Article 6 To obtain a work safety license, an enterprise shall satisfy the following work safety conditions:(1)Having established and improved the responsibility system for work safety,and formulated a whole set of work safety regulations and operating rules;(2)Its investment In safety Is up to work safety requirements;(3)Having set up administrative entities for work safety and installed full-time work safety administrative personnel;(4)The major person-in—charge and work safety administrative personnel have passed the appraisal;(5)The special personnel have passed the appraisal conducted by the competent authority, and have obtained qualification certificates for special operations;(6)The workers have gone through work safety education and training;(7)Having workers insured against work—related injuries in accordance with the law and having paid insurance premiums in this regard;(8)Its premises,worksites,safety facilities,equipment and technology are up to the requirements of the relevant work safety laws,regulations,standards and rules;(9)Having preventive measures against occupation hazards and providing workers with labor protection articles which are up to the national standards or standards of the industrial sector concerned;(10)Having conducted safety evaluation in accordance with the law;(11)Having measures for the testing,assessment and monitoring of sources of grave danger, as well as emergency plans thereabout;(12)Having emergency rescue plans for work accidents,and entities or personnel specialized in emergency rescue.and having necessary emergency rescue materials and equipment; and (13)Satisfying other conditions as provided by laws and regulations.
第六条 企业取得安全生产许可证,应当具备下列安全生产条件:建立,健全安全生产责任制,制定完备的安全生产规章制度和操作规程;设置安全生产管理机构,配备专职安全生产管理人员;主要负责人和安全生产管理人员经考核合格;主要负责人和安全生产管理人员经考核合格;特种作业人员经有关业务主管部门考核合格,取得特种作业操作资格证书;从业人员经安全生产教育和培训合格;依法参加工伤保险,为从业人员缴纳保险费;厂房,作业场所和安全设施,设备,工艺符合有关安全生产法律,法规,标准和规程的要求;有职业危害防治措施,并为从业人员配备符合国家标准或者行业标准的劳动防护用品;依法进行安全评价;有重大危险源检测,评估,监控措施和应急预案;有生产安全事故应急救援预案,应急救援组织或者应急救援人员,配备必要的应急救援器材,设备;法律,法规规定的其他条件。
-
In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.
本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。
-
Self-introduction of the Presenter Mr Hsieh Y Shan, Director of Business Department 2 at RSEA Engineering Co. was in 1972 graduated and conferred Bachelor of Civil Engineering, then Master of Geotechnic Engineering.In 1982, studying in Austria the NATM method for 6 months. In 1983, he was conferred Engineering Award for Distinguished Youth by Engineers Society. Engaged in relevant tunnel work for 33 years, he managed the construction of Hsueh Shan tunnel, by taking responsibility of breakthrough of pilot tunnel and two main tunnels.
谢玉山先生,台湾荣民工程股份有限公司业务二处处长。1972年获土木工程学士,同年高考及格兼取得土木技师,1987年获亚洲理工学院大地工程硕士。1982年赴奥地利专题研究新奥隧道工法6个月。1983年获中国工程师学会优秀青年工程奖状。
-
At present, in the production craft of construction ceramics, generally has used the more advanced tunnel kiln to fire the craft, carries on in the process in the use tunnel kiln which fires, fixed time and fixed point completes goes against the vehicle work is the guarantee fires one of quality important methods, this article carries on the discussion on the entire tunnel crown vehicle craft PLC control.
摘 要:目前,在建筑陶瓷生产工艺中,已普遍采用了较为先进的隧道窑烧成工艺,在使用隧道窑进行烧成的过程中,定时、定点地完成顶车工作是保证烧成质量的重要手段之一,本文就整个隧道窑顶车工艺的PLC控制进行探讨。
-
At present, in the production craft of construction ceramics, generally has used the more advanced tunnel kiln to fire the craft, carries on in the process in the use tunnel kiln which fires, fixed time and fixed point completes goes against the vehicle work is the guarantee fires one of quality important methods, this article carries on the discussion on the entire tunnel crown vehicle craft PLC control.
