JBI standard did not gain too much favour, the future was not predicted; 2, depend on the configuration of XML too much; 3, because all messages want to undertake standardizing handling, be generated namely and analytic XML file, can bring about function to drop so; 4, frame of implementation of the need in developing a process is specific interface is received and handle afore-mentioned standard informations, invade a gender strong; 5, documentation is not quite diseased, clear; The advantage of Mule: 1, the framework is simple clarity, easy begin; 2, it has very extensive transmission implement, road by implement with converter, and expand easily; 3, mule does not need to change the word into unified format, and have transition when need only, improved performance; 4, mule code need not pay close attention to in developing a process, need to pass configuration to be able to expose the service only, decreased to invade a gender; 5, documentation is clear and perfect; The defect of Mule: 1, did not implement any ESB standards but abided by " Enterprise Intergration Patterns " with SEDA?

Servicemix的优点: 1,基于JBI规范; 2,可以热部署; 3,支持Camel(可以用DSL去开发集成流程); Servicemix的缺点: 1,JBI规范带来了使用上的繁琐,且JBI规范没有得到太多的青睐,前途未卜; 2,过多依赖XML的配置; 3,由于所有消息要进行标准化处理,即生成和解析XML文件,所以会导致性能下降; 4,开发过程中需要实现框架特定接口接收和处理上述标准消息,侵入性强; 5,文档不健全、不够清晰; Mule的优点: 1,架构简单清晰、容易上手; 2,它有非常广泛的传输器、路由器和转换器,且易于扩展; 3,Mule不需将消息转换成统一的格式,而只在需要时进行转换,提高了性能; 4,开发过程中无需关注Mule代码,只需通过配置即可将服务暴露,减少了侵入性; 5,文档清晰而完善; Mule的缺点: 1,没有实现任何ESB规范(但遵循了《Enterprise Intergration Patterns》与 SEDA?

I examed one of the pen closely and it looked certainly genuie.at the base of the gold cap,the words of 'made in america' was neatly inscribed.the man said that the pen was worth 50 pounds, but as a special favor he would like me have it for 3o pounds, i shaked my head and held up my five fingers indicating that i was willing to pay 5 pounds.gesticulating widely it is as if my offer outrageous,but he eventually ruduced the price to 10 pounds.shrugging my shoulds,i began to walk away .when a moment later,he run after me and thrusted the pen into my hands.though he kept throwing up his arms in despair, he readily accepted the price i gave him.i felt especially pleased with my wonderful bargarn until i got back in the ship.

我仔细察看了一枝钢笔,那看上去确实不假,金笔帽下方整齐地刻有&美国制造&字样。那人说那支笔值50英镑,作为特别优惠,他愿意让我出30英镑成交。我摇摇头,伸出5根手指表示我只愿出5镑钱。那人激动地打着手势,仿佛我的出价使他不能容忍。但他终于把价钱降到了10英镑。我耸耸肩膀掉头走开了。一会儿,他突然从后追了上来,把笔塞到我手里。虽然他绝望地举起双手,但他毫不迟疑地收下了我付给他的5镑钱。在回到船上之前,我一直为我的绝妙的讨价还价而洋洋得意。

The project area has three shopping malls in a row not to fight the fire area, with a total length of the circumference of more than 1 / 3, Road fire engines from the inside edge of the wing wall construction materials to highlight the edge of not less than 5.00m, and fire engines to meet the Road Fire The largest car turning radius of 12m, to fight the fire site with a width of 18m, and this is not tall tree planting; and fire fighting facilities of not more than 5% of the slope, fire engines, fire fighting facilities should be able to carry a large set of fire engines Weight; Combined air-conditioning unit: for department stores, supermarkets, large bays, such as the lobby room, a new unit set up wind, ventilation and air return, setting up a new, back to the wind and the proportion of exhaust valve, according to the outdoor temperature of the new regulation, the ratio of air return, Back to the water main unit based PI control valve and in accordance with return air-conditioning temperature valve opening.

