英语人>网络例句>trussing bed 相关的网络例句
trussing bed相关的网络例句

查询词典 trussing bed

与 trussing bed 相关的网络例句 [注:此内容来源于网络,仅供参考]

Vi.上床,分层 apple-pie bed be brought to bed confined to one's bed die in one's bed feather bed flock bed get up on the wrong side of the bed get out of bed on the wrong side go to bed go to bed in one's boots keep one's bed keep to one's bed leave one's bed lie on the bed one has made lie in the bed one has made lie on a bed of thorns make one's make one's bed bed and lie on it make one's own bed make one's own bed and lie on it make the bed make a bed narrow bed narrow cell narrow house narrow home put to bed put to bed with a shovel stretch on the Procrustean bed

发生性关系;付印喝得大醉早睡早起因病躺在床上因病躺在床上病愈起床自作自受自作自受如坐针毡;坐立不安自作自受自作自受自作自受自作自受整理床铺整理床铺坟墓坟墓坟墓坟墓使睡;将扣紧准备印刷;准备编排直至印刷为止埋葬,下葬;扶送回家上床按照同一标准判断;强求一致 24 As you make your bed, so you must lie on it。

Even the trussing differs from usual trussing and considers the demands of decoration in general.

甚至是考虑到作为总体装饰需要的与通常的桁架不同的桁架。

The wind tunnel experiment,project argument,structure calculation analysis, calculation of the joint bearing capacity, calculation and experiment of the support-joint load carrying capacity of a super-span stretched stereoscopic steel pipe trussing are introduced- A normal usage period of the project after it had been built indicates that the major trussing and the supporting structure below have enough bearing capacity and deformability, and meet the demands of design code and actual usage.

摘要]介绍了某超大跨度伸臂立体管桁架结构的风洞试验、方案论证、结构计算分析、节点承载力验算、支座节点承载力验算和试验等。该结构建成后一段时期的正常使用表明,工程的主体桁架和下部承力结构具备较强的承载变形能力和可靠的安全度,满足设计规范和实际使用要求。

And opposite, the downstream unsubstitutability's market enhancement , advantage of status of products strengthen the unsubstitutability and market advantage status. These forms of expression of limiting the competition behavior are as follows, utilize the market advantage position, set up and strengthen the barrier of the application program or operating system procedure barrier, utilize OEM to put the software and squeeze the rival in advance, discriminatory pricing policy, pairing unsalable up with goods that sell well or trussing up and sells the behavior , lures the ICP into adopting specific technology, and technology the can only in specific customer serve and function, with the way of trussing up with the ISP.The copyright ill-useing happens frequently .

软件产业中的不正当竞争行为大多都与软件著作权的滥用有关,并且通常与滥用市场优势地位结合在一起,既有横向限制竞争行为,又有纵向限制竞争行为,且以纵向限制竞争行为为主,常表现为一种产品的不可替代性、市场优势地位往往会加强其上、下游产品的不可替代性和市场优势地位,而相反,其上、下游产品的不可替代性和市场优势地位的增强又进一步强化这种产品的不可替代性和市场优势地位。

The results show that the decalescence of catalyst bed affects the process of hydrogen peroxide catalytic decomposition greatly. If the catalyst bed is preheated or made up of materials with low thermal conductivity, that influence can be depressed. At the same time, the response characteristic of catalyst bed and the efficiency of catalytic decomposition can be improved. The low frequency pressure instability of catalyst bed occurs because of the coupling of catalytic decomposition and supplying. The decomposition plane pushes all the way through the catalyst bed during pressure oscillations, causing unreacted liquid hydrogen peroxide to be exhausted from the bed and leading to the appearance of liquid hydrogen peroxide channeling. Consequently, how to prevent or at least limit this channeling is the key to eliminate the pressure instability of catalyst bed. It was found that adding clapboard to the catalyst bed can depress the pressure instability efficiently.

