查询词典 underground storeroom
- 与 underground storeroom 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
There are many buildings that were slanted and broken down because of the underground water's buoyance pressure in the sea cities such as Shenzhen, Dalian and Qingdao, where there are plenty of water in the underground.
在地下土层含水丰富的沿海城市如深圳、大连以及青岛等,由地下水水浮力所造成的建筑物、构筑物等上部结构发生倾斜、倒塌的事故屡屡出现,使得抗浮问题日益突出。
-
There are many buildings that were slanted and broken down because of the underground waters buoyance pressure in the sea cities such as Shenzhen, Dalian and Qingdao, where there are plenty of water in the underground.
在地下土层含水丰富的沿海城市如深圳、大连以及青岛等,由地下水水浮力所造成的建筑物、构筑物等上部结构发生倾斜、倒塌的事故屡屡出现,使得地下室抗浮问题显得日益突出。
-
Shrubs or trees, deciduous or evergreen, often from underground woody burl or producing thickened horizontal underground rhizomes.
灌木或乔木,落叶或常绿,通常生于地下木质瘤或产加厚的水平的地下根状茎。
-
Based on hydrogeology in Shenyang area, this essay has made study on exploring underground reservoir in rain season besides making full use of river runoff, taking surface water back to underground, and establishing canal surface water and groundwater united exploring mathematics model, working out canal and well optimal plan.
依据沈阳地区水文地质条件,论文提出在适时充分利用外河区间径流的条件下,探求利用地下库容调蓄汛期雨洪,将地表余水引进回灌地下,并建立了渠灌区地表水、地下水联合运用数学模型,推求出渠井联合运用比较方案。
-
The Underground carbarn project take an area of 2000㎡,5 meter deep, the top of the underground consists of 800㎜ kind of soil.
该工程位于天津海河水利委员会院内,地下车库建筑面积2000㎡,深约5m,车库顶为800㎜种植土。
-
The actual number of samples taken was 41 in development, 17 in the mining team, 10 in underground maintenance, 2 in underground transport, 10 in the washing plant, 10 in ash and cinders, 6 in boiler and turbine, and one in each of administration and electricity.
拿取的样品的实际数量是41在开发中, 17在采矿队, 10在地下维护, 2在地下运输, 10在洗涤的植物中, 10在灰和炭渣, 6在锅炉和涡轮和一个在其中每一管理和电。
-
Underground commercial building is the developing trend of our underground space, and it is the best way of settling the city's confliction.
地下商业建筑是我国未来地下空间发展的趋势,是解决城市矛盾的最佳途径。
-
As to the large and complex underground caves, the stability problem of wall rock during the process of underground cave's excavating is connected with the constructible cost and management benefit of the whole power station project.
大型复杂地下洞室在开挖过程中的围岩稳定问题关系到整个水电站工程的建设成本和运营效益,是一个值得深入研究的问题。
-
The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme
主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。
-
The stability of underground tunnel is very important in the design and excavation of underground engineering.
地下洞室稳定性是地下工程设计和施工中遇到的主要问题之一,也是岩石力学研究的重要课题。
- 相关中文对照歌词
- Underground
- Real Underground Baby
- Going Underground
- 6 Feet Underground
- Deeper Underground
- Keep It Underground
- Underground Rapstar
- What I Represent
- Underground
- Underground Psycho
- 推荐网络例句
-
But this is impossible, as long as it is engaging in a market economy, there are risks in any operation.
但是,这是不可能的,只要是搞市场经济,是有风险的任何行动。
-
We're on the same wavelength.
我们是同道中人。
-
The temperature is usually between 300 and 675 degrees Celsius.
温度通常在摄氏300度到675度之间。