查询词典 under the order of
- 与 under the order of 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Where two or more policies are effected by or on behalf of the assured on the same adventure and interest or any part thereof, and the sums insured exceed the indemnity allowed by this Act, the assured is said to be over-insured by double insurance (2) Where the assured is over-insured by double insurance The assured, unless the policy otherwise provides, may claim payment from the insurers in such order as he may think fit, provided that he is not entitled to receive any sum in excess of the indemnity allowed by this Act; Where the policy under which the assured claims is a valued policy, the assured must give credit as against the valuation for any sum received by him under any other policy without regard to the actual value of the subject-matter insured; Where the policy under which the assured claims is an unvalued policy he must give credit, as against the full insurable value, for any sum received by him under any other policy; Where the assured receives any sum in excess of the indemnity allowed by this Act, he is deemed to hold such sum in trust for the insurers according to their right of contribution among themselves.
当被保险人或其代表,(1)就同一冒险和利益或其中的一部分订立了两份以上的保险单,且保险金额超过本法所允许的赔偿限额时,被保险人即被视为因重复保险而超额保险。(2)在被保险人因重复保险而超额保险之场合:除非保险单另有规定,被保险人可根据自已认为合适的顺序,依次向其保险人索赔,但他所得金额不得超过本法允许的赔偿限额;如果被保险人凭以索赔的保险单是一份定值保险单,被保险人必须将其他保险单项下他已收取的任何数额从约定保险价值中扣除,无需考虑保险标的的实际价值;如果被保险人据以索赔的保险单是一份不定值保险单,被保险人必须将其他保险单项下他已收取的数额从全部保险价值中扣除;若被保险人得到的金额超过本法所允许的赔偿额,则此种超出金额即被视为由被保险人代各保险人托管,由保险人按他们之间的分摊权利摊回。
-
Where two or more policies are effected by or on behalf o f the assured on the same adventure and interest or any part thereof, and the sums insured exceed the indemnity allowed by this Act, the assured is said to be over-ins ured by double insurance (2)Where the assured is over-insured by double insurance The assured, unless the policy otherwise provides, may claim payment from the insurers in such order as he may think fit, provided that he is n ot entitled to receive any sum in excess of the indemnity allowed by this Act;Where the policy under which the assured claims is a valued policy, the assured must give credit as against the valuation for any sum rec eived by him under any other policy without regard to the actual value of the subject-ma tter insured;Where the policy under which the assured claims is an unvalu ed policy he must give credit, as against the full insurable value, for any sum rec eived by him under any other policy; Where the assured receives any sum in excess of the indemnit y allowed by this Act, he is deemed to hold such sum in trust for the insurers acco rding to their right of contribution among themselves.
1当被保险人或其代表,就同一冒险和利益或其中的一部分订立了两 32。份以上的保险单,且保险金额超过本法所允许的赔偿限额时,被保险人即被视为因重复保险而超额保险。(2)在被保险人因重复保险而超额保险之场合:除非保险单另有规定,被保险人可根据自己认为合适的顺序,依次向其保险人索赔,但他所得金额不得超过本法允许的赔偿限额;如果被保险人凭以索赔的保险单是一份定值保险单,被保险人必须将其他保险单项下他已收取的任何数额从约定保险价值中扣除,无需考虑保险标的的实际价值;如果被保险人据以索赔的保险单是一份不定值保险单,被保险人必须将其他保险单项下他已收取的数额从全部保险价值中扣除;若被保险人得到的金额超过本法所允许的赔偿额,则此种超出金额即被视为由被保险人代各保险人托管,由保险人按他们之间的分摊权利摊回。
-
How to ensure this new structure to be in elastic state under frequent earthqu ake, be mendable under design earthquake and not collapse under infrequent earthquake, especially the last item, is the problem to be solved imminently in engineering field. Center around this problem, 5 aspects of investigation are carried out as following:(1) The experiment of seismic performance of ASCCs in this new frame structure has not been reported, in order to study this problem, 9 ASCC specimens with shear steel plate are tested subjected to the horizontal low cyclic loading, in which, the shear span ratio is 3 and axial compression ratio is different. The hysteretic curves of 9 specimens are obtained. The seismic performance indexes such as energy dissipation, stiffness degradation, strength degradation, skeleton curves and ductility of this kind of column are acquired, and the seismic fortification measures including ultimate values of axial compression ratio under different seismic degree are suggested.
1新型框架结构中所采用的角钢混凝土柱抗震性能的试验研究尚未见报道,针对这一问题,本文进行了9根剪跨比为3、不同轴压比、采用钢板箍的角钢混凝土柱在水平低周反复荷载作用下的试验研究,获得了9根试验柱的滞回曲线,考察了该类柱的耗能、刚度退化、抗力衰减、骨架曲线及延性等抗震性能指标,建议了角钢混凝土柱在不同抗震等级下的轴压比限值等抗震构造措施。
-
To court trailer court trailer park trailer camp 202-cover be covered with blow one's cover break cover draw a cover from cover to cover provide cover for read from cover to cover remain cover take cover under cover under plain cover under the cover of under separate cover under the same cover cover against cover in cover into cover over cover up n.
