查询词典 turbine-engined
- 与 turbine-engined 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The company possesses up-to-date technology of design and manufacture of direct drive wind turbine, first-class manufacturing equipment and excellent management team; it is one of the leading corporations in MW class wind turbines manufacturing industry in China.
公司领有国内当先的直驱式风机设计制作技巧,一流的生产制作设备,优良的经营管理团队,是中国大型风力发电设备制作业的龙头企业。
-
Mita-Teknik develops and produces sophisticated control and monitoring systems for wind turbines in close co-operation with the world's leading wind turbine manufacturers.
Mita-Teknik通过与世界领先的风力发电机制造厂家的紧密合作开,开发和制造出经久耐用的风力发电机的控制器和监控系统。
-
The company possesses up-to-date technology of design a n d manufacture of direct drive wind turbine, first-class manufacturing equipment a n d excellent management team; it is one of the leading corporations in mw class wind turbines manufacturing industry in china.
公司拥有国际领先的直驱式风机设计制造技术,一流的生产制造设备,优秀的经营管理团队,是中国大型风力发电装备制造业的龙头企业。
-
Combined cylinder turbine ; gland leakage ; influence coefficient method ; efficency
合缸机组;轴封漏量;影响系数法;经济性
-
Li Yong'an, Three Gorges Project welcomed in three milestones in 2003, namely water filling of the reservoir, operation of the ship lock and power production of the generating unit; and further in September 2005, the 14 sets of hydro-turbine generating unit (700MW each) of the left-bank powerhouse were all connected on-line for power production; and in May 2006, approximate 10 months ahead of the preliminary design schedule and 2 years ahead of the expectation of the flood control performance, the Three Gorges Dam was completed and fully reached to its designed crest elevation of 185m, able to impound water with the whole structure of dam.
历任清江水电开发公司总经理兼湖北省人民政府副秘书长,中国三峡总公司副总经理。在李永安先生的领导下,长江三峡工程于2003年实现了蓄水、通航和发电三大目标,2005年9月左岸电站14台700MW水轮发电机组全部投产发电,2006年5月三峡主体工程大坝全线到达185米设计坝顶高程,具备全线挡水能力,工期比初步设计工期提前约10个月,提前两年发挥防洪能力。2006年10月,三峡水库蓄水至156米。
-
Understand maintenance procedure of compressor, pump, blower, turbine, tower and heat exchanger etc, and prepare lifting plan accordingly and direct big scale equipment.
了解压缩机、泵、风机、汽轮机、塔、换热器检维修工作程序,根据检修要求制订起重吊装方案并能够指挥吊装大型设备。
-
Understand maintenance procedure of compressor, pump, blower, turbine, tower and heat exchanger etc, and prepare lifting plan accordingly and direct big scale equipment.
了解压缩机、、机、轮机、、热器检维修工作程序,根据检修要求制订起重吊装方案并能够指挥吊装大型设备。
-
Finally, based on the dynamic load chart received by kinetics study on gear transmission system of turbine starter, has a statistic on dynamic load, receives the load spectrum by the method of counting range, then selects S-N curve method and Manson-coffin formula respectively for the fatigue damage calculation and life prediction of the tooth circle.
最后,在对涡轮起动机齿轮传动系统进行动力学分析获得的动载荷历程的基础上,对动载荷进行统计分析,采用幅值计数法获得载荷谱;分别采用S-N曲线法和Manson-Coffin法对涡轮起动机齿圈疲劳寿命进行了预估。
-
Vestas, the world's largest wind turbine maker, is trying to remain on top of aggressive Chinese competitors by localising and customising its products for use in the region.
对于用在中国的产品,全球最大的风力涡轮机制造商维斯塔斯正努力实现本土化和定制化,希望借此保持对积极进取的中国竞争者的领先地位。
-
The flow in an initial condensation stage of low-pressure cylinder of a 200MW steam turbine is analyzed and the phenomena of non-equilibrium condensation are captured.
计算了一实际运行200MW汽轮机组低压缸的初始凝结级内的流动,捕捉到了叶片内的非平衡态凝结现象。
- 相关中文对照歌词
- Turbine
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。