英语人>网络例句>under construction 相关的网络例句
under construction相关的网络例句

查询词典 under construction

与 under construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

Through presentation and discussion of traditional wavelet construction with lifting scheme, the multiwavelet construction with lifting scheme is introduced. The extension of Vetterli-Herley theorem under multiwavelet condition is overall proved in detail. Based on equivalent scalar filters banks, a kind of multiwavelet construction with lifting scheme and corresponding theorem are proposed.

通过介绍基于提升格式构造传统小波的内容,引入基于提升格式构造多小波的研究,对Vetterli-Herley定理在多小波中扩展进行详细全面地证明,提出了一种基于等效标量滤波器组的提升格式构造多小波的实现框架和定理,并通过实例验证该方案的可行性。

The Fourth Construction Company of SINOPEC is a large enterprise directly under theChina Petrochemica l Engineering Corporation and the Grade 1 nationa l constructioncontractor ma inly for petrochemica l construction as well as one of the 33 key large constructionenterprises highly supported by the Ministry of Construction.

中国石化集团第四建设公司是以石油化工工程建设为主的国家工程施工总承包一级企业,是中国石油化工集团直属、国家建设部重点抓好的33家大型建筑企业之一。

At the same time combined with indoor maximum dry density test,this paper discusses the possibility that rock-filling construction quantity .Then data of densification quantity examination under the condition ofdifferent filling material.densification machinery.densification parameter and lay-down thickness are collected as the analytic object. On the basis of making a statistical analysis of experiment data ,supervisory standard and assessment method of settlement difference and settlement ratio that adopted to examine rock-filling embankment construction quantity are put forward systematically At last carrying on settlement observation tests of rock-filling embankment in different construction stage in different layer ,the dependability of assessment method is validated.

同时结合室内最大干密度试验,讨论了表面沉降法作为填石路基施工质量检测手段的可行性和可靠性;然后通过汇总不同填料、不同压实机械、不同压实参数和不同摊铺厚度条件下的压实质量检测数据作为分析对象,在对试验数据进行了统计分析的基础上,较为系统地提出了以沉降沉降差及沉降率作为填石路基施工质量检测指标的评定方法和相应的管理标准值;最后通过对填石路基试验段进行不同填筑时期不同层位的沉降观测试验,验证了评定方法的可靠性。

The construction project primary contractor and the project management way is coming out seasonably in the construction industry long-term developing process, especially in the recent years under a higher situation which construction product being large scale day by day, complicated, and management requests higher.

建设工程的总承包和项目管理方式是在建筑产业的长期发展过程中,特别是在近年来建筑产品日趋大型化、复杂化、管理要求更高的形势下,应时而生的。

Chapter V focuses on the cultural construction of the theory and practice under the new generation of central collective leadership with Hu Jintao as the general sectary in the new stage of 21~ century, and its historical and cultural background, and the strategic position of cultural construction, the basic elements of culture, as well as the characteristics of cultural construction in the stage.

第五章着重阐述新世纪新阶段以胡锦涛为总书记的新一届中央领导集体关于文化建设的理论与实践,阐述了以胡锦涛为总书记的新一届中央领导集体领导文化建设的时代和现实背景、文化建设的战略地位、文化建设的基本内容以及本阶段文化建设的特点。

Part Three: exams the theory forming and developing process of socialistic cultural construction with Chinese characteristics, discusses its scientific connotation and grand significance for this theory, including having been gained the splendent achievements under guided by this theory in the domestic cultural construction in this period, and clarities that, the socialistic cultural construction with Chinese characteristics is the other span-new period in Chinese modern cultural developing history.

第三章:考察了中国特色社会主义文化建设理论形成和发展的过程,论述了这一理论的科学内涵和重大意义,以及在这一理论指导下我国新时期文化建设所取得的辉煌成就,阐明了中国特色社会主义文化建设是中国现代文化发展史上的又一个崭新的阶段。

From the construction aspect, the difficulties of this engineering consists highness of the water table, the inequality of distributing of the stratum, and how to ensure that the six sections open caisson go down successfully and the appearance looks beautiful under the situation of intermixing powder gushing stake, filling clay and so on. Then this paper narrates the selecting of construction scheme, the groundsill dispose and execution technics of the open caisson, the arrangement of construction order during the going down course, the taphole method and the setting and effect of the block sinking board.

从施工方面,本工程的主要难点在于地下水位较高,滑坡后土层分布不均匀,且局部混有粉喷桩基、换填粘土等障碍物情况下,如何保证6段沉井顺利下沉,且连接顺直美观,进而详细阐述了施工方案的选择,沉井群地基处理及制作工艺,下沉过程中的施工顺序安排,出渣方式方法,阻沉板的设置及作用。

Under market economy conditions, there is a construction industry to reflect the true level of construction, scientific, reasonable construction of fixed, or necessary.

在市场经济条件下,有一个建筑行业,以反映真实水平的建设,科学,合理的施工定额,或必要的。

Departments directly under the Joint formulated and issued the "Regulations on the construction industry to properly resolve outstanding issues of foreign labor wages," which defaults to the project due to a result of foreign labor wages in arrears of construction units, as well as the default for no reason, deliberately underpay migrant workers wages of construction enterprises have established severe penalties.

6部门的直接领导下的联合制订并发布了"关于建造业,妥善解决悬而未决的问题的外籍劳工的工资,"默认为,由于该项目的结果外籍劳工工资拖欠的建设单位,以及默认情况下没有任何理由,蓄意underpay民工工资的建筑企业建立了严厉的惩罚。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

第23/57页 首页 < ... 19 20 21 22 23 24 25 26 27 ... > 尾页
相关中文对照歌词
Highway (Under Construction)
Under Construction
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。