英语人>网络例句>train load 相关的网络例句
train load相关的网络例句

查询词典 train load

与 train load 相关的网络例句 [注:此内容来源于网络,仅供参考]

And the reasonable proposal for the construction the region electrical power system was put forwardThe power load forecast is the basis of the power system planning.With the actual planning of regional development,uses a scientific and effective load forecasting methods forecast plans the local load electric quantity,is an important work to the regional power system planning.This dissertation uses the BP algorithm, proposed a double hidden layer structure artificial neural network to the forecast ultra-short-term power system load.After the simulation with the actual data,the method which this dissertation proposed compared to the traditional linear extrapolation Prediction method average absolute percent error of 2.5 percentage points,ten minute load forecasts achieve the average absolute percentage error are smaller than 2.5%accuracy.

本文利用人工神经网络BP算法,提出了一种双隐层结构的电力系统超短期负荷预测方法,经过对实际数据的仿真实验,本文提出的神经网络超短期负荷预测方法比传统的线性外推法预测平均绝对百分误差降低2.5个百分点,十分钟负荷预测达到平均绝对百分误差小于2.5%的精度。

Through the flue gas and air characteristic analysis in supercharged boiler,the results showed that the value of parameters would increase with the increase of fuel consumption.And volume heat load of the furnace, fuel consumption, heat change between flue gas and convective heating surface and evaporation value would increase with the increase of compression ratio.The heat calculation would be different because of dissimilar thermal calculation in the turbo-compressor when the boiler load was changed.As the boiler load increased,heat loss in the turbo-compressor would increase and the efficiency of the boiler would decrease.The results of the boiler start-up simulation showed that the time of start-up would decrease with the increase of flue consumption ,but instantaneous pressure amplitude would increase.Steam water"s dymamic diversification would be more complex than flue gas"s,and dynamic characters of their parameters would be changed due to different boiler load and disturbance variable,which was shown by results of the simulation when boiler load was changed.

通过分析增压锅炉内的空气、烟气参数特性,发现随着锅炉负荷的增加,空气和烟气的各项参数值都相应的增加;炉膛容积热负荷、锅炉的燃料负荷随着增压比的提高成比例增加;随着增压比的增大,烟气与对流受热面的换热增加,蒸发量随之增加;由于涡轮增压机组在不同负荷下的热力计算不同而造成增压锅炉在不同负荷下的热平衡计算的不同;锅炉增压机组的总的热损失随着锅炉负荷的增加而增加,而增压锅炉的热效率随着锅炉负荷的增加而减少;锅炉启动模拟仿真结果中发现,锅炉启动时燃料量增加,锅炉的启动时间就会减少,但是瞬时升压速度会增加;而动态负荷变化模拟仿真结果中发现,锅炉汽水侧的变化相比烟气侧更为复杂,且在不同负荷和不同扰动量下,烟气侧和汽水侧的重要参数动态特性是不同的。

Company 6-24KV medium voltage products, the main production and distribution of Products as follows: First, the main products: 1, XGN15-12 ò type SF6 Ring Net Cabinet (with FLN36-12 or FLN48-12 load switch) 2, XGN15 - 12 ó Type SF6 Ring Net Cabinet (with ABB-SFG load switch) 3, GN15-12 type SM6 imitation ring counters (with load switch SC6 Schneider) 4, DFFW-10 type outdoor Cable Branch Box (available with SF6 load switch) 5, FLN36-12, FLN48-12-type SF6 load switch and at the top of unit 6, YBP prefabricated Continental me change, KYN28A in the rear-mounted switchgear Second, the main distribution Products: 1, Beijing ABB-SFG-12A / K at the top of unit 2, ABB-SafeRing/SafePlus series inflatable counter 3, Schneider SM6, RM6 Series ring counter 4, ring counter agent ABB PARTS (Fuck electricity to open the current transformer, EKL series fault indicator), Shenzhen Deep Electric Ltd. to create the domestic electricity sector, users, manufacturers solemn commitment to the industry: product shelf-life forê, maintenance-free period of 10 years, under normal use conditions to ensure reliable operation of 20 years, such as product quality have any problem , the company will be sent within 24 hours of treatment and to ensure user satisfaction.

