英语人>网络例句>under 相关的网络例句
under相关的网络例句

查询词典 under

与 under 相关的网络例句 [注:此内容来源于网络,仅供参考]

To court trailer court trailer park trailer camp 202-cover be covered with blow one's cover break cover draw a cover from cover to cover provide cover for read from cover to cover remain cover take cover under cover under plain cover under the cover of under separate cover under the same cover cover against cover in cover into cover over cover up n.

因隐蔽之地或身分被发现而无藏身之地由隐藏处跳出把由树丛中赶出从头到尾一页不漏给。。。打掩护从头看到底,一页不漏地读完仍戴着帽藏身,躲避,避难在遮蔽处;附在信中;秘密地,暗中没有注明寄发人姓名,地址及内容;用没有注明商号,装有何物的封袋邮寄在。。。

In this paper,Laterite soil adjacent to some stake of the highway in Chenzhou, Hunan section from Xiamen to Chengdu was used to investigate the deformation characteristics and protection methods of the Laterite soil subgrade under the influence of environment factors.Properties like water-holding capacity,capillary rise, coupled heat-moisture transfer and wetting deformation of samples under different compactness were studied through a series of laboratory tests.In addition,by using meteorological data of two consecutive years in Chenzhou,coupled process of moisture transfer and subgrade deformation was stimulated under the impacts of groundwater and the atmosphere.Specific work done in this paper is as follows:(1) Samples under different compactness were subjected to a series of conventional laboratory tests,such as permeability,consolidation,contraction,shear test and etc.

论文以厦门至成都高速公路湖南郴州段的红粘土为研究对象,以环境因素作用下红粘土路基的变形特征与防护方法为研究目的,通过室内试验研究了不同压实度红粘土的持水性能、毛细上升、湿热耦合迁移及湿化变形等特征,借助郴州地区连续两年的气象数据,模拟在地下水和大气的共同作用下路基内部红粘土水分迁移与路基变形的耦合过程,主要研究内容及结论如下:(1)针对不同压实度的红粘土,系统开展了其渗透、固结、收缩、剪切等试验研究。

The notable proliferation was not observed by eyes in the local of injection. The infiltration of inflammation cells and mild proliferation of fibrocyte around dura mater was observed by HE stained in 4 and 8 weeks after injection. Infiltration and exudation of inflammation cells was observed by HE stained in epidural nerve root. Compared with group A, no changes of group B, C and D were observed under specific stained. Proliferation of type Ⅱ collagen fibers around dura mater was seen under immunohistochemical stained in 4 and 8 weeks after injection. There is no significant demyelination changes under LFB stained. The thickness and shape of the myelin sheath in epidural nerve root was not regular under transmission electronic microscopy in 4 and 8 weeks after injection. Fibroblast was also seen there. In nerve endometrium, macrophage could be seen under TEM, myelinated nerve fiber changed significantly, but nonmyelinated nerve fiber changed mildly. When 8 weeks, the changes of group D is smaller than the group B and C.

给药局部肉眼观察未见明显的纤维组织增生;HE染色可见B、C、D三组给药后四周及八周时硬膜内外均有炎细胞浸润,纤维细胞轻度增生,硬膜外神经根内有炎细胞浸润及炎性渗出;特殊染色B、C、D三组同A组相比未见有脊髓及神经根的改变;免疫组化染色,给药后四周及八周时,硬膜内外均有Ⅱ型胶原纤维增生;固兰染色B、C、D三组未见有明显脱髓鞘改变,与A组相比无明显异常改变;电镜观察B、C、D三组在给药后的四周及八周时,表现为硬膜外神经根内髓鞘厚薄不一,形状不规则,可见成纤维细胞,神经内膜中可见有巨噬细胞;粗大的有髓神经纤维变化明显,无髓神经纤维受累较轻;八周时电镜下D组改变较B、C两组为轻。

