英语人>网络例句>traverse rail 相关的网络例句
traverse rail相关的网络例句

查询词典 traverse rail

与 traverse rail 相关的网络例句 [注:此内容来源于网络,仅供参考]

Therefore, there have the important practicatol of city transportation plan in our country, but metropolis circle rail transit plan research then just started, although has carried on the Yangtze River delta area rail transit plan, the Zhujiang Delta rail transit plan, also has yielded many results, but still has not formed the systemic theory and method.

我国在城市交通规划及城市轨道交通规划研究中已经积累了丰富的理论与方法,但是对于都市圈交通规划研究则刚刚起步,虽然我国也进行了长江三角洲地区轨道交通规划、珠江三角洲轨道交通规划,也取得了不少成果,但仍然没有形成系统的理论与方法。

A comparison between multi-rail networks and single-rail networks which have the same bandwidth as multi-rail networks is also given in theoretical analyses.

采用理论分析的方法比较了具有相同网络带宽的多轨网络和单轨网络,分析表明,前者可以有效降低网络延迟,因此能够比后者提供更高的网络吞吐率。

This paper describes the development of urban rail traffic and its significance and the necessity of electric braking. Air brake system and focuses on the analysis, the choice of the braking system, the structure and principles of pneumatic braking system. Finally, the prospect of urban rail transport vehicle braking system developments.

本文阐述了城市轨道交通及其发展的意义,分析了电气制动及其研究的必要性,并着重对空气制动系统进行了分析,分析了制动系统的选择、气动制动系统的结构及原理,最后展望了我国城市轨道交通车辆制动系统的发展趋势。

This Years, we have to rail lines, urban rail transit provided about 18,000 sets of air-conditioning units and train 2,500 sets of door systems.

这几年,我们已经为铁路干线,城市轨道交通提供了大约18000套列车空调机组和2500套门系统。

Other efforts include the extension of the Red Line in South Quincy and Alewife, the relocation of the Orange Line in Boston's Southwest Corridor, and modernization of the Commuter Rail Network, the restructuring of the MBTA, the formulation of noise rules to halt the increase in aircraft noise at Logan Airport, the development of strategies to achieve high speed rail service between Boston and New York, and the planning for the redevelopment of the Park Square section of Boston through the location and construction of the State Transportation Building there.

其他还有在南Quincy和Alewife地区推进Red Line地铁工程,波士顿西南走廊Orange Line地铁的重新选址,Commuter铁路网的现代化,MBTA工程重建,波士顿机场降低噪音政策的制定,提高波士顿到纽约铁路运行速度的发展战略,以及通过在波士顿Park Square地区修建州交通大厦以振兴该地区的规划。

From the national conditions, a public-private partnership by domestic rail transportation system in the area and the problems facing the challenges of private capital involved in the analysis of the cause of the existence of rail transportation risks presented by the government to attract private capital in the enterprise and eliminate or reduce the risk of private responses;At the same time, from a rational allocation of risks and responsibilities of the position, fare adjustment mechanism discussed in the areas of land development and enhance the attractiveness of orbital transport to the impact of private capital.

从国情出发,提出了公私合作制在国内轨道交通领域面临的问题与挑战,分析了民间资本介入轨道交通事业所存在的风险,提出了政府为吸引民间资本介入而化解或降低民营企业风险的对策;同时,从合理分配风险、政府职责定位、票价调整机制以及土地开发等方面论述了增强轨道交通事业对民间资本吸引力的影响。

It is shown from the results that the acting force and vibrating acceleration are increased due to its axle load, however, the dynamics interaction between 25 t load wagon and the turnout can be improved by the rubber stack in its axle box, especially in the index such as derailment coefficient, reduction rate of wheel load, opening size of tongue rail and point rail, which is almost equal to the dynamics of 21 t axle load wagon.

结果表明尽管轮轨力和振动加速度因轴重增加而相应增大,但由于25t轴重货车在轴箱处采用橡胶堆,使它与道岔之间的动态相互作用有所改善,尤其是脱轨系数、减载率、尖轨和心轨前端开口量等指标上,与21t轴重货车引起的系统振动值基本一致。

Buyers should be aware that the property adjacent to the outer rail of the lower prices and as a result of light rail through the convenience, but it should be the corresponding transport costs and time cost.

买家应该知道,物业毗邻铁路的外较低的价格和由于轻轨通过方便,但应相应的运输成本和时间成本。

The train positioning technology based on absolute position encoding is proposed. The absolute positions of the rail track are encoded with the m sequence. The biconditional markers placed on the rail track are detected sequentially by the train-borne reader. The exclusive position code consists of the binary information in the shift register. The absolute train positioning information can be extracted by decoding this position code.

利用m序列(最大周期线性反馈移位寄存器序列)对轨道线路上的绝对位置进行编码,当列车在线路上运行时,通过车载阅读器顺序检测设置在轨道线路上的二值标记,在不同位置上读到的标记在移位存储器中构成唯一的位置编码,以此位置编码值作为地址与车载阅读器所处位置的坐标信息相对应,就可以实现列车的绝对定位。

During the design the non-standard equipment for siemens and brose,i have been a principal for many times.i have profound knowing for the assembling technics and the assemble equipment of the car's board of the car's door,guide rail of the car's windows,seat of the car,manifold,electric spout of engine,fuel guide rail of engine,spout oil organ of engine,the adjuster of the oil press etc.

在西门子及博泽的非标设计过程中多次担任项目负责人。并对汽车门底板、导轨、座椅、进气歧管、电喷控制器、燃油导轨、喷油嘴、油压调节器等产品的装配工艺及其设备有非常深刻的认识。

第8/223页 首页 < ... 4 5 6 7 8 9 10 11 12 ... > 尾页
相关中文对照歌词
It Bun Me
On Traverse Un Miroir
Steel Rail Blues
Lay My Head On The Rail
Fresh From Yard
Rollin' And Ramblin'
Relentless
The Ragpicker's Dream
Ghost Train
No Rest
推荐网络例句

Finally it offers the analysis of the fault-tolerance system as well as its test verification.

这样,运行于空间环境中的系统的设计目标就是在保证系统实时性

However, it is still difficult to find out the real reason of the increase of the keratinized gingiva during the orthodontic extrusion whether it is due to the proliferation of the gingival tissue or to its elastic nature, that is because the proliferation of the fibroblasts as well as the connective tissue changes in volume and the intra-fibers spaces were all immeasurable in most of the studies.

然而,仍然难以找到真正的原因增加的角化牙龈在正畸挤压它是否是由于扩散的牙龈组织或其弹性性质,这是因为增殖的成纤维细胞以及作为结缔组织的变化量和内部纤维空格都是不可估量的,大多数的研究。

By east-west into the western mountain front or in Landrace, Xing'an Mountain front to forest-steppe sub-zone and Songnen plain black or plain meadow steppe chernozem Songnen sub-regions.

按东西向分为西部山前台地或长白、兴安山前台地森林草原黑土亚区和松嫩平原或松嫩平原草甸草原黑钙土亚区。