本项目商场三个面设有不连续消防扑救面,总长度大于周长的1/3,消防车道内边路缘距建筑外墙突出物边缘不小于5.00m,且消防车道满足消防车最大12m 的转弯半径,消防扑救场地的宽度为18m,且此范围内没有种植高大乔木;此外消防扑救场地的坡度不大于5%,消防车道、消防扑救场地应能承载大型消防车的载重量;组合式空调机组:用于百货商场、超市、大厅等大开间房间,机组设新风、回风及排风,设新、回风及排风比例调节阀,根据室外温度调节新、回风比例,机组回水管设比例积分调节阀并根据回风温度调节水阀开度。

"If Mum already get up, finish the following household duties or or before 5:30pm according to the timetable 1. clean up the toilet bath tub, sink, toilet bowl, mirror… ect; 2. kitchen (clean up cupboard, stove, wall, ventilation fan… ect"

&11:00-5:30pm &,&开始做家务:若太太已经起床,然后根据时间表打扫 1 清洁及整理厕所(浴缸、洗面盆、马桶、镜) 2厨房(橱柜、煮食炉、墙、抽油烟机),这些工作必需於5:30pm前完成。&

The main research contents are as follows:1. Through massive calculation, analysis and comparison, sum up the similarities and differences between the special-shaped cross sections and rectangular cross sections in mechanical features, between reinforced concrete special-shaped columns and rectangular columns in load-bearing capacity, ductility performance and provide necessary basic concepts and data for further understanding the characteristics of the special-shaped columns;2. Through massive elastic calculations and elasto-plastic analysis, under the preconditions of satisfying the code's requirements for axial compression ratio, limit value of lateral displacement and load-bearing capacity of normal section,oblique section and beam-column joint, under circumstances of different intensity of earthquake, structure dead weight, sort of site and column grid bay dimension, the variation regularity of maximum suitable height of structure, and thus sum up the maximum suitable height of structure for code for the purpose of macro-control while deciding the design scheme;3. Make a preliminary study on the stress feature of reinforced concrete special-shaped column and Z-shaped column of which the ratio of limb length to limb thickness is between 4~5 ,and the preliminary design method is suggested;4. Through elato-plastic time history dynamic analysis of typical projects, check up the weak storey of the special-shaped column structure and yielding, breaking and collapse mechanism to satisfy the earthquake resistant requirement to buildings of remaining stand under strong earthquake;5. Derive for project use simplified calculation formula of vibration period, suitable vibration period, suitable rigidity of special-shaped column structure through theoretical analysis, and provide an easy and practical method for deciding the structure scheme economically, safely and reasonably;6. Based on the study achievements in theory and massive analysis and calculations of this paper, sum up the regularities of inner force, deformation of special-shaped column structure and seismic conceptual design, and thus the suggection of seismic design of special-shaped column structures is presented.

本文研究的主要内容如下:通过大量的计算、分析和对比,总结出异形截面与矩形截面在力学特性、钢筋混凝土异形截面柱与矩形截面柱在承载能力、延性性能等方面的异同,为深入了解异形截面柱的特点提供必要的基本概念和数据;通过大量的弹性及弹塑性计算分析,在满足规程对轴压比、侧移限值及正截面、斜截面、节点承载力抗震验算要求的前提下,在不同抗震设防烈度、结构自重、场地类别及柱网开间尺寸情况下最大适宜高度的变化规律,并在此基础上总结归纳出异形柱结构的最大适用高度规定,可用于规程,以便于在确定方案时起到宏观控制的作用;对肢长与肢厚比在4~5的钢筋混凝土异形截面柱及Z形柱的受力特点进行初步探讨,提出初步的设计方法;通过对典型工程的弹塑性动力时程分析,检验异形柱结构的薄弱层及屈服、破坏、倒塌机制,以达到建筑物大震不倒的抗震设防要求;通过理论分析,推导出异形柱结构自振周期,以及适宜自振周期、适宜刚度的工程实用简化计算公式,为经济、安全、合理地确定结构方案提供简便实用的方法;在本文理论分析、计算以及大量的研究成果基础上,总结归纳出异形柱结构内力、变形的规律及抗震概念设计内容,并在此基础上提出异形柱结构的抗震设计建议。

第71/100页 首页 < ... 67 68 69 70 71 72 73 74 75 ... > 尾页
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?