公司以6-24KV中压产品为主,主要生产及经销产品如下:一、主要生产产品:1、XGN15-12Ⅱ型SF6环网柜(配FLN36-12或FLN48-12负荷开关)2、XGN15-12Ⅲ型SF6环网柜(配ABB-SFG负荷开关)3、GN15-12Ⅳ型仿SM6环网柜(配施耐德SC6负荷开关)4、DFFW-10型户外电缆分支箱(可配SF6负荷开关)5、FLN36-12、FLN48-12型SF6负荷开关及顶部单元6、YBP□预装式欧式箱变、KYN28A中置式开关柜二、主要经销产品:1、北京ABB-SFG-12A/K顶部单元2、ABB-SafeRing/SafePlus系列充气柜3、施耐德SM6、RM6系列环网柜4、代理ABB环网柜配件(电操、开启式电流互感器、EKL系列故障指示器)深圳市深创电气有限公司向国内电力部门、用户、同行业厂家郑重承诺:产品保质期为壹年,免维护期为10年,在正常使用条件下保证可靠运行20年,如产品有任何质量问题,公司将于24小时内派员处理并保证用户满意为止。

On the basis of the former researches and taking into account the practice of our country, this paper take the low period repeat loading experiment for three rigid conjunction node of steel beam and concrete wall, researching their load-bearing capacity and earthquake resistance performance under the low period repeat loading action, the main content concentrate on the following aspects:(1) Analyzing the three joint's damage shape、hysteretic curve、change of rigidity、yielding load、limit load、damage load、durability、energy dissipation capacity、the strain of the key position and the moment transferring mechanism.(2) Comparing the joint's load-bearing capacity and earthquake resistance performance among the joints with different stud bolt diameter and different connection plate thickness, researching some factor's influence on the work performance of the joint such as the high and strong stud bolt specification、connection plate thickness .

本文在前人研究的基础上,结合我国的实际情况,对3个钢梁-混凝土墙刚接节点试件进行了低周反复荷载试验,对其在低周反复荷载作用下的承载力和抗震性能进行了研究,内容主要集中在以下几个方面:(1)对3个节点试件在低周反复荷载作用下的破坏形态、滞回曲线特性、刚度变化、屈服荷载、极限荷载、破坏荷载、延性性能、耗能能力、关键部位的应变分布情况及节点核心区的受力情况进行了试验研究和理论分析;(2)比较了不同螺栓规格和不同连接板厚度的节点试件的承载力和抗震性能,研究了高强螺栓规格和连接板厚度这2个因素对节点工作性能的影响;(3)介绍了光纤光栅传感技术在土木工程领域中的应用研究现状及其基本原理;并通过对比试验,探讨了光纤光栅传感器用于土木工程检测的可行性及实现途径。

The results show that the vehicle acceleration, the dynamic wheel load and offload factors increase with train speed, and distribute linearly. The safety of train operation and running comfort can meet the requirements when the high-speed train under secondary suspension passing through ballasted track subgrade structure. The dynamic displacement of the system is less influenced by train speed. The dynamic stress of subgrade surface increases with speed improving, and it is distributed as saddle along the lateral direction and as parabola along the longitudinal direction of subgrade surface. The dynamic stress of subgrade declines sharply along the depth of subgrade. The dynamic stress on 3 m depth below subgrade bed surface is about 16 percent of that of subgrade surface.

结果表明:车体加速度、动轮载和轮重减载率均随车速的提高而增大,呈线性分布;具有二系悬挂的高速列车通过有砟轨道路基结构时,列车的安全性及舒适度均能满足要求;系统动位移受速度影响较小;路基面动应力随速度的提高而增大,并在横向呈马鞍形分布,在纵向呈抛物线形分布;路基动应力沿路基深度方向衰减较快,在基床表面下3 m处,动应力只有基面的16%左右。

After one night sleep, we, three free-minded girls, got up so early to meet our train from Delhi to Agra. But one act has never been identified here that the train is so crowded with people and passengers have to hold the doorframe like a hanging or sit at the top of the train. Someone told me before I came India. But this train set off on time. We agreed with Helen on the same fact that this train is the first class with breakfast, tea and boiled water service.

提前一个月的时间计划准备去印度旅行,在出发前还拼命的加班到夜里1:30,第二天搭了公司的顺风车早早的到了机场,同行的人一个都没见过面,只是约好了在机场的 Mcdonald 集合,我在那里等了一会也没见到一个象我这样装束的人,算了,还是打个电话给林雨音吧,结果他们都已经拿到机票到海关处填单子去了。

Tour Itinerary While you are in Cairo, you can enjoy a full two days tour to Luxor, you will be transferred from your hotel at 7 pm transfer to the train station taking 8,20pm train to LuxorDay1 7 Am Pick up from the train station in Luxor and starting guided tour with groupe to see Karnak temple, the greatest example for worship in the history, dedicated to God Amon, his wife Mut and and their son khonsu and then you will check Luxor temple and over night in the hotel in LuxorDay 2 7 a.m. Start guided tour with groupe to see valley of the kings, valley of the queens, temple of the queen Hatshpsute the only pharaonic woman reigned ancient Egypt and closes of Memnon, in the evening transfer to the train station taking first class train back to Cairo.

