英语人>网络例句>under load 相关的网络例句
under load相关的网络例句

查询词典 under load

与 under load 相关的网络例句 [注:此内容来源于网络,仅供参考]

The main research contents are as follows:1. Through massive calculation, analysis and comparison, sum up the similarities and differences between the special-shaped cross sections and rectangular cross sections in mechanical features, between reinforced concrete special-shaped columns and rectangular columns in load-bearing capacity, ductility performance and provide necessary basic concepts and data for further understanding the characteristics of the special-shaped columns;2. Through massive elastic calculations and elasto-plastic analysis, under the preconditions of satisfying the code's requirements for axial compression ratio, limit value of lateral displacement and load-bearing capacity of normal section,oblique section and beam-column joint, under circumstances of different intensity of earthquake, structure dead weight, sort of site and column grid bay dimension, the variation regularity of maximum suitable height of structure, and thus sum up the maximum suitable height of structure for code for the purpose of macro-control while deciding the design scheme;3. Make a preliminary study on the stress feature of reinforced concrete special-shaped column and Z-shaped column of which the ratio of limb length to limb thickness is between 4~5 ,and the preliminary design method is suggested;4. Through elato-plastic time history dynamic analysis of typical projects, check up the weak storey of the special-shaped column structure and yielding, breaking and collapse mechanism to satisfy the earthquake resistant requirement to buildings of remaining stand under strong earthquake;5. Derive for project use simplified calculation formula of vibration period, suitable vibration period, suitable rigidity of special-shaped column structure through theoretical analysis, and provide an easy and practical method for deciding the structure scheme economically, safely and reasonably;6. Based on the study achievements in theory and massive analysis and calculations of this paper, sum up the regularities of inner force, deformation of special-shaped column structure and seismic conceptual design, and thus the suggection of seismic design of special-shaped column structures is presented.

本文研究的主要内容如下:通过大量的计算、分析和对比,总结出异形截面与矩形截面在力学特性、钢筋混凝土异形截面柱与矩形截面柱在承载能力、延性性能等方面的异同,为深入了解异形截面柱的特点提供必要的基本概念和数据;通过大量的弹性及弹塑性计算分析,在满足规程对轴压比、侧移限值及正截面、斜截面、节点承载力抗震验算要求的前提下,在不同抗震设防烈度、结构自重、场地类别及柱网开间尺寸情况下最大适宜高度的变化规律,并在此基础上总结归纳出异形柱结构的最大适用高度规定,可用于规程,以便于在确定方案时起到宏观控制的作用;对肢长与肢厚比在4~5的钢筋混凝土异形截面柱及Z形柱的受力特点进行初步探讨,提出初步的设计方法;通过对典型工程的弹塑性动力时程分析,检验异形柱结构的薄弱层及屈服、破坏、倒塌机制,以达到建筑物大震不倒的抗震设防要求;通过理论分析,推导出异形柱结构自振周期,以及适宜自振周期、适宜刚度的工程实用简化计算公式,为经济、安全、合理地确定结构方案提供简便实用的方法;在本文理论分析、计算以及大量的研究成果基础上,总结归纳出异形柱结构内力、变形的规律及抗震概念设计内容,并在此基础上提出异形柱结构的抗震设计建议。

The motor is provided with a thermal motor protector (a protective device that is sensitive to both temperature and current) that prevents the temperature of the motor windings from becoming more than 125°(257°) under the maximum load C F under which the motor runs without causing the protector to cycle, and from becoming more than 150°(302° with the rotor of the motor locked; or C F) 4 The motor complies with the requirements for impedance-protected motors; b Under wiring, unless the wiring complies with the VW-1 (Vertical-Specimen) Flame Test in the Reference Standard for Electrical Wires, Cables, and Flexible Cords, UL 1581; c Under an unenclosed switch, transformer, relay, solenoid, and the like, unless it 7 舞台灯标准 can be shown that malfunction of the component does not result in a fire; or d Under field- and factory-made splices and overload and overcurrent protection devices.

F C F 4 发动机符合阻抗保护发动机的要求; b 配线,除非电线符合VW-1及参考UL 1581标准的有关电线,电缆及线芯灵活性的焰火测试。 c 未封装的开关,变呀器,继电器,螺线管及与其相似的,除非它可显示元件的故障不会引起火灾。 d 在户外和生产工厂接合过载和过流保护装置。

DPR of Atriplex canescens in differenttreatments are quite different, 2.87μmolm~(-2)s~(-1) under no soil water stress, 6.46μmolm~(-2)s~(-1) under light soil water stress, 6.06μmolm~(-2)s~(-1) under medium soil waterstress, 3.04μmolm~(-2)s~(-1) under heavy soil water stress. Comparing with the DPRunder light soil water stress, DPR decreased by 6.19% under medium soil waterstress, by 52.94% under heavy soil water stress and by 55.57% under no soil waterstress.

