英语人>网络例句>under load 相关的网络例句
under load相关的网络例句

查询词典 under load

与 under load 相关的网络例句 [注:此内容来源于网络,仅供参考]

Through calculation and analysis of static modal under dead load, live load and water load, we derived the non-seismic internal force and deforming of the structure.

通过对静力模型在恒载、活载和水荷载作用下的计算和组合,得到了结构非抗震设计的内力和变形。

At last, 2KVA - experimental prototypes of AC power supplies of multiple-loop analog and digital control system have been made. Fast dynamic response and load compatibility have been verified by the experiment of step change in the load and under rated full-wave diode bridge rectifier load.

最后各研制了一台2KVA的多环模拟控制系统逆变电源实验样机和数字化控制系统逆变电源实验样机,切换负载实验和负载适应性实验分别验证了逆变电源系统具有良好的动态性能和负载适应性。

In this paper, the limit load of buried pipe, that is used in Nanjing city nature gas using engineering, was studied by finite element analysis under various groundsill character, pedestal angle and ground pressure, and the risk assessment for this piping was performed. The limit load of buried pipe was measured by experiments. The research contents and results were as follows:(1) With FEA method, the effects of various groundsill character, pedestal angle and ground pressure on the limit load of buried pipe were studied.

本文主要针对南京市城市天然气利用工程的埋地管道,研究其在不同地基性质、支座包角和地面载荷情况下的极限载荷,并进行了试验研究,同时进行了风险评价,主要研究内容与结论如下:(1)通过有限元计算分析,研究了不同地基性质、支座包角和地面载荷对埋地管道极限载荷的影响。

Tests of three interior and three edge slab-column connections are studied in this paper. The properties of connections under vertical load and lateral reversed load are analyzed. The load-displacement hysteretic curve, development of crack, energy dissipation capacity and failure mode of slab-column connections are studied.

本文首先进行了六个板柱节点在竖向剪力和低周反复荷载作用下的试验研究,探讨了节点不平衡弯矩、板厚、柱截面尺寸、板配筋率等对节点受力性能和抗震性能的影响,分析了节点的荷载-位移滞回曲线、裂缝开展、延性性能和破坏形态等。

This design after determination frame layout, has carried on the level first the load generation of tabular value computation, extracts the wind load with the D value law the function, then uses the bending moment two methods of distribution to calculate the vertical load under the function structure endogenic force, and discovers most disadvantageous group of or a several group of endogenic force combination.

本设计在确定框架布局之后,先进行了层间荷载代表值的计算,用D值法求出风荷载的作用,接着用弯矩二次分配法计算出竖向荷载作用下的结构内力,并找出最不利的一组或几组内力组合。

This design after determining the frame layout, has carried on the level the first load generation of tabular value computation, extracts the wind load with the D value law the function, then uses the bending moment two methods of distribution to calculate the vertical load under the function structure endogenic force, and discovers most disadvantageous group or a several group of endogenic force combination.

本设计在确定框架布局之后,先进行了层间荷载代表值的计算,用D值法求出风荷载的作用,接着用弯矩二次分配法计算出竖向荷载作用下的结构内力,并找出最不利的一组或几组内力组合。

The primary studying works and characteristics:1 To summarize reinforcing theory of cement mixing pile composite foundation2 To analyze the primary mechanics characters and changing rules of cement mixing pile, based on analysis of test data both indoor and outdoor.3 To discuss siding frictional resistance, ending resistance, ultimate bearing capacity of simple mixing pile and effectiveness factor of grouped piles, loading ratio of soil between piles under cushion cap of grouped piles and stress ratio of pile and soil and so on, and use many computation method and experimentation method to ensure bearing capacity of mixing piles composite foundation.4 To point out and analyze eight sides flaws and problems of the bearing capacity calculation method of mixing pile compositefoundation which ensured by national and normative method/ formula.5 To apply test results of loading tests and a few settlement observation data, use gray theory to predicate ultimate bearing capacity of deep mixing piles, actual example demonstrate engaging between theoretical predicted value and actual value.6 To apply groovy layerwise summation method to discuss entity piles method, double foundation method, equivalent layerwise summation method and consolidation theoretical method and so on, especially by combination of engineering example, use FEM to calculate or discuss the settlement and changing rules of composite foundation.7 To discuss problems of critical length of composite foundation by combination of engineering example and numerical analysis method, and analyze the contrast of critical length between simple pile load and most area load of composite foundation, not only critical length of composite foundation is relative to modulus ratio between piles and soil, but also upside load distribution area of composite foundation.