描述探索奇迹古老的文明,如埃及,第三个不知道的世界游览行程当您在开罗,你可以充分享受两天访问卢克斯特,你将被转移到您的酒店在晚上9点转移到火车站到晚上10点火车到卢克索第一天上午8时30分拿起从火车站开始在卢克索和导游与集团看到卡纳克神庙,最伟大的榜样,崇拜的历史,致力于神阿蒙,他的妻子突变和和他们的儿子孔苏,然后将检查卢克索神庙和晚上在酒店在卢克索第2天上午7时开始导游与集团看到帝王谷,王后谷,庙Hatshpsute皇后唯一的女法老统治古埃及和关闭的Memnon ,晚上转移到火车站采取头等舱火车回开罗举行。

The paper, which is based on the "Research and Development of the Speed-up Train"s Manipulation of Optimization and Train Simulator project, concerns the sound system in the Train Simulator. In the paper, the sound system includes two parts contents: firstly, improving the sound effect of the sound simulation system in the Train Simulator and enhancing 3D sound effect, such as sense of distance, sense of orientation, Doppler Effect etc, to make the sound of training environment more verisimilar; secondly, realization of the speech communication in network between teacher and student in the Train Simulator.

本文是以铁道部科技发展项目"提速列车优化操纵与机车仿真器研究开发"为依托,对机车仿真器的声音系统进行研究:第一,对机车仿真器中声音仿真系统的音效进行改进,增加3D音效,如声音的距离感、方位感、多普勒效应等,使得训练环境音响更加逼真;第二,实现机车仿真器中教员与学员间的语音网络通讯。

The results show that side force, lift and overturning moment obtained by simulation and by wind tunnel test are consistent. When train travels with certain speed, the aerodynamic force and overturning moment acting on passenger car running on bridge, embankment and flat will increase greatly as cross-wind becomes larger while those increase less when the train runs on cut. Under the condition of strong cross-wind, aerodynamic force and overturning moment acting on train traveling on bridge are the largest. So the train traveling on bridge tends to overturn compared with that traveling on other three kinds of railway conditions. Aerodynamic force and moment acting on train traveling on cut are the least.

研究结果表明:侧向力、升力和倾覆力矩数值模拟结果与风洞实验结果均吻合较好;车速一定时,随着侧风速度的增大,列车在桥梁、路堤、平地上运行所受气动力和倾覆力矩均急剧增加,而在路堑上运行所受气动力及力矩增加缓慢;当侧风速度一定的情况下,客车在高桥上运行所受到的气动力及力矩最大,因此,强侧风下列车在高桥上运行较容易发生倾覆事故;在路堑上所受到的气动力相对最小。

The system movement resultproved, in this article designs the train station ticket clerk sellsthe management system management system to be allowed to satisfy thepassenger, the train station staff and the train station systemmanager three aspects need; And further has made the partialoptimizations and the innovation on the present domestic train stationbooking subsystem universal concealment system flaw, thus will managethe subsystem for the later domestic train ticket sale the renewal tomake a point of meager reference.

系统运行结果证明,本文中所设计的火车站票务销售管理系统可以满足乘客、火车站工作人员和火车站系统管理员三方面的需要;并进一步就目前国内火车站售票子系统普遍隐含的系统缺陷做了部分优化和创新,从而为以后国内火车票销售管理子系统的更新换代做了一点微薄的参考。

第2/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
This Train
This Train
All Aboard (Ride It)
This Train Is Bound For Glory
Meet Me At The Station
This Train
The Weight
Ghost Train
Bulletproof
Bullet Train
推荐网络例句

Finally it offers the analysis of the fault-tolerance system as well as its test verification.

这样,运行于空间环境中的系统的设计目标就是在保证系统实时性

However, it is still difficult to find out the real reason of the increase of the keratinized gingiva during the orthodontic extrusion whether it is due to the proliferation of the gingival tissue or to its elastic nature, that is because the proliferation of the fibroblasts as well as the connective tissue changes in volume and the intra-fibers spaces were all immeasurable in most of the studies.

然而,仍然难以找到真正的原因增加的角化牙龈在正畸挤压它是否是由于扩散的牙龈组织或其弹性性质,这是因为增殖的成纤维细胞以及作为结缔组织的变化量和内部纤维空格都是不可估量的,大多数的研究。

By east-west into the western mountain front or in Landrace, Xing'an Mountain front to forest-steppe sub-zone and Songnen plain black or plain meadow steppe chernozem Songnen sub-regions.

按东西向分为西部山前台地或长白、兴安山前台地森林草原黑土亚区和松嫩平原或松嫩平原草甸草原黑钙土亚区。