First, this article introduced 2 grade of rotary kiln principle of work and the equipment, to rolled the circle mechanics behavior to carry on the analysis, proposed - rolled the circle - under roller's rotary kiln overall modelling based on the tube body - kiln liner - big tooth ring, to rolled the circle - under roller's contact stress to carry on the finite element analysis the method, and obtained rolled the circle contact stress the size and the distribution rule, finally indicated that rolled the circle contact stress mainly to have two main peak values and the sudden change in one week, appeared is rolling the circle and the under roller contact area; Then, rolls the circle the stress to regard as is the principal stress unknown plane stress test, the use quite mature modern test technology, proposed rolls the circle stress test the principle and the plan, and to rolled the circle the stress to carry on the scene test, the stress which the scene test analysis result and the finite element analysis calculated has compared, had proven the whole method modelling's finite element analysis method's rationality and rolled the circle - under roller contact stress the result accuracy; Finally, uses ANSYS APDL the re-development technology, in view of 2 grades of rotary kilns, rolled the circle - under roller contact stress the overall finite element analytic method to carry on the re-development.

首先,本文介绍了2档回转窑工作原理和装置,对滚圈的力学行为进行了分析,提出了基于筒体-窑衬-大齿圈-滚圈-托轮的回转窑整体建模,对滚圈-托轮的接触应力进行有限元分析的方法,并得到了滚圈接触应力的大小和分布规律,结果表明滚圈接触应力在一周内主要存在两个主要的峰值和突变,都出现在滚圈与托轮接触区域;然后,把滚圈的受力看成是主应力未知的平面应力的测试,利用比较成熟的现代测试技术,提出了滚圈应力测试的原理和方案,并对滚圈的应力进行了现场测试,现场测试分析结果与有限元分析计算出的应力相比较,证明了整体法建模的有限元分析方法的合理性和滚圈-托轮接触应力的结果的正确性;最后,利用ANSYS的APDL的二次开发技术,针对2档回转窑,就滚圈-托轮接触应力的整体有限元分析法进行了二次开发。

First of all, the paper carried out test study on four two-spanned model members of FSMRCWB, including three 1/2-scaled two-storeyed models and one 1/3-scaled three-storeyed model. The paper analyzed the test results, including analysis on mechanical property of the composite wall beam under vertical loads, and failure mode, deformation capacity, aseismic performance under horizontal loads and constant vertical loads. Secondly, the nonlinear property of concrete is studed and the nonlinear models of FSMRCSS is builded by ANSYS. Last, The paper studies the result of ANSYS, which mainly includes the loading-displace curve of FSMRCSS under horizontal loads and constant vertical loads, the mechanics of arch under vertical loads lonely and under horizontal loads and constant vertical loads respectively, and status of the distribution and changing of vertical stress and cross shear on the surface of the suporting beam, and the influence of span ratio and hole.All in all, the caculating results are in good agreement with the test results.

本文首先进行了三个1/2比例的两跨两层和一个1/3比例的两跨三层的框支密肋复合墙梁的模型试验,分析了框支密肋复合墙梁在竖向荷载作用下的受力性能,以及在竖向荷载与水平低周反复荷载共同作用下的受力性能、变形性能、滞回性能、耗能系数及破坏形态;其次,研究了混凝土的非线性特性,建立了框支密肋复合墙梁非线性有限元模型,并借助大型通用有限元软件ANSYS进行计算;再则,进行了非线性有限元结果分析,主要研究框支密肋复合墙梁在竖向荷载与水平地震力共同作用下的荷载位移曲线,分析在竖向荷载单独作用下和在竖向荷载与水平地震力共同作用下墙梁的拱作用,托梁顶面的竖向应力和横向剪应力分布及变化情况,并讨论跨度比、洞口对墙梁拱作用和托梁顶面的竖向应力的影响。

The motor is provided with a thermal motor protector (a protective device that is sensitive to both temperature and current) that prevents the temperature of the motor windings from becoming more than 125°(257°) under the maximum load C F under which the motor runs without causing the protector to cycle, and from becoming more than 150°(302° with the rotor of the motor locked; or C F) 4 The motor complies with the requirements for impedance-protected motors; b Under wiring, unless the wiring complies with the VW-1 (Vertical-Specimen) Flame Test in the Reference Standard for Electrical Wires, Cables, and Flexible Cords, UL 1581; c Under an unenclosed switch, transformer, relay, solenoid, and the like, unless it 7 舞台灯标准 can be shown that malfunction of the component does not result in a fire; or d Under field- and factory-made splices and overload and overcurrent protection devices.

