英语人>网络例句>tunnel 相关的网络例句
tunnel相关的网络例句

查询词典 tunnel

与 tunnel 相关的网络例句 [注:此内容来源于网络,仅供参考]

For the present problem of most Xi\'an metro lines passing obliquely through manyactive ground fissure zones,the effect of intersection angle with active ground fissure ofmetro tunnel on metro tunnel lining structure is studied with FEM,and the deformation andfailure characteristics and ranges of influence zones of tunnel are determined.

5针对西安地铁大多数线路斜交穿越地裂缝带的现状,采用有限元数值模拟方法揭示了地铁隧道与地裂缝斜交角度θ对地铁隧道衬砌结构变形破坏的影响规律。

In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.

本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。

The rectangle shaped member mentioned by this article is a prefabricated one for the internal construction of circular tunnel, and is located along tunnel axis line, to be lifted into place by a dedicated crane onboard the shield machine in synchronised manner, followed by placement at both sides of tunnel, of ballast block, or in-situ cast members, corbel, pavement slab and the like.

由于隧道比较长,为节约工期,在盾构机推进的同时,隧道的内部结构也跟进施工,本文所叙述的口字型构件是圆隧道内部结构中的预制构件,它位于圆隧道的中心轴线位置,在同步施工中由盾构机上的专门起重机吊放入位,再于两侧施工压重块、牛腿、路面板等现浇结构。

And the preparing method has the steps of: fixing the charge transfer complex on a scanning tunnel microscope, starting up the cut mode of the scanning tunnel, controlling the motion of pointer of the scanning tunnel, applying a voltage pulse between the charge transfer complex and the pointer, writing the information hole array in the charge transfer complex.

按如下过程进行制备:将电荷转移复合物固定于扫描隧道显微镜上,启动扫描隧道显微镜的刻写模式,控制扫描隧道显微镜的针尖的运动,在电荷转移复合物和针尖之间施加电压脉冲,在电荷转移复合物上写入信息孔阵。

On the basis of the knowledge highway's ruin of the past, in high earthquake intensity area of highway, underground structure may be fall into ruin for the seismic motion, especially, the entrance of tunnel is the weakest of the tunnel. As based on the soil-structure interaction model, adopting the soft of FLAC3D and numerical analysis method, the tunnel entrance has been computed by the elastic and plastic method, the results obtained are discussed and the measures for design and solution are presented.

根据以往的受震破坏经验,在公路隧道的高烈度地震带,地下工程可能会遭受严重震害,尤其洞口段为抗震薄弱区,本文采用FLAC3D软件,从土-结构相互作用模型出发,运用数值分析方法对隧道洞口段进行了三维弹性和弹塑性分析,得出了相应结论,并对结果进行分析,指出隧道抗减震设计中应注意的事项,并提出相应解决措施。

The deformation and failure model of tunnel induced by ground fissure is tensile failure, and tunnel cracks mainly appear in the footwall of ground fissure, but tunnel located in the hanging wall is basically good, which is just adverse to that the damage of buildings or structures on the ground surface caused by the ground fissure mainly in the hanging wall.

地裂缝作用下隧道变形破坏模式为拉张破坏,且隧道衬砌开裂主要出现在下盘距地裂缝14.0 m范围内,而位于上盘的隧道衬砌基本完好,这与地裂缝活动引起土体和地表建筑物的变形破坏主要发生在上盘刚好相反。

When the single pile just exists at the upside of the tunnel crown, the minimum safe distance between pile toe and tunnel crown is half tunnel diameter.

4桩体位于隧道拱顶正上方时,桩端与隧道拱顶间的最小安全距离为0.5倍隧道直径。

In company with nonstop rushing of the long-span tunnel construction, a matterstation encounter more and more. For instance, the demand of the present design and construction code is already insatiability with the need of long-span tunnel engineering design and construction. And both domestic and foreign concerned research output is not too much to refer. So the engineering design and construction on long-span tunnel has definite blindness of the approve use for reference.

随着大跨度隧道建设的不断涌现,所遇到的问题也越来越多,比如现行的设计与施工规范已经不能满足大跨度隧道设计与施工的需要了,但国内外有关的研究成果并不多,可借鉴的设计与施工经验较少,大跨度隧道的设计与施工带有一定的盲目性。

Tunnel project started from the end of July 2009, has been the company's leaders are most concerned about one of the items. No. 1 tunnel construction more smoothly, was run through January 13 of this year. No. 2 tunnel construction process, there are many uncertain and unpredictable factors, imports of concrete lining of 228 meters, the rock formation is marl, landslides serious digging edge to edge supporting, progress is slow.

隧道工程自2009年7月底开工以来,一直是公司领导最关心的项目之一。1号隧道施工比较顺利,已于今年1月13日贯通。2号隧道施工过程中,存在很多不确定和不可预见因素,进口砼衬砌228米,岩层是泥灰岩,塌方严重,采取边挖边支护,进展缓慢。

A software for aided designing bolt of tunnel named ANSYSBOLT was designed on the basis of ANSYS finite element software. In the software environment, bolt supporting model of physical tunnel in tectonic stress field was structured according to physical parameters of coal and rock seam of some working face, and in conditions of different buried depth, bolt supporting structure and pre-tightening force, distributions of stress of surrounding rock of physical tunnel and its displacement were analyzed and calculated by ANSYSBOLT software. Then influence of different buried depth, bolt supporting structure and pre-tightening force on stability of roof and floor of tunnel was analyzed and finally feasible scheme of bolt supporting was gotten according to the analysis result.

在ANSYS大型有限元软件基础上开发了巷道锚杆辅助设计软件ANSYSBOLT;在该软件环境下,根据某工作面煤岩层的物理参数,建立了构造应力场条件下的实体巷道锚杆支护模型,并按照不同的埋藏深度、锚杆支护结构和预紧力条件,经软件分析计算,得出了实体巷道围岩应力及位移分布情况,进而分析了不同埋藏深度、锚杆支护和预紧力条件对巷道顶底板稳定性的影响,最终根据分析结果得出了可行的锚杆支护方案。

第5/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Tunnel Of Love
Tunnel Of Love
Tunnel Of Love
Light At The End Of The Tunnel
Tunnel Of Love
The Carpal Tunnel Of Love
Tunnel
"A Tunnel Into Muck"
Tunnel Vision
Bridge And Tunnel
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。