结果表明催化剂床及催化剂的吸热对过氧化氢分解过程影响很大,对催化剂床进行预热或采用热导率低的材料制造催化剂床等措施,可以降低催化剂床壁面吸热对催化分解过程的影响,提高催化剂床的响应特性和催化分解效率;催化剂床的低频不稳定是催化分解过程与供应系统耦合产生的,催化剂床气体界面的波动过程中,液体过氧化氢穿透催化剂床形成过氧化氢液体通道,过氧化氢液体通道的产生和扩大是催化剂床不稳定的主要原因,也是消除催化剂床不稳定的关键,试验中在催化剂床内加入分流板成功地抑制了催化剂床的低频不稳定。

Switch can be adjusted back up hand-held point of view (maximum 80 degrees) and leg drop angle (100 degrees);◆ foot bed lowest point from the ground 130mm, the highest point of the bed from the ground 680mm; also elevated bed of different heights;◆ bed in back with plexiglass plate, the user can seat on the bed for X-ray;◆ aluminum fence, can also choose to use push-pull PP flip rail or fence;◆ lift back, the waist angle of tilt, to prevent the sliding body;◆ by about 2 degrees of seat angle;◆ foot can be bent 100 degrees and can easily get out of bed from the bed and sat up and on;◆ foot horizontal position may rise higher than the height of 120mm;◆ with quiet casters with brakes and can be locked and lifted;◆ durability, operational quality, improved operating performance moving bed;◆ equipped with ABS headboard can be instantly demolished;◆ electric device of high quality fully enclosed permanent magnet DC control system;◆ low noise, high safety, long life;◆ new materials with polyester fiber mattresses;◆ can also choose to use low-rebound double-foam mattress or mattress waterproof material;◆ has good air permeability and durability.

可用手持开关任意调节背部上升角度(最大80度)和腿部下降角度(最大100 度);◆脚部床面最低处离地面130mm,床面最高处离地面680mm;还可升高床面不同高度;◆床体背部采用有机玻璃板,使用者可以座在床上进行X光检查;◆采用铝合金护栏,还可选择采用PP翻动护栏或推拉式护栏;◆抬升背部时,腰部有一定角度的倾斜,为防止身体的滑动;◆采用了约2度的座角;◆足部可以100度弯曲,能够很方便从床上坐起和上下床;◆足部可上升高度比水平位置高120mm;◆采用静音带刹车的万向脚轮,并能进行锁定和解除;◆耐久性、操作性优良,提高了病床搬运的作业性能;◆配有ABS床头板可瞬间拆卸;◆电动装置采用优质永磁直流全封闭式控制系统;◆噪音低、安全性高、使用寿命长;◆配有聚脂纤维新材料床垫;◆还可选择采用低反弹的双层海绵床垫或防水材料床垫;◆具有良好的透气性和耐用性。

In different conditions on fluidized state and stability of conical fluidized bed. The conlusions are: the conical angel of the conical fluidized bed is 20°, the fluidized state havesmall difference in conical distributor and distributor plate. The angle of conical bed increase,the fluidized state will have big difference. The angle is 60°and the conical as distributor, themass of fluidized is less, the most of material is the bottom of conical bed. The effect ofdistributor plate is much better than the conical distributor. Sawdust and rice hull can fluidize.The annular gap of conical distributor different, the angle of conical bed is same, the fluidizedquality of 10mm annular gap is better than the other conical distributors. The annular gap ismore wide, the conical bed have more slugging phenomenon and the pressure fluctuate is turnbig.In the experiment the flow of 2%and 4%distributor plates don\'t easy to control, becausethe pressure is very big and the pressure fluctuate of conical bed is too big.