F C F 4 发动机符合阻抗保护发动机的要求; b 配线,除非电线符合VW-1及参考UL 1581标准的有关电线,电缆及线芯灵活性的焰火测试。 c 未封装的开关,变呀器,继电器,螺线管及与其相似的,除非它可显示元件的故障不会引起火灾。 d 在户外和生产工厂接合过载和过流保护装置。

Postoperative contrast sensitivity testing showed statistically significant differences (P<0.05)between the two IOLs at 12 and 18 cpd under photopic, at 1.5and 3 cpd under mesopic, and at 1.5 and 3 cpd under mesopic with glare conditions.· CONCLUSION: The Tecnis Z9000 IOL proved to have statistically significant superior contrast sensitivity to the 911AIOL at high spatial frequencies under photopic conditions and at low spatial frequencies under mesopic and mesopic with glare conditions.

术后对比敏感度分析发现两组在12和18 cpd、1.5和3 cpd以及1.5和3 cpd均有统计学差异(P<0.05)结论:Tecnis Z9000 I0L被证明其对比敏感度在明视高空间频率和暮视低空间频率方面均显著优于911A IOL。

To court trailer court trailer park trailer camp 202-cover be covered with blow one's cover break cover draw a cover from cover to cover provide cover for read from cover to cover remain cover take cover under cover under plain cover under the cover of under separate cover under the same cover cover against cover in cover into cover over cover up n.

名誉, 使名誉受坏影响;驳倒,问住;不让发言,使无法应付;不顾,蔑视做出让人蔑视的事在法庭外和解提出诉讼对某人起诉,控告活动住屋集中地活动住屋集中地活动住屋集中地 n。盖子,封面,藉口 vt。覆盖,铺,掩饰,保护,掩护,包括,包含,适用

White snow tower' under 16h light/d flowered 13d earlier and ended 13d later than that under nature light,'White snow tower' under 14h light/d flowered 20d later and ended 14d later than CK;'White-red peony' under 12h light/d flowered 1d earlier and ended 10d later than CK,'White-red peony' under 14h light/d flowered 1d later and ended 10d later than CK, the blooming date of plants under 16h light/d was the same as CK, but ended 31d later than CK.

在花期方面,&白雪塔&在16小时的光照条件下可提前13天开花、而末花期推迟13天,14小时的光照处理推迟20天开花,末花期推迟14天;&花牡丹&12小时处理下开花时间只比CK提前一天,14小时处理推迟一天,16小时处理与CK同天开放,不过各长日照处理末花期都不同程度延后,16小时、14小时、12小时光照处理的末花期分别比CK晚了31天、10天、10天。

Time Charter Hire or Charter Hire for Series of Voyages A sum not exceeding 50% of the gross hire which is to be earned under the charter in a period not exceeding 18 months Any sum insured under 2012 to be taken into account and only the excess thereof may be insured, which excess shall be reduced as the hire is advanced or earned under the charter by 50% of the gross amount so advanced or earned but the sum insured need not be reduced while the total of the sums insured under 2012 and 2015 does not exceed 50% of the gross hire still to be earned under the charter An insurance under this Section may begin on the signing of the charter

2015期租租金或连续航次租金:其金额不得超过租船合同项下在18个月以内可收取的总租金的50%。根据第2012项的投保金额应予考虑,仅其超额部分可以保险,而且应从中扣除根据租船合同已预收或已赚取的总租金的50%,但如果根据第2012项及第2015项的总保险金额不超过根据租船合同待收总租金的50%时,可不作上述扣减。根据本项的保险可以自签订租船合同时开始。

第4/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
House Under The Ground
Six Feet Under
Under The Boardwalk
Under Attack
Under The Influence
Top Dawg Under Dawg
World Down Under
Brothers Under The Sun
Under My Skin
Under My Skin
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。