英语人>网络例句>under construction 相关的网络例句
under construction相关的网络例句

查询词典 under construction

与 under construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

SEC. 213. Subject to the conditions of this section and tosuch terms and conditions as the Administrator determines to benecessary to carry out the purposes of this title, the Administratoris authorized to guarantee, and to make commitments to guarantee, the principal and interest (including interest accruing between the date of default and the date of the payment in full of the guarantee) of any loan, obligation, or participation therein of any State, municipality, or intermunicipal or interstate agency issued directly and exclusively to the Federal Financing Bank to finance that part of the cost of any grant-eligible project for the construction of publicly owned treatment works not paid for with Federal financial assistance under this title, which project the Administrator has determined to be eligible for such financial assistance under this title, including, but not limited to, projects eligible for reimbursement under section 206 of this title.

a 依于这部分和tosuch 期限和条件的条件作为管理员确定对benecessary 执行这个标题, Administratoris 的目的被批准保证,和做承诺保证,主要和兴趣(包括兴趣累积在缺省日期和付款的日期之间充分保证)任一贷款、义务,或参与在其中任一个状态、自治市,或intermunicipal 或跨境代办处直接地和完全被发布对联邦财务银行提供经费,一部分的任何授予合格的项目的费用为公开地拥有的治疗工作的建筑没被支付与联邦财政协助在这个标题之下,射出管理员确定是有资袼这样的经济援助在这个标题之下,包括,但没限制对,项目有资袼退款在部分206 之下这个标题。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Dozens of companies under the jurisdiction of the civil engineering construction subsidiary, decoration companies, steel companies, fire works, road and bridge companies, professional installation companies, Hong Xiang real estate development company, Shun Po security supplies, construction machinery Leasing companies such as the production and management units and currently employs more than 5,000 people, all types of engineers and technicians more than 1,700 people, senior engineers and technicians from more than 500 people, the construction division Yiji 4, the project manager qualification certificates held by 171 persons.

公司下辖十个土木建筑施工分公司、装饰装修公司、钢结构公司、消防工程公司、路桥公司、安装专业公司、鸿祥房地产开发公司、顺宝安全防护用品公司、施工机械租赁公司等生产经营单位,现有员工5000余人,各类工程技术人员1700余人,中高级工程技术人员500余人,壹级建造师4人,持有项目经理资格证书者171人。

Companies under the Hitachi Group, Division of earth and machinery, accessories division, the cause of integrated industries, such as the Ministry of Industry five units, is the Hitachi Construction Machinery Co., Ltd. Hitachi excavator, Shandonglingong Provisional Construction Machinery Co., Ltd. The licensing loaders, Tianjin Construction Machinery Plant to Meet licensing bulldozers, Japan Konan MKB, South Korea Saehan broken hammer, Japan Jomo lubricants, Germany Furui De lubricants in east China, central China's A-level agents.

公司下设日立事业部、土石方机械事业部、配件事业部、综合产业事业部等五大产业单位,现为日立建机株式会社日立挖掘机,山东临工工程机械有限公司临工牌装载机,天津建筑机械厂移山牌推土机,日本甲南MKB、韩国世韩破碎锤,日本矫马润滑油、德国福瑞德润滑油在华东、华中地区的A级代理商。

The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.

文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。

This paper studies the change of lime reduction of lime-ash soil under the following three conditions in an inside experiment,such as low temperature,stable temperature and exposed found. The relations among the different condition,lime content and ages in lime-ash soil construction process are drawn,which can provide reference for construction units to grasp its changes rules,and lay a foundation for making feasible construction plan and measurement criterion.

通过室内试验对二灰土在恒温箱低温养生、养护室标准养生和暴露养生这三种养护条件下石灰剂量的衰减规律进行试验研究,得出的二灰土底基层施工中养护条件、实测灰剂量与龄期之间的相互关系,可为施工单位掌握二灰土石灰剂量变化情况提供依据,并为制定出科学可行的施工组织计划和检测标准打下基础。

It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .

据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。

Under the current rate of development and construction, 3-5 years, the office will be present to take shape along the delegation to basically shaped, and in the construction of the World Trade Center buildings will become one of Shenzhen City landmark in the construction of the Jubilee Building, Chong exhibition center, such as intelligent buildings Guangzhou office buildings Shenzhen also symbolize the whispering produce a high-grade office market took as a way to show the deep businessmen election.

根据目前的开发建设速度,3至5年内,西部办公组团沿线将由目前的雏形发展到基本成型,而在建的世贸中心大厦将成为深圳市标志性建筑之一,在建的大庆大厦、创展中心、广州大厦等智能化办公大厦,也为深圳市高档写字楼市场平添了一抹亮色,成为来深一展宏图的商家佳选。

Renzhijiang under the new Huayuan the Hairun International Holdings apartments in several "quality commitment system" by construction contractors, property management companies, construction materials providers, manufacturers, and other decorative decoration families institutions, in writing to customers in the form of a solemn commitment to ensure that the construction and management of links to the corresponding standards, or are just compensation.

由任志强麾下的新华远控股的海润国际公寓率先创出了&工程质量承诺制&,由工程建造商、物业管理商、建材提供商、装饰装修商等各家机构,以书面的形式向客户作出郑重承诺,确保工程施工与管理的各个环节达到相应标准,否则照单赔偿。

Combined with practical work the on-site precast and transverse movement construction technology of hollow slab in bridge construction under limited construction site is introduced.

结合工程实践介绍了桥梁施工时,当受地形条件的限制,在无合适预制场地的情况下,采用在桥位处进行空心板预制及横向移动的施工技术,既保证了施工工期,又降低了工程成本,取得了良好的施工效果,达到了经济、优质、高效的施工目的。

第24/57页 首页 < ... 20 21 22 23 24 25 26 27 28 ... > 尾页
相关中文对照歌词
Highway (Under Construction)
Under Construction
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。