查询词典 tubular girder
- 与 tubular girder 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This paper introduces the anchor design principle and calculation method of the crane girder on cliff wall in Huizhou pump and storage water power station,especially analyses the prototype observation and discusses the relating questions for the anchor design.
简要介绍惠州抽水蓄能电站工程岩壁吊车梁的锚杆设计原则和计算方法,重点对原形观测资料进行分析,并对岩壁吊车梁锚杆设计的有关问题作了探讨。
-
About 300T road repairing, we will continue perform. TIMAS can use the 300T crane to hoist coal mill for about 1 or 2 days, which needs acceleration. Before plate girder lifting, cranes need to be changed the lifting condition and check.
关于300t 路面修整,我方会继续修复。300t 吊车 Timas 还可使用1-2天吊装磨煤机,但需要抓紧时间,大板梁吊装前,吊车需要改工况及检修。
-
The result shows combination using of lead rubber bearing and seismic restrainers can not only eliminate the usual defects of curved PC box girder bridge,but can also avoid the negative effect that caused by seismic restrainers,so it is deserved to make popularized.
结果表明:将铅销橡胶支座与常用限位辅助设计结合应用,既可以减轻常见病害,同时避免了限位装置带来的不利影响,值得推广应用。
-
Then, the construction techniques of R.C girder transfer floor in high-rise buildings are systematically investigated, three important item about construction of transfer floor: the form board and the carriage system, the joining and colligation of reinforcing steel bars, the casting of large volume concrete are partially analyzed and studied, otherwise, the design principle of the supporting system, the main point on connection of the reinforcing bar and the crack control measures of mass concrete are proposed.
然后,系统的研究了高层建筑钢筋混凝土梁式转换层的施工技术,重点对梁式转换层施工的三大分项:模板和支撑体系、钢筋的连接和绑扎、大体积混凝土的浇筑进行了分析和研究,并提出了支撑体系的设计原则,钢筋的连接要点和大体积混凝土裂缝的控制措施。
-
But the steel box girder is typical space thin-walled bars, because of bending-torsion coupling and steel curved box bridge distribution of stress is relatively more complicated even under dead load, so it is necessary to distribute emulation analysis to the real stress of curved box bridge.
但是钢箱梁是典型的空间薄壁杆件,由于弯一扭耦合作用,曲线钢箱梁即使在恒载作用下其应力的分布也比较复杂,因此有必要对曲线钢箱梁实际的应力分布进行仿真分析。
-
The methods of plane arrangement and checking of bowl-button steel scaffold were demonstrated in detail based on the engineering construction of cast-in-place Continuous beam in Houyan Cross-bridge of Shenda Highway. In addition, the methods of communicating the length of U-tray and adjusting the gradient have been given. It is pointed out that original pod can adjust the greater longitudinal or tranverse grade in the box-girder construction and welding-steel-bar can reduce partial compression.
通过后盐立交桥连续箱梁施工这一工程实例,详细论述了碗扣式钢管脚支架的平面布置方法及受力验算方法,提出了碗扣式钢管脚支架的U托旋出长度的计算方法及纵横坡的调整方法,并指出采用找零立杆的方法可以解决较大纵横坡度箱梁的施工问题;采用贴焊钢筋的方法可以解决U托偏心受压的间题。
-
The project used in conjunction with three holes of a prestressed continuous box girder design, layout for cross-bridge 30m +30 m +30 m, two-way four-lane bridge to meet current conditions, after the completion of the construction of the bridge under the bridge to meet the 8-lane two-way traffic conditions.
本工程采用三孔一联预应力连续箱梁设计,桥跨布置为30m+30m+30m,桥上满足双向四车道通行条件,建设完成后满足桥上桥下双向8车道的通行条件。
-
In the paper,the equations of motion for the vehicle_bridge_MTMD system are presented and the effectiveness of suppressing the transverse vibration of the deck steel plate girder bridge with multiple tuned mass dampers is investigated by the field test and simulated calculation.
本文建立了车-桥-MTMD系统振动方程,对利用多重调频质量阻尼器抑制铁路上承钢板梁桥横向振动的效果进行了模拟计算和现场试验。
-
With the theory of energy random analysis of train derailment, the security of moving train on up line and down line of Laoluanhe bridges is analyzed contrastively, and the influence on improving resisting derailment ability of bridges by widening the distance between two main beams of the deck steel plate girder bridge is studied.
进一步运用列车脱轨能量随机分析理论,对比分析了老滦河桥上、下行线上的列车走行安全性,分析了增大钢板梁主梁中心距对提高桥梁抗脱轨能力的影响。
-
Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge,conclusions are made as follows:with static reinforcing,the vibration amplitude can be suppressed to some extent,but quasi-resonance of the bridge can not be avoided,moreover,the construction is inconvenient and costly.
通过对目前抑制铁路上承式钢板梁桥横向振动的几种方案进行定性的分析和比较,认为:静力加固方案可以使桥梁振幅有所减小,但不能避免准共振现象的发生,而且工程造价较高,施工也不方便;两桥连接方案减振效果明显(减振率近50%),比较经济也比较方便,但同样不能避免准共振现象的发生;动力减振方案可以有效的抑制桥梁的准共振现象(现场试验中减振率达51.83%),而且工程造价较低,施工简单、方便。
- 相关中文对照歌词
- Crazy
- Nobody Loves A Riveter
- Uh Oh
- Mr. Popeil
- Every Girl (Wants My Guy)
- Trillionaire
- Taking My Ball
- Skeleton Song
- Far Above The Clouds
- 推荐网络例句
-
Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.
目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。
-
On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.
一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。
-
What is the topic sentence of this article?
这篇文章中心的句子是那一句?