查询词典 tunnel
- 与 tunnel 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Geological condition is the important factors in study on tunnel excavating disaster inevitably. From the aeolotropy of hard rock of tunnel engineering region, the stress distribution of several kinds of fault to the water gushing of tunnel, the type of geology disaster involved in macrocharacter, main control factors, disaster mechanism and control strategy in tunnel excavating are studied systematically in this thesis.
中文题名隧道开挖地质灾害规律与防治对策研究副题名外文题名 Study on tunnel excavating geology disaster regular and control trategy 论文作者杜炜平导师古德生院士学科专业岩土工程研究领域\研究方向学位级别博士学位授予单位中南大学学位授予日期2001 论文页码总数108页关键词隧道工程地质灾害岩爆馆藏号BSLW /2003 /U45 /1 隧道开挖灾害研究必然以地质因素为其主要研究对象。
-
If you don't, you could damage your eyes and develop a problem called Carpal Tunnel Syndrome in your wrists.
而如果你不这么做的话,你的视力可能受损,且手腕会得被称作Carpal Tunnel综合症的疾病。
-
The selection of geological prospecting in different stages(initial-prospecting, detailed-prospecting)(2)the selection of geological prospecting in the deep-laid and shallow-laid of tunnel project (3)the selection of geological prospecting of tunnel projecting in different geological conditions Finally, the author summed up main problems needing to be solved in tunnel engineering geological prospecting as follow:(1)differentiate stratum and find out the depth and thickness of different stratums in the tunnel section (2)find out geological structure and existence situation of fault, broken zone and weak plane (3)find out weathering level of bed rock to classify surrounding rock combining speed materials (4)differentiate stratum structure of the entrance of tunnel to judge the stability of it (5)find out existence situation and performance of ground water (6)situations of other harmful geological phenomenon In view of above problems and classification of surrounding rock, the author showed principles of rational choosing of methods in geological prospecting and counted disperse range of physical character parameter value in different petrosal character, getting achievements as follow:(1)summarization of effect, merits and demerits of different geological prospecting methods in the tunnel geological investigation (2)method selection and arrangement principle of tunnel engineering geological prospecting in different geological conditions and prospecting stages (3)According to previous experience and cases, the author concluded the物性parameters most in use ,and showed the basis of selecting geological prospecting methods in different geological conditions.
论文中用几个应用实例来说明:(1)不同勘察阶段物探工作的选用;(2)深埋、浅埋隧道工程物探工作的选用;(3)不同地质条件隧道工程物探工作的选用。最后总结归纳出隧道工程物探所需要解决的问题主要有:(1)划分地层,查明隧道通过剖面的各地层深度与厚度。(2)查明地质构造,隧道轴线段有无断层、破碎带、软弱层面等。(3)查明基岩风化程度,从而结合速度资料进行围岩分级。(4)划分洞口地层结构,判断洞口稳定性。(5)查明地下水赋存情况及其活动动态。(6)其他不良地质现象存在情况。针对上述需要查明的地质问题与计算围岩分级情况,论文提出合理选用物探方法的原则,并统计了物性参数值在不同岩性中的分布范围。得出以下研究成果:(1)总结出各物探方法在隧道地质调查中的作用和优缺点。(2)得出不同地质条件下和不同勘察阶段,隧道工程物探方法选择和布置的原则。(3)根据以往工作经验和事例,对常用的物性参数进行了归纳总结,同时介绍了不同地质条件下物探方法选择的依据。
-
But everyone at the table has a job to do, and they were doing it. So the group sat and sat, looking glamorous, and after a while, they got in Mr. Roque's limousine and went to the Tunnel, where Mr. Roque danced dispiritedly with one of the girls and then realized he was bored up to his eyeteeth and went home alone.
但是席间的每个人都似乎有事可做,并乐于此道,于是这群人就这么极具魅惑地干坐着,过了一阵子,他们一同坐上Roque先生的豪华轿车前往Tunnel, Roque先生无精打采地和其中一个女孩跳了一会儿舞,而后感觉到自己实在是烦的要命了,才独自一人打道回府。
-
Their stupidity, their flakiness, their lack of values, their baggage, says Jack, Modelizers inhabit a sort of parallel universe, with its own planets(Nobu, Bowery Bar, Tabac, Flowers, Tunnel, Expo, Metropolis) and satellites(the various apartments, many near Union Square, the big modeling agencies rent for the models) and goddessesLinda, Naomi, Christy, Elle, Bridget.
Jack说。"模特狂"们生存在一个与我们的世界并行的宇宙里,拥有自己的行星(Nobu, Bowery Bar, Tabac, Flowers, Tunnel, Expo, Metropolis,自己的卫星(各式各样Union Square附近的,知名经纪人为模特们租下的公寓),以及自己的女神(Linda, Naomi, Christy, Elle, Bridget这些模特们
-
Though the load analysis on the tunnel roof wall-rock in the fault footwall tunnel, this paper solves the problem of the tunnel support of tunneling through the great fault; and though the load analysis on the corresponding wedge of the lower abandoned tunnel, solves the problem of the influence of the lower abandoned tunnel on the upper tunnel floor.
通过对断层下盘巷道顶板围岩的受力分析,解决了煤巷掘进过大断层的巷道支护问题;通过对下部废巷道对应的楔形体的受力分析,解决了下部废弃巷道对上部巷道底板的影响问题。
-
In this paper, resource and feature of three-dimensional data model to the arch tunnel and interior installation are mainly researched; design thinking of the arch tunnel model is given out; algorithms of three-dimensional model about tunnel body and the joint part of the adjacent to tunnel body are achieved; in addition, relevance algorithms of texture mapping technology to interior in tunnel body and three-dimensional model of interior installation of tunnel are also researched.
主要研究了拱形巷道及其内部设备三维建模的数据来源和特点;给出了拱形巷道建模的设计思路;研究了实现巷道体和相邻巷道体之间连接处三维建模的算法;另外也研究了实现巷道体内部纹理贴图技术及巷道内部设备三维建模的相关算法;研究了实现三维巷道漫游的算法。
-
Objective:To assess the significance of nerve conduction velocity measuring in diagnosing early cubital tunnel syndrome.
目的:探讨肘管神经传导速度测定对早期肘管综合征(cubital tunnel syndrome, CuTS)的诊断价值。
-
To the problem of the Tunnel technology influences to speed and unfits to configure Tunnel s inner network by internet, puts forward a method that appending the information in router table to implement Tunnel and adding Tunnel table, instead of Tunnel server card.
对VPN实现的Tunnel技术影响转发速度,不适合通过Internet配置Tunnel的内部网络系统的问题,提出了在路由表中添加用于实现Tunnel的信息表和增加Tunnel表,来取代Tunnel server card的解决办法。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
- 相关中文对照歌词
- Tunnel Of Love
- Tunnel Of Love
- Tunnel Of Love
- Light At The End Of The Tunnel
- Tunnel Of Love
- The Carpal Tunnel Of Love
- Tunnel
- "A Tunnel Into Muck"
- Tunnel Vision
- Bridge And Tunnel
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?