因隐蔽之地或身分被发现而无藏身之地由隐藏处跳出把由树丛中赶出从头到尾一页不漏给。。。打掩护从头看到底,一页不漏地读完仍戴着帽藏身,躲避,避难在遮蔽处;附在信中;秘密地,暗中没有注明寄发人姓名,地址及内容;用没有注明商号,装有何物的封袋邮寄在。。。
-
The notable proliferation was not observed by eyes in the local of injection. The infiltration of inflammation cells and mild proliferation of fibrocyte around dura mater was observed by HE stained in 4 and 8 weeks after injection. Infiltration and exudation of inflammation cells was observed by HE stained in epidural nerve root. Compared with group A, no changes of group B, C and D were observed under specific stained. Proliferation of type Ⅱ collagen fibers around dura mater was seen under immunohistochemical stained in 4 and 8 weeks after injection. There is no significant demyelination changes under LFB stained. The thickness and shape of the myelin sheath in epidural nerve root was not regular under transmission electronic microscopy in 4 and 8 weeks after injection. Fibroblast was also seen there. In nerve endometrium, macrophage could be seen under TEM, myelinated nerve fiber changed significantly, but nonmyelinated nerve fiber changed mildly. When 8 weeks, the changes of group D is smaller than the group B and C.
给药局部肉眼观察未见明显的纤维组织增生;HE染色可见B、C、D三组给药后四周及八周时硬膜内外均有炎细胞浸润,纤维细胞轻度增生,硬膜外神经根内有炎细胞浸润及炎性渗出;特殊染色B、C、D三组同A组相比未见有脊髓及神经根的改变;免疫组化染色,给药后四周及八周时,硬膜内外均有Ⅱ型胶原纤维增生;固兰染色B、C、D三组未见有明显脱髓鞘改变,与A组相比无明显异常改变;电镜观察B、C、D三组在给药后的四周及八周时,表现为硬膜外神经根内髓鞘厚薄不一,形状不规则,可见成纤维细胞,神经内膜中可见有巨噬细胞;粗大的有髓神经纤维变化明显,无髓神经纤维受累较轻;八周时电镜下D组改变较B、C两组为轻。
-
First, this article introduced 2 grade of rotary kiln principle of work and the equipment, to rolled the circle mechanics behavior to carry on the analysis, proposed - rolled the circle - under roller's rotary kiln overall modelling based on the tube body - kiln liner - big tooth ring, to rolled the circle - under roller's contact stress to carry on the finite element analysis the method, and obtained rolled the circle contact stress the size and the distribution rule, finally indicated that rolled the circle contact stress mainly to have two main peak values and the sudden change in one week, appeared is rolling the circle and the under roller contact area; Then, rolls the circle the stress to regard as is the principal stress unknown plane stress test, the use quite mature modern test technology, proposed rolls the circle stress test the principle and the plan, and to rolled the circle the stress to carry on the scene test, the stress which the scene test analysis result and the finite element analysis calculated has compared, had proven the whole method modelling's finite element analysis method's rationality and rolled the circle - under roller contact stress the result accuracy; Finally, uses ANSYS APDL the re-development technology, in view of 2 grades of rotary kilns, rolled the circle - under roller contact stress the overall finite element analytic method to carry on the re-development.
首先,本文介绍了2档回转窑工作原理和装置,对滚圈的力学行为进行了分析,提出了基于筒体-窑衬-大齿圈-滚圈-托轮的回转窑整体建模,对滚圈-托轮的接触应力进行有限元分析的方法,并得到了滚圈接触应力的大小和分布规律,结果表明滚圈接触应力在一周内主要存在两个主要的峰值和突变,都出现在滚圈与托轮接触区域;然后,把滚圈的受力看成是主应力未知的平面应力的测试,利用比较成熟的现代测试技术,提出了滚圈应力测试的原理和方案,并对滚圈的应力进行了现场测试,现场测试分析结果与有限元分析计算出的应力相比较,证明了整体法建模的有限元分析方法的合理性和滚圈-托轮接触应力的结果的正确性;最后,利用ANSYS的APDL的二次开发技术,针对2档回转窑,就滚圈-托轮接触应力的整体有限元分析法进行了二次开发。
-
First of all, the paper carried out test study on four two-spanned model members of FSMRCWB, including three 1/2-scaled two-storeyed models and one 1/3-scaled three-storeyed model. The paper analyzed the test results, including analysis on mechanical property of the composite wall beam under vertical loads, and failure mode, deformation capacity, aseismic performance under horizontal loads and constant vertical loads. Secondly, the nonlinear property of concrete is studed and the nonlinear models of FSMRCSS is builded by ANSYS. Last, The paper studies the result of ANSYS, which mainly includes the loading-displace curve of FSMRCSS under horizontal loads and constant vertical loads, the mechanics of arch under vertical loads lonely and under horizontal loads and constant vertical loads respectively, and status of the distribution and changing of vertical stress and cross shear on the surface of the suporting beam, and the influence of span ratio and hole.All in all, the caculating results are in good agreement with the test results.