引言目前建筑陶瓷行业普遍采用的是隧道窑烧成工艺,在使用隧道窑进行陶瓷烧制的过程中,除了严格控制各被控点的温度和压力等物理参数外,精确、准时地完成顶车、回车等循环过程,也是保证烧成质量的必要环节,随着计算机技术的发展,特别是可编程逻辑控制器技术的广泛应
-
For the present problem of most Xi\'an metro lines passing obliquely through manyactive ground fissure zones,the effect of intersection angle with active ground fissure ofmetro tunnel on metro tunnel lining structure is studied with FEM,and the deformation andfailure characteristics and ranges of influence zones of tunnel are determined.
5针对西安地铁大多数线路斜交穿越地裂缝带的现状,采用有限元数值模拟方法揭示了地铁隧道与地裂缝斜交角度θ对地铁隧道衬砌结构变形破坏的影响规律。
-
The rectangle shaped member mentioned by this article is a prefabricated one for the internal construction of circular tunnel, and is located along tunnel axis line, to be lifted into place by a dedicated crane onboard the shield machine in synchronised manner, followed by placement at both sides of tunnel, of ballast block, or in-situ cast members, corbel, pavement slab and the like.
由于隧道比较长,为节约工期,在盾构机推进的同时,隧道的内部结构也跟进施工,本文所叙述的口字型构件是圆隧道内部结构中的预制构件,它位于圆隧道的中心轴线位置,在同步施工中由盾构机上的专门起重机吊放入位,再于两侧施工压重块、牛腿、路面板等现浇结构。
-
And the preparing method has the steps of: fixing the charge transfer complex on a scanning tunnel microscope, starting up the cut mode of the scanning tunnel, controlling the motion of pointer of the scanning tunnel, applying a voltage pulse between the charge transfer complex and the pointer, writing the information hole array in the charge transfer complex.
按如下过程进行制备:将电荷转移复合物固定于扫描隧道显微镜上,启动扫描隧道显微镜的刻写模式,控制扫描隧道显微镜的针尖的运动,在电荷转移复合物和针尖之间施加电压脉冲,在电荷转移复合物上写入信息孔阵。
-
On the basis of the knowledge highway's ruin of the past, in high earthquake intensity area of highway, underground structure may be fall into ruin for the seismic motion, especially, the entrance of tunnel is the weakest of the tunnel. As based on the soil-structure interaction model, adopting the soft of FLAC3D and numerical analysis method, the tunnel entrance has been computed by the elastic and plastic method, the results obtained are discussed and the measures for design and solution are presented.
根据以往的受震破坏经验,在公路隧道的高烈度地震带,地下工程可能会遭受严重震害,尤其洞口段为抗震薄弱区,本文采用FLAC3D软件,从土-结构相互作用模型出发,运用数值分析方法对隧道洞口段进行了三维弹性和弹塑性分析,得出了相应结论,并对结果进行分析,指出隧道抗减震设计中应注意的事项,并提出相应解决措施。
-
The deformation and failure model of tunnel induced by ground fissure is tensile failure, and tunnel cracks mainly appear in the footwall of ground fissure, but tunnel located in the hanging wall is basically good, which is just adverse to that the damage of buildings or structures on the ground surface caused by the ground fissure mainly in the hanging wall.
地裂缝作用下隧道变形破坏模式为拉张破坏,且隧道衬砌开裂主要出现在下盘距地裂缝14.0 m范围内,而位于上盘的隧道衬砌基本完好,这与地裂缝活动引起土体和地表建筑物的变形破坏主要发生在上盘刚好相反。
- 相关中文对照歌词
- 30 Seconds
- The Tunnel
- Tunnel Vision
- Tunnel Vision
- Work
- Work
- Jesus Can Work It Out
- The Work
- Ritalin (Born In America)
- Work
- 推荐网络例句
-
Metrorrhagia is also gynaecological problems of common diseases.
崩漏是妇科常见病也是疑难症。
-
WordFTP gives you the convenience and timesaving you need.
wordftp让您的方便和省时您所需要的。
-
These kinds of investments collect growingly large institution assets and individual savings to the capital market.
资产管理业务需要创新,创新分为市场创新和管理模式创新两种。