查询词典 trestle bridge
- 与 trestle bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The first cross sea pontoon in the world-Da Xie Bridge, Ningbo, Zhejiang; Merowe Pontoon over the Nile, Ningbruss Pontoon over Congo River in Africa, Ktihat Pontoon in Nepal, 200T ferry in Sudan, Kelimu Pontoon in Xinjiang, and trestle of Minsk aircraft carrier in Shenzhen are functioning as the business card of our company in the civilian pontoon market. The series of suspension bridge of southeast hydraulic power plant trestle, Hangzhou Bay bridge trestle, Jiaozhou Bay bridge trestle and segmental bridges in Burmese and Ecuador have won high appraise from the owners.
世界上第一座跨海浮桥——浙江宁波大榭桥、尼罗河上的麦洛维浮桥、非洲刚果河上的英布鲁浮桥、尼泊尔的可迪亚哈特浮桥、苏丹的200吨渡船以及新疆的塔里木浮桥、深圳明斯克航母栈桥等,成了我公司在民用浮桥市场的名片,以西南水电站用栈桥、杭州湾大桥栈桥、胶州湾大桥栈桥和缅甸、厄瓜多尔等国的拼装式吊桥为代表的系列吊桥、装配式公路钢桥得到了业主的高度赞扬。
-
This paper introduces dismantling design and construction of the trestle bridge,and puts emphasis on reinforcement design in dismantling construction of the trestle bridge,dismantling construction gist of road plates of bridge,Bailey beams and steel pipe piles.
栈桥桥面宽8·0m,按双车道设计,顶面设计标高为7·0m。栈桥为多跨连续梁,梁上部结构为单层321贝雷桁架,梁高1·5m;栈桥跨径有12m及15m两种;下部结构采用打入式钢管桩基础,按摩擦桩设计,桩径分800、600mm两种,桩长20~40m。
-
Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .
本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。
-
In regard to cross the river bridge is now formed pontoon, mechanized bridge / trestle, mechanization railway platform, fabricated truss bridge, building bridges and a motorboat, engineering, floating boxes, fabricated steel products such as road series; in the Special Purpose Vehicle and engineering machinery and mechanization of the main pontoon bridge and set up a dedicated delivery vehicles, loading and unloading trucks and other products from the series; in the steel works has developed a road / rail bridge steel structure, metallurgical equipment, various power transmission towers and microwave towers, steel columns, steel poles and other products.
在渡河桥梁方面,现已形成舟桥、机械化桥/栈桥、机械化铁路站台、装配式桁架桥、架桥汽艇、工程浮箱、装配式公路钢桥等产品系列;在专用汽车和工程机械方面主要有舟桥和机械化桥运载及架设专用车、自装卸车等产品系列;在钢结构工程方面开发了公路/铁路桥梁钢结构、冶金设备、各种输变电塔和微波塔、钢柱、钢质电线杆等产品。
-
The development of travelling trestle bridge fabrication machine in China was reviewed. Bridge fabrication machines were classified according to PC box girder's position in travelling trestle. A comparison was made between two construction methods: precast girder assembly method and cast\|in\|situ method.
我国移动支架造桥技术的进展预应力混凝土梁的施工有架桥机架设、顶推架设、悬臂灌筑、悬臂拼装、造桥机造梁等几种方法,各有其适用范围,而采用造桥机架梁系墩顶原位造梁,跨度、墩高适用范围广,不影响桥下交通,梁施工时的状态与运营工况一致,且省工省料,建造速度快,梁既可工厂化分节预制,也可在模架上整孔现浇。
-
Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."
六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"
-
Zhao Xian is the age-old cultural city, many historical sites, with the provincial cultural relics protection for more than 11 of which, Zhaozhou Bridge is the earliest existing, to preserve the integrity of the single shoulder open stone arch bridge, known as the "originator of a bridge in the world" and "Bridge the best in the world," American Society of Civil Engineers has been selected as the 12th Department,"the International Civil Engineering of historical monuments"; Yong-Zhaozhou Bridge and the bridge and said "sister bridge", there are similar; dharani Jingchuang Hailed as "the first Chinese Tower."