在不同的条件下对锥形床的流化状态和稳定性进行了研究,结果得出:锥形床的锥角为20度时,分布锥和分布板的流化状态相差不明显,随着锥形床锥角的增大,分布锥和分布板的流化现象会出现明显的变化,锥形床锥角越大,分布锥的流化状态变化越明显,流化的的物料越少,大量物料都聚集在锥形床底部,而分布板在加料量少的情况下,能流化起来。10mm、15mm和20mm环隙分布锥在锥形床锥角相同条件下,10mm环隙分布锥的流化质量要好于其它两个分布锥,环隙越大越容易出现腾涌现象的产生,压降波动范围增大。2%、4%和6%开孔率分布板在本实验测定时,2%和4%开孔率分布板的流量不容易调节,同时产生的压降波动范围也很大,比较来说,6%开孔率分布板流化质量好些。

The multifunctional overturn bed has one bed frame with one side connected to the bed head and the other side connected to the bed tail, one leftwards overturn unit set to the left side of the bed frame, one rightwards overturn unit set to the right side of the bed frame, and one translation unit set between the leftwards overturn unit and the rightwards overturn unit.

本发明床身框架(3)的一侧与床头(4)固定连接,床身框架(3)的另一侧与床尾(2)固定连接,左侧位翻身装置设置在床身框架(3)内的左侧,右侧位翻身装置设置在床身框架(3)内的右侧,平移装置设置在左侧位翻身装置和右侧位翻身装置之间的床身框架(3)内。

A place where one may sleep; lodging:found bed and board at an inn.a maternity ward with 30 beds.drank milk before bed.(7) A place for lovemaking.(8) A marital relationship with its rights and intimacies.a flower bed.a clam bed; an oyster bed.(11) The bottom of a body of water, such as a stream.(12) A supporting, underlying, or securing part, especially:tomatoes on a bed of lettuce.

默认会在英汉简明词典和汉英简明词典等基本词典中查找,如果希望在更多专业词典中查找,请在输入词或短语后点击选择词库,在下面的词典列表中选中要在其中查找的词典左侧的复选框,然后点击"查询"即可。

The device for separating and recovering the carbon dioxide from the flue gas by dry process consists of a powder grinding device, a powder feeding device, a fluidized bed, a cyclone separator and a regeneration device, wherein, a flue gas inlet is arranged at the bottom of the fluidized bed, the powder grinding device is communicated with the lower part of the fluidized bed by the powder feeding device, the upper part of the fluidized bed is communicated with the upper part of the cyclone separator by a pipe I, the top of the cyclone separator is provided with an outlet pipe for the flue gas containing low-concentration carbon dioxide, the bottom of the cyclone separator is communicated with the upper part of the regeneration device by a pipe II, the bottom of the regeneration device is communicated with the bottom of the fluidized bed by a pipe III, and the top of the regeneration device is provided with an outlet pipe for the flue gas containing high-concentration carbon dioxide.

本发明提供一种干法分离和回收烟气中二氧化碳的装置和方法,无需分离前对烟气进行降温,而直接在高温下进行二氧化碳的吸收分离,从而避免降温过程中的能量损失;器中干法分离和回收烟气中二氧化碳的装置,由磨粉装置、给粉装置、流化床、旋风分离器和再生装置组成,所述流化床底部有烟气入口,所述磨粉装置通过给粉装置与流化床下部连通,流化床的上部通过管道I与旋风分离器的上部相连通,旋风分离器的顶部有低二氧化碳浓度烟气出口管道,旋风分离器底部经过管道II与再生装置的上部连通,再生装置的底部通过管道III与流化床的底部相连通,再生装置顶部设有高浓度二氧化碳烟气出口管道。

第1/500页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Stay In Bed Days
Freak In The Bed
Bed Love
Bed (Megamix)
Bed (Nina Sky Remix)
Bedroom G
Bed Bed Bed
Bedroom Bounty Hunter
In Bed
Not Going To Bed
推荐网络例句

More direct, directer ; most direct, directest

径直的,笔直的

Do you know how to use a chain saw?

你知道如何使用链锯吗?

This is close to the cost of the purchase price.

这样的收购价已接近成本。