英语人>网络例句>underground 相关的网络例句
underground相关的网络例句

查询词典 underground

与 underground 相关的网络例句 [注:此内容来源于网络,仅供参考]

This dissertation discusses four problems that have relations with these topics. These problems are, i seismic moment tensor representation for explosions in ellipsoidal cavities and their seismic radiation patterns in the farfield; ii seismic waves from point sources in transversely isotropic media; iii yield-estimation by mb or mb for Chinese underground nuclear explosions and, iv simultaneously inversion for source parameters of underground nuclear explosions and parameters of apparent Lg Q for paths from source to stations.

本文讨论与此课题有关的椭球腔中的爆炸的地震矩张量表示及地震波辐射图案,各向异性介质中的点源激发的弹性波,由Lg波震级或Lg尾波震级估算地下核爆炸当量,由Lg波位移谱反演地下核爆炸震源参数及相关路径的Lg波视衰减参数等四个方面的问题。

Because I thought that the French were simply megalomaniacs and this whole project would probably never happen, and because I was surrounded by this rope of expectant experts, I decided to bluff and said, we know exactly how to resolve this problem: where the two lane TGV railway widens to six, we will run the highway parallel to the station. We will also run it underground, and in between, we will create the largest parking lot in the history of Christendom--8, 000 places, and in this way, an unbelievable metropolitan concentrate of infrastructure. We used this underground literally as the basis for our project.

因为我以为法国人仅仅是夸夸其谈,整个项目根本不可能实现,也因为我背负着一桌子专家的殷切期待,我决定直率地陈述我们的观点,我们确实知道如何解决这个问题:在两条TGV轨道扩大到6条的地方,高速公路会平行于火车站,并被埋入地下,然后修建一个8000位的停车场,这将是基督教世界历史上最大的停车场,通过这种方法我们能够创造一个集中了巨大地下基础结构的大都会。

In order to investigate the distribution of underground thermal water of the hot spring, we used the direct current prospecting to determine the fracture belt bearing underground thermal water with the near source field electric profiling.

从而确定了开发地下热水的钻孔位置,为当地政府开发利用地热能提供了必要的资料。

Excavations as well as utilization of urban underground space put forward a higher demand for tunnel and underground engineering in quantity, quality and technology, along with the development of economy, science and technology.

21世纪是地下空间的世纪,随着科学技术和经济的发展,交通、水利、水电、采掘和城市地下空间的利用等对隧道和地下工程的数量、质量和难度上提出了更高的要求。

Underground water can flow very large distances and can be kept in underground reservoirs for a very long time.

地下水可流很大范围,可以保存在地下蓄水库很长时间。

Expounds the methods that establishes computational table of wirework of theodolite in underground by using EXCEL spreadsheet and the results of usage of underground survey in the coal mine there is certain certain value of popularization .

阐述了利用EXCEL电子表格创建井下经纬仪导线计算表的方法及在矿山井下测量中的使用效果,有一定的推广价值。

Underground powerhouse is a large underground structure group with some anfractuous structures in space.

在我国修建水电工程,常会遇到地下厂房的设计问题。

Combined with Laohugou tunnel project and according to the different underground water yielding,it builds the different sealing batholite ,finishes the water stopping by using purdah injecting,and stops the leakage of the underground water,and this supplies theoretical reference and practical experiences to further extend the technique.

结合老虎沟隧道工程,根据不同的地下出水情况,成功地建造了不同的止浆岩盘,运用帷幕注浆完成了隧道的堵水工作,制止了地下水的流失,为进一步推广这一技术提供了理论参考和实践经验。

By and large, research projects undertaken by the Group fall into three categories. The first is geotechnical properties and prevention of geological hazards, with the stress on researches on dynamic properties of marine soil, coast-beach erosion and seabed failure, sediment reformation by benthonic fauna, failure of submarine pipelines, environmental geotechnical techniques, etc. The second is research on pollution and treatment of water and soil, with the stress on researches on ecological effects of exploitation activities in the marine environment, treatment of beach sediment pollution, treatment techniques of sea organism pollution, groundwater PRB treatment technique development, etc. The third is exploration of underground environment and geophysical data processing techniques, with the stress on devising equipment for detecting underground pollution and geological hazards, environmental GIS (Geographical Information System) and related analysis software, etc.

学术团队开展的研究课题大体上分三类:第一类课题是岩土体性质与灾害防治,侧重于海洋土动力特征研究,岸滩侵蚀与海床破坏研究,海洋底栖生物对沉积物改造研究,海底管线失稳研究,环境岩土工程技术研究等;第二类课题是水土污染过程与治理研究,侧重于海洋开发活动的生态环境效应研究,海滩沉积物污染治理研究,海水生物污染治理技术研究,地下水PRB治理技术开发等;第三类课题是地下环境探测技术与软件开发研究,侧重于地下环境污染与灾害探测设备的研制,环境地理信息系统,专业性应用软件的开发等。

This drill rig is suitable to drill blasthole,anchor-cable hole and grouting hole with φ85-φ125mm diameters,0-50m depths and any dip angle of 00-3600 in various rock formations in underground mines,open pit mines,water conservancy projects and other engineering such as hydroelectric,building,harbour,airport,road construction and consolidation of slope etc..especially suitable for the operation in narrow underground space.

其导轨架较为短小,占地空间小,适用于矿山井下和露天、建筑、水利水电、港湾、机场、道路施工及边坡加固等工程,尤其适合井下狭窄场地作业。可在各类岩层中钻凿φ85-φ125mm、深度0-50米,钻孔倾角00-3600任意角度的炮孔、锚索孔和灌浆孔。

第6/202页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Underground
Real Underground Baby
Going Underground
6 Feet Underground
Deeper Underground
Keep It Underground
Underground Rapstar
What I Represent
Underground
Underground Psycho
推荐网络例句

But this is impossible, as long as it is engaging in a market economy, there are risks in any operation.

但是,这是不可能的,只要是搞市场经济,是有风险的任何行动。

We're on the same wavelength.

我们是同道中人。

The temperature is usually between 300 and 675 degrees Celsius.

温度通常在摄氏300度到675度之间。