赵县是历史悠久的文化名城,名胜古迹众多,拥有省保以上文物11处,其中,赵州桥是现存最早、保存最完整的单孔敞肩石拱桥,被誉为&世界桥梁鼻祖&和&天下第一桥&,被美国土木工程师学会选定为第十二处&国际土木工程历史古迹&;永通桥与赵州桥并称&姊妹桥&,有异曲同工之妙;陀罗尼经幢被誉为&华夏第一塔&。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
First, this paper presents three girders model with double cable planes which main girder and side girder is connected by rigid arms, analyzes the dynamic characteristic of Yonghe cable-stayed bridge and obtains its natural vibration modes (i.e., frequency, damping values and the mode shapes ) by ANLSIS structural analysis program and uses these parameters as dynamic dactylogram of the intact case of cable-stayed bridge. Using the passage of random as the ambient vibration ,the dynamic properties of Yonghe Bridge is measured and the modal parameter of its 15 years after is identified and used as dynamic dactylogram of the damaged case. By the finite element analysis and locale vibration test, damaged and undamaged modal parameter is analyzed and curvature mode shape, which is sensitive to damage state, is introduced as possible candidate for identifying and locating damage in the cable-stayed bridge. Selecting the branch of part measured point from modal parameter, this paper deduces the damaged index which can detect the possible damaged location of the cable-stayed bridge deck and identifies the damaged region and degree for Yonghe Bridge. For the purpose of structural condition monitoring in in-situ , from another viewpoint, this paper introduces the method called the best optimization vector to detect damaged location and degree. The accuracy and reliability of the method presented in this paper are demonstrated by static analysis and test and the healthy state of Yonghe Bridge can be evaluated.
建立了双索面通过刚臂与主梁及边梁相连的三梁式力学模型,采用ANSYS结构分析程序对永和斜拉桥进行动力分析,对其振动模态参数进行识别,以此作为斜拉桥完好状态下的动力&指纹&;采用自由交通流作为环境振源,对永和斜拉桥动力特性进行测试,识别出永和斜拉桥使用15年后的模态参数,确立了破损状态下的动力&指纹&;利用有限元分析、现场振动测试,对破损前后的模态参数进行分析,提取对破损状况较敏感的模态曲率作为斜拉桥破损诊断的参数;并从模态参数中选取部分点的分量,导出可以指示斜拉桥桥面大概损伤位置的Index损伤指标,识别出斜拉桥发生破损的区段及破损程度;考虑大型斜拉桥在线监测要求识别破损的具体位置,从另一角度提出采用最优矢量法具体确定破损发生的位置及程度;为验证本文研究成果,对永和斜拉桥进行静力分析及静力测试,对其健康状况提出可靠的评价。
- 相关中文对照歌词
- London Bridge Is Falling Down
- Brave Mountaineers
- Under The Bridge
- Take It To The Bridge
- My Arms Are The Brooklyn Bridge
- Bridge To Love
- Bridge Burn
- Bridge To Canada
- Bridging The Gaps
- Erie Canal
- 推荐网络例句
-
Although translator has turned from being a crystal ball by which the original culture can unrestrainedly penetrate to another crystal ball by which the target culture can freely traverse, the translator's personal embodiment, in the process of cognitive act, are still absent in translation studies. Translators are still subjects without body or simply disembodied subjects.
译者虽然由原语文化可以自由穿透的玻璃球变成了译语文化可以自由穿越的玻璃球,但译者认知过程中的个体体验在翻译研究中依然缺席,译者依然仅仅是一个没有躯体体验的主体。
-
Chillingly, he claimed our technology is 'not nearly as sophisticated' as theirs and "had they been hostile", he warned 'we would be been gone by now'.
令人毛骨悚然的,他声称我们的技术是'并不那么复杂,像他们一样,和"如果他们敌意",他警告说,'我们将现在已经过去了。
-
And in giving such people " a chance to be themselves," he saw himself as a champion of th South's hardscrabble underclass, both black and white.
他给了这些人一个"成就自己"的机会,同时将自己看成是南方那些贫困的下层人民的声援者。