本文首先进行了三个1/2比例的两跨两层和一个1/3比例的两跨三层的框支密肋复合墙梁的模型试验,分析了框支密肋复合墙梁在竖向荷载作用下的受力性能,以及在竖向荷载与水平低周反复荷载共同作用下的受力性能、变形性能、滞回性能、耗能系数及破坏形态;其次,研究了混凝土的非线性特性,建立了框支密肋复合墙梁非线性有限元模型,并借助大型通用有限元软件ANSYS进行计算;再则,进行了非线性有限元结果分析,主要研究框支密肋复合墙梁在竖向荷载与水平地震力共同作用下的荷载位移曲线,分析在竖向荷载单独作用下和在竖向荷载与水平地震力共同作用下墙梁的拱作用,托梁顶面的竖向应力和横向剪应力分布及变化情况,并讨论跨度比、洞口对墙梁拱作用和托梁顶面的竖向应力的影响。
-
The motor is provided with a thermal motor protector (a protective device that is sensitive to both temperature and current) that prevents the temperature of the motor windings from becoming more than 125°(257°) under the maximum load C F under which the motor runs without causing the protector to cycle, and from becoming more than 150°(302° with the rotor of the motor locked; or C F) 4 The motor complies with the requirements for impedance-protected motors; b Under wiring, unless the wiring complies with the VW-1 (Vertical-Specimen) Flame Test in the Reference Standard for Electrical Wires, Cables, and Flexible Cords, UL 1581; c Under an unenclosed switch, transformer, relay, solenoid, and the like, unless it 7 舞台灯标准 can be shown that malfunction of the component does not result in a fire; or d Under field- and factory-made splices and overload and overcurrent protection devices.
F C F 4 发动机符合阻抗保护发动机的要求; b 配线,除非电线符合VW-1及参考UL 1581标准的有关电线,电缆及线芯灵活性的焰火测试。 c 未封装的开关,变呀器,继电器,螺线管及与其相似的,除非它可显示元件的故障不会引起火灾。 d 在户外和生产工厂接合过载和过流保护装置。
-
Postoperative contrast sensitivity testing showed statistically significant differences (P<0.05)between the two IOLs at 12 and 18 cpd under photopic, at 1.5and 3 cpd under mesopic, and at 1.5 and 3 cpd under mesopic with glare conditions.· CONCLUSION: The Tecnis Z9000 IOL proved to have statistically significant superior contrast sensitivity to the 911AIOL at high spatial frequencies under photopic conditions and at low spatial frequencies under mesopic and mesopic with glare conditions.
术后对比敏感度分析发现两组在12和18 cpd、1.5和3 cpd以及1.5和3 cpd均有统计学差异(P<0.05)结论:Tecnis Z9000 I0L被证明其对比敏感度在明视高空间频率和暮视低空间频率方面均显著优于911A IOL。
-
To court trailer court trailer park trailer camp 202-cover be covered with blow one's cover break cover draw a cover from cover to cover provide cover for read from cover to cover remain cover take cover under cover under plain cover under the cover of under separate cover under the same cover cover against cover in cover into cover over cover up n.
名誉, 使名誉受坏影响;驳倒,问住;不让发言,使无法应付;不顾,蔑视做出让人蔑视的事在法庭外和解提出诉讼对某人起诉,控告活动住屋集中地活动住屋集中地活动住屋集中地 n。盖子,封面,藉口 vt。覆盖,铺,掩饰,保护,掩护,包括,包含,适用
- 相关中文对照歌词
- L'unité
- Katie's Tea
- La Colline Des Roses
- The Ordertaker
- Just Some Order
- La Dance Ghetto
- Novus Ordus Clitorus
- The Peckin' Order
- Going Under
- Best Of Order
- 推荐网络例句
-
This time, we do not want to colorize the image. I've dragged my Hue slider to the left to a value of -123
这次不要勾选着色,我将色相的滑标向左移到-123
-
A timely report from an independent prosecutor would surely be helpful in buttressing and justifying that order.
及时报告从一个独立的检察官一定会有助於支撑和合理的秩序。
-
We have equipped a set of modernized production pattern and implemented the concept of Total Quality Management.
公司生产配备了一条龙式的现代化生产模式,已通过ISO9001质量管理体系认证。