Finally we set up three - dimensional space model to simulate the space effect during tunnel construction , analyze the transaction between the left runnel and the right tunnel , and also analyze the deformation and stability of mid - partition
最后建立了三维空间模型,对连拱隧道开挖时的空间效应、左右洞的相互影响,以及中隔墙的变形和稳定性进行了模拟分析。
-
Finally , author analyzed and compared these two schemes on the aspects of technology and economy according to the wholly structure optimizing process and outcome, and recommended the final scheme of the right banks diversion tunnel of Gongboxia Power Station reconstructed into a horizontal swirling flow internal dissipater tunnel.
最后根据整个体型优化过程与结果,从技术与经济对比分析两个方面,对公伯峡右岸旋流泄洪洞进行了选型研究与方案比较,提出了公伯峡水电站右岸旋流内消能泄洪洞的最终推荐方案。
-
The application of smoothwall blasting in crushed surrounding rock of No.2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters,adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively,etc.
文摘:在周家山2号隧道破碎围岩施工中,应用光面爆破技术,通过选择合理的爆破参数,正确的支护施工方法,有效地控制隧道的超欠挖,加快掘进速度,取得了较理想的效果。
-
Based on systematic analysis of various desilting methods by using existing reservoirs, the paper puts forward an overall thinking of desilting system of auto-suction pipe of the Xiaolangdi Reservoir, i.e. to automatically discharge the deposited fine sands within about 40 km area in foreside of the dam through dam tunnel or tunnel on the right bank of mountain by placing a removable and lengthable pipe equipped with a suction head in the near dam section of the reservoir area.It can discharge 300 million tons sediment each year by preliminary estimation.
在系统分析已建水库各种排沙方式的基础上,提出了小浪底水库自吸式管道排沙系统总体思路,即利用水库自然水头,在近坝段库区内铺设可移动并带有吸泥头、可逐渐加长的管道,自动地将坝前约40 km范围内淤积的细颗粒泥沙和通过过坝隧洞或右岸山体内的隧洞排出库外,初步估算每年可排出泥沙3亿t。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
-
You've all heard the expression,"light at the end of the tunnel," right?
您听取了所有的表达,&光在隧道的尽头,&对不对?
-
During the construction of a shallow asymmetry double-arch tunnel,the right tunnel near the inner of mountain has been excavated firstly,and then the left tunnel near the exterior of mountain excavated.
某浅埋偏压连拱隧道中导洞开挖中隔墙浇筑后,对靠近山体内侧的右洞先行开挖和支护,再进行靠近山体外侧的左洞的开挖,右洞二衬出现部分地段纵向开裂。
-
A large 3D numerical model of forked tunnel is set up and different construction processes are simulated by D-FEM. Through analyzing displacement, stress and damage yield zone of tunnel surrounding, the optimum construction process that left tunnel excavates ahead of right tunnel 32 m is determined, left tunnel and right tunnel excavate synchronously is proposed.
建立了分岔隧道大型三维数值模型,采用弹塑性损伤有限元D-FEM模拟了分岔隧道不同的施工过程,通过分析施工过程中隧道围岩的位移、应力和损伤屈服区,最终确定采用左洞超前右洞32m,左右洞同步开挖的施工方法。
-
Based on long-term monitoring convergence deformation of Wuqiaoling deep-buried long tunnel, this paper analyzes convergence deformation regularity of two parallel main tunnels. Results show the left main tunnel's convergence obviously exceeds that of the right, because the right main tunnel's construction absorbs the experience of the left main tunnel. Furthermore, authors research on rheology rule of Wuqiaoling tunnel by FLAC(superscript 3D). Numerical analysis result basically is consistent with actual measurement result. Finally, 6 principles to dispose soft wall rock rheology are presented.
首先,在对乌鞘岭深埋长隧道进行长期围岩收敛变形的基础上,分析乌鞘岭深埋长隧道左、右主洞的收敛变形规律,其研究结果表明左线主洞的收敛变形均大于右线主洞,这是由于进行右线主洞施工时吸取了左线施工的经验;然后,利用FLAC(上标 3D)对乌鞘岭深长隧道软弱围岩流变进行数值研究,数值分析结果与实测结果较为一致;最后,提出对软弱围岩流变进行工程治理的6条原则。
-
Based on long-term monitoring convergence deformation of Wuqiaoling deep-buried long tunnel, this paper analyzes convergence deformation regularity of two parallel main tunnels. Results show the left main tunnel's convergence obviously exceeds that of the right, because the right main tunnel's construction absorbs the experience of the left main tunnel. Furthermore, authors research on rheology rule of Wuqiaoling tunnel by FLAC^3D. Numerical analysis result basically is consistent with actual measurement result. Finally, 6 principles to dispose soft wall rock rheology are presented.
首先,在对乌鞘岭深埋长隧道进行长期围岩收敛变形的基础上,分析乌鞘岭深埋长隧道左、右主洞的收敛变形规律,其研究结果表明左线主洞的收敛变形均大于右线主洞,这是由于进行右线主洞施工时吸取了左线施工的经验;然后,利用FLAC^3D对乌鞘岭深长隧道软弱围岩流变进行数值研究,数值分析结果与实测结果较为一致;最后,提出对软弱围岩流变进行工程治理的6条原则。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?