英语人>网络例句>under load 相关的网络例句
under load相关的网络例句

查询词典 under load

与 under load 相关的网络例句 [注:此内容来源于网络,仅供参考]

In this paper eighteen examples, which are designed strictly owning to currently Codefor seismic design of buildings of my country, are used to analyze the structure earthquakeresponse under the horizontal seismic load (nabla load distribution pattern) by Push-overanalytical method. The corresponding structural influencing coefficient, the displacementamplification factor, the overstength and ductility factors are analyzed taking into accountthe factors changing, such as level number, span length, span number.

本文严格按我国《建筑抗震设计规范》设计了18个多层钢框架,并以此为例,采用Push-over方法分析了结构在水平荷载作用下的地震反应,得出了多层钢框架的结构影响系数、结构延性和超强系数以及位移放大系数,并讨论了这些系数随着结构层数、跨度及跨数的变化规律。

Ultimately,on the designed experimentative platform of the vector control system,we performed the motor experiment of off-load and on-load under different frequencies,at the same time we analyze the results and validate the feasibility of the system designed scheme.

最后,在所设计的矢量控制调速系统实验平台上,进行了电机在不同频率下的空载和带负载的实验,并对实验结果进行了分析,验证了系统设计方案的可行性。

The results show that the aluminum alloy sandwich deck under lateral pedrail deck load and wheel load would fail in the form of compression buckling.

研究表明,铝合金夹心板在横向履带载和轮式载的作用下,主要表现为受压面板的屈曲和夹心斜撑板的屈曲。

A deep beam model is developed to simulate load-bearing wall structure which is perpendicular to the edge of excavation, rigorous solution is derived to find the deformation rule of load-bearing wall, Assuming the position of neutral axis at the lower edge of the beam, the restraint effect of foundation and soil can be considered. Damage rule of the wall under the effect of settlement and horizontal extension are discussed.

将垂直于基坑的承重墙结构简化为深梁模型,通过调整深梁中性轴位置来考虑建筑物与地基的共同作用,通过调整E/G的值来考虑砌体材料的各向异性及门门窗开洞情况,用解析法推导了建筑物的变形规律,研究了建筑物在水平拉伸与沉降共同作用下破坏规律。

Researched results indicated that contact force's modification was very little inner joints of synchronize Mechanism under the state of no-load and heavy load of sizing press, the rolling force that slab deformed created was supported mostly by side Mechanism.

研究结果表明,调宽机在空载和工作两种状态下,同步机构各构件间的运动副内接触力变化不大,侧压机构主要承受了板坯变形产生的轧制力。

Under the same situation as tube-diameter and so on, yield load and limited load increase with the increasing of steel tube ratio. But the steel tube ratios variety has ruleless to maximum displacement of the upper column.

2在钢管外径等其他属性相同的情况下,屈服荷载与极限荷载随含钢率的增大而增大,但含钢率的变化给柱顶最大位移带来的变化不具有规律性。

Under the same situation as steel tube ratio and volumetric percentage of stirrups and so on, yield load and increases with the increasing of reinforced bar-diameter. But the variety of reinforced bar-diameter has ruleless to limited load and ductibility.

4在含钢率、配箍率等其他属性相同的情况下,屈服荷载随着钢筋直径的增大而增大,但钢筋直径的改变对极限荷载和柱的延性的改变不具有规律性。

To all project practicality, the introduction is given to the operational characteristics, the methods for calculation and the researching actuality of the tail tunnels with sloping ceiling underground hydropower stations the Three Gorges. This paper has discussed in detail the characteristic method being the same with the compressive flow and the Priessmann solution being the same with the free-surface-pressure flow. And how to deal with boundary conditions has been expatiated. Also hydraulic transient process of tremendous load fluctuation in the tail tunnels with sloping ceiling has been numerical simulated and the Fortran program for numerical simulation has been given. The paper gain the maximal press for tail end of the shell, the maximal rising rate of rotational speed of generating set, the maximal vacuum degree for inlet of the tail tunnels and so on under 11 kinds conditions of tremendous load fluctuation. These conditions include the design conditions, the check conditions and the superposition conditions. Finally, the computing results have been analyzed and summarized. The end chapter is the general comment of the whole-length content and the describing of the intending view of researching.

本文以三峡右岸地下电站尾水洞设计为背景,从工程实际出发,阐述了变顶高尾水洞的工作特性、使用范围及其研究现状;详细论述了适用有压流的特征线法、适用明满交替流的普里斯曼解法等数学模型;边界条件的给定和明满交替流的计算方法;用Fonran语言编制了数值计算程序,对三峡右岸地下电站变顶高尾水洞的大波动工况进行了数值模拟,分别得出了在设计工况、校核工况和叠加工况下蜗壳末端最大压力上升值、机组最大转速上升值和尾水管进口最大真空度等重要参数;对数值计算结果进行了详细分析并得出了有价值的结论;最后展望了今后水电站变顶高尾水洞的研究方向。

A Material nonlinear finite element analysis for the cast-in-place reinforced concrete hollow slab that occurs from initial loading, cracking, yielding to failing is carried on. The cracking load, ultimate load, the displacement rules and the principal stress distribution rules of the hollow slab under the vertical loads are obtained. A Material nonlinear finite element analysis for the single span hollow flat-plate floor is also carried on. The function of the concealed wide-flat beams is definite by analyzing the principal stress distribution diagram. The calculating results verify the theoretical analysis and give some important conclusions which are great useful to improve the constructing of the new flat-plate floor.

其次对空心板进行了从加荷、开裂、屈服直至破坏的全过程材料非线性有限元计算,得到了空心板在竖向荷载作用下的开裂荷载、极限荷载及位移和应力分布规律;还对单跨无梁楼盖进行了材料非线性有限元计算,通过分析主应力场明确了柱上暗扁梁的作用;有限元计算的结果验证了以上的理论分析并得到了一些重要的结论,对改进现浇空心板无梁楼盖的构造措施有重要的参考价值。

The load carrying capacity provided by a special sulphur-phosphorus additive is significantly better than that of leaded gear oils gear tooth wear is reducedparticularly under conditions of high load.

特别选用的极压添加剂,远超过其他含铅齿轮油在负重方面的表现,尤其在重负荷的情形下,能减少齿轮牙方面的磨损。

第12/60页 首页 < ... 8 9 10 11 12 13 14 15 16 ... > 尾页
推荐网络例句

Do you know, i need you to come back

你知道吗,我需要你回来

Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.

1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。

Chapter Three: Type classification of DE structure in Sino-Tibetan languages.

第三章汉藏语&的&字结构的类型划分。