主要的研究工作与特色为:(1)总结了水泥搅拌桩复合地基的加固原理;(2)在对室内外试验资料进行统计分析的基础上,系统分析了搅拌桩水泥土的主要力学特性及其变化规律;(3)探讨了搅拌单桩的侧摩阻力、端阻力、极限承载力及群桩效率系数、群桩承台下桩间土荷载分担比及桩土应力比等,提出用多种计算方法并结合试验方法来综合确定搅拌桩复合地基的承载力;(4)明确指出和分析了按国家有关规范的方法确定搅拌桩复合地基承载力所存在的八个方面的缺陷与问题;(5)利用过去没有加载至破坏阶段的载荷试验成果和较少的沉降观测数据,尝试了用灰色理论预测深层搅拌桩的极限承载力,实例表明理论预测值与实测值吻合较好;(6)在常规分层总和法的基础上,探讨了复合地基沉降计算的实体墩基法、双层地基法、等效作用分层总和法、固结理论法等,特别是结合工程实例,用有限元数值计算等方法计算和讨论了搅拌桩复合地基的沉降及其变化规律;(7)结合工程实例,用数值分析方法探讨了复合地基临界桩长的问题,指出和分析了单桩荷载下的临界桩长与复合地基大面积荷载下的临界桩长存在很大的差别,复合地基的临界桩长不仅与桩土模量比有关,而且与复合地基上部荷载分布面积有关。

LWhen the unacclimated UASB reactor, acclimated UASB reactor and anerobic filter were shockcdy by the combined load, the largest increase of the effluent COD under combined load shocking was higher than that of the sum of chloroform (or 2,4-dinitrophenol, noted DNP) and COD load shocking independently.

2多负荷冲击(COD+CF+DNP+ALK)按照正交试验来设计,反应器UASB-RⅠ在多负荷冲击时,影响出水VFA的因素的主次顺序为CF>COD>DNP>ALK;影响出水DNP的因素的主次顺序依次为DNP>CF>COD>ALK;影响VGP和%CH_4的因素的主次顺序分别为CF>DNP>COD>ALK、CF>DNP>COD>ALK。

In order to simulate the vehicle load on the road, the formula is derived assuming that the load moves with uniform velocity. The formula under this load is obtained. It is important to analyze the dynamic character of rigid pavement.

为了模拟道路上汽车荷载的实际运行情况,本文假定汽车匀速在路面上行驶,由此获得粘弹性文克勒地基板在移动荷载作用下的挠度表达式,并对计算结果进行了一些分析而获得比较重要的结论。

The results of simulations of three-graded-concrete supported beam under dynamic load show that in the impact load the carrying capacity improved and the displacement decreased when specimen failed, and without inial static load, it is dangerous that material tensile strength and elastic modulus were improved to its 1.3 times in the code.

三级配混凝土动载数值模拟结果表明,在短时高速的冲击荷载作用下,试件的极限承载力提高,破坏时的位移降低;在没有初始静载的情况下,规范规定的把材料的抗拉强度和弹性模量提高1.3倍所得极限承载力相对较大。

第7/100页 首页 < ... 3 4 5 6 7 8 9 10 11 ... > 尾页
相关中文对照歌词
The Weight
Bulletproof
The Weight
The Weight
The Weight
Mother Load
The Weight
The Weight
Going Under
Take A Load Off
推荐网络例句

The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.

组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。

We have battled against the odds in a province that has become increasingly violent.

我们对在一个争夺日益激烈省的可能性。

MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.

米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。