不同土壤水分胁迫下四翅滨藜的DRR表现出显著的差异,无土壤水分胁迫下DRR为2.87μmolm~(-2)s~(-1),轻度土壤水分胁迫的DRR为6.46μmolm~(-2)s~(-1),中度土壤水分胁迫的DRR为6.06μmolm~(-2)s~(-1),重度土壤水分胁迫的DRR为3.04μmolm~(-2)s~(-1),以轻度土壤水分胁迫为基础中度土壤水分胁迫下降了6.19%、重度土壤水分胁迫下降了52.94%、无土壤水分胁迫下降了55.57%。

As to'Cabemet Sauvignon'and'Queen of Vineyard', which belong to the'West Europe Cultivars Group', no obvious decline of Fv/Fm was found in their potted plants even under severe drought stress. Their photosynthetic abilities also greatly recovered after rewatering, i. e. no serious photodamage was formed in these cultivars under drought stress. Between them, the φPSⅡ of 'Queen of Vineyard'under severe drought stress was much lower than that of'Cabernet Sauvignon', which suggested that the light use efficiency of the former was much lower than the latter under severe drought stress. The potted plants of'Autumn Royal'and'Rizamat' sustained high Fv/Fm and φPSⅡ before moderate drought stress, but seriously declined under severe drought stress, which indicated that these cultivars had a weak resistant ability to extreme drought stress. A hybridized cultivar of Vitis vinifera L. and V. labrusca L.,'Red Double Taste', its Fv/Fm and φPSⅡ expressed mild decline along drought stress grade.φPSⅡ of'Red Double Taste'was the highest among seven cultivars under severe drought stress condition, which might closely connected with its high photorespiration activity. Another new cultivar,'Red Globe', and a rootstock,'1103Paulsen', the Fv/Fm and φPSⅡ of their potted plants declined markedly under slight drought stress, which suggested that they held a weak ability to defend against photoinhibition.

西欧品种群的赤霞珠和葡萄园皇后,其盆栽苗的Fv/Fm直到重度干旱胁迫下仍没有明显的降低,且复水后光合能力恢复程度较高,即干旱没有给这两个品种造成严重的光破坏,而两个品种之间,葡萄园皇后在重度干旱胁迫下的φPSⅡ明显低于赤霞珠,说明其光合器官在严重干旱胁迫时对光能的利用率较差;新品种皇家秋天和东方品种群的里扎马特在中度干旱胁迫下仍可维持较高的Fv/Fm和φPSⅡ,但在重度干旱胁迫下则降低幅度较大,说明其抵御极端干旱胁迫的能力较差;欧美杂种红双味的Fv/Fm和φPSⅡ随着干旱胁迫程度的增加呈现平缓的下降趋势,而且其φPSⅡ在重度干旱胁迫下是七个品种中最高的,这应该与其此时仍维持较强的光呼吸活性有关;红地球和砧木1103Paulsen的Fv/Fm和φPSⅡ在轻度干旱胁迫下就明显下降,表明干旱条件下其抵御光抑制的能力较差。

The maximum rate of decomposition of soil organic carbon insubtropical wetness area is red soil under coniferous and broad-leaved mixed forest>yellowsoil under grass>yellow soil under shrub>yellow soil under broad-leaved forest>red soilunder camellia oleifera; decomposition rate of yellow soil is faster than red soil. Themaximum rate of decomposition of soil organic carbon in subtropical wetness zone isyellow-brown soil under mixed forest in Nanjing>red soil under adult fir in Yujiang>redsoil under broad-leaved forest in Yujiang.

湿润亚热带地区森林土壤有机碳分解速率最大值出现在培养初期的一周内,其顺序:针阔混交林红壤>茅草黄壤>灌木林黄壤>常绿阔叶林黄壤>油茶红壤,同一植被下黄壤有机碳分解速率大于红壤,南京混交林黄棕壤>余江杉木(32年)红壤>余江常绿阔叶林红壤。

Uses the biggest strength training method (80%~100% biggest strength) adding 30% biggest strength load training method; the load combination method to make the acclivity to lie pushes the barbell training, good in uses; the biggest strength training method to the upper limb shot fast strength training effect (80%~100% biggest strength) adding the unarmed quickest speed training method and the biggest strength training method (80%~100% biggest strength) adding 60% biggest strength shoulders the training method the load combination method.

用"最大力量训练(80%~100%最大力量)+30%最大力量负荷最快速度训练法"负荷组合方法做上斜卧推杠铃训练,对推铅球上肢快速力量的训练效果好于用"最大力量(训练80%~100%最大力量)+徒手最快速度训练法"与"最大力量训练(80%~1 00%最大力量)+60%最大力量负荷最快速度训练法"负荷组合方法。

A ultra-short term load forecasting method based on autoregression;2. A novel method called load derivation is introduced for ultra-short term load forecasting of power system.

仿真表明了改进模型的有效性和算法的可行性,对于超短期负荷预测这类需要反应迅速的问题,采用本文提供的方法进行预测是可靠且非常有效的。

Base Load 基本负荷 Base load is that portion of a building load demand which is constant.

基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。

Base Load Base load is that portion of a building load demand which is constant. It is the "base" of the building demand curve.

基本负荷基本负荷是指建筑负荷需求量中不变的那一部分,是构成负荷需求曲线的基数。

We also see that the annual peak load is 15GW . The base load has to be fed 100 percent of the time , but the peak load may occur for only 0.1 percent of the time .

我们还注意到,每年系统需求的平均最大值是15GW,而这已经需要百分之一百的时间去提供基本负荷了,但是高峰负荷只会出现0.1秒而已。

第9/500页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
The Weight
Bulletproof
The Weight
The Weight
The Weight
Mother Load
The Weight
The Weight
Going Under
Take A Load Off
推荐网络例句

The network space is the typical form of abstract space when it comes to the digital stage.

网络空间是抽象空间数字化阶段的典型形式。

The Notarial System,as the system of judicial certification in our country,is both the constructor and the defender of social credit system,It has its special value and function in the social honesty.

公证制度作为我国司法证明制度,既是社会信用体系的建设者,同时也是社会信用的捍卫者,在诚信中有其特殊的价值和功能。

"He'll never love you as much as you love him," Ben pronounced.

"他永远不会像你爱他那样爱你。"本说。