英语人>网络例句>top-secret 相关的网络例句
top-secret相关的网络例句

查询词典 top-secret

与 top-secret 相关的网络例句 [注:此内容来源于网络,仅供参考]

Ligan in the bottom of the displacement constraints imposed three in the top of stents, at 1.40 on the level of two-way Ligan vertex imposed constraints to consider stent top and Timber Beam friction between the role of the bar and Weigan the rectangular fastener, a semi-rigid, torsion spring used to simulate.

在立杆底部,施加三向位移约束;在支架顶部,对位于四角的立杆顶点施加双向水平约束,以考虑支架顶部和木梁之间的摩擦力作用;横杆与立杆之间的直角扣件,属于半刚性连接,用扭转弹簧来模拟。

The warp system made up of top warps of the layer forming the paper side is interconnected with the warp system of the structure forming the machine side by means of binder yarns by arranging the binder yarns at the paper-side binding point to press the top warps inside the fabric in such a manner that the binder yarns are at the binding point under the surface of the fabric.

形成纸面层的顶经线构成的经线系统,通过使纸面粘合点上的粘合纱以使粘合纱在粘合点上位于所述织物表面下面的方式把顶经线压入到所述织物内,与形成机面层结构的经线系统由粘合纱连接在一起。

It's easier to infect children - who sport a red top and move around manically - and the elderly, who move slowly and are wearing a yellow top.

小孩头顶是红色的,他们会到处乱跑,因此比较容易被感染。而年纪大一点的头顶则是黄色的,这些人的行动要缓慢一些。

A top student who is also a top athlete memorises biology terms as he works out every day.

有位成绩优异的学生同时也是优秀的运动员,每天利用户外训练时间背生物学术语。

1 Laid on the observation points, the next gate in the first paragraph and the chamber are in side-dock-type pier and construction of a wide bottom seam laid 8 to each end of the settlement within 24 observation points nails; chamber 14 Fu wall segments are in lock wall at both ends of the floor laid four nails into account the settlement of 56 observation points; settlement nail making use of 40cmФ18 rebar welded copper top round hat hemisphere processed, buried, when coupled with oblique bars welded to the end of plate surface layer and vertical reinforcement, the top highlight the concrete surface, about 1.5 ~ 2.0cm in order to guarantee points are solid.

3.2.1观测点的布设上、下闸首及闸室坞式段均在边墩底板及施工宽缝的两端各布设8个沉降钉计24个观测点;闸室14节扶壁段均在闸墙底板两端各布设4个沉降钉计56个观测点;沉降钉的制作采用40cmФ18螺纹钢顶端焊接镀铜半球圆帽加工而成,埋设时配以斜筋焊接在底板面层及竖向钢筋上,顶端突出砼表面1.5~2.0cm左右,以保证点位稳固。

China" will take the lead in the first half of 2009 into the global root domain name system, as the first batch of new non-Latin characters in one of the top-level domains, namely, Chinese country code top-level domain "Chinese domain name will be officially opened .

中国&将于2009年上半年率先写入全球根域名系统,成为首批新设的非拉丁语系字符顶级域之一,即中文国家代码顶级域&中国域名将正式启用。

The keel is split into a top and bottom segment so that the top can have deck holes for draining water added, then the deck is laid. The deck is then refined to its three main heights and deck houses are added followed by additional detail and yardarms, belaying pins, rope hooks and so forth.

龙骨分裂成一个顶部和底部部分,使最高可以用甲板洞排水补充,然后在甲板上奠定了基础,然后改进,它的三个主要高地和甲板房屋其次是增加更多的细节。

The car has fully adjustable roll centres on both the top and bottom wishbones, a higher top deck and new bulkheads to allow the higher capacity LiPo packs to be easily fitted.

车已经完全可调辊中心的顶部和底部叉,较高的上层和新的舱壁,使更高容量脂包可以方便地安装。

Bankrate's national weekly mortgage survey is conducted each Wednesday from data provided by the top 10 banks and thrifts in the top 10 markets.

Bankrate国家每周按揭统计调查是每星期三提供的数据前10名的银行和储蓄机构进入前10名的市场。

The company's main products are: BZ-20ES, BZ-18ES utility mining loaders, the equipment can be used for ballast Tunnels, finding the top, were seized at the end, multi-wall clearance, is a sophisticated tunnel construction machinery; needle beam,穿行Top-and-steel arch concrete lining vehicles; wheel, the rail-lines, electric and internal combustion and hydraulic models at 2.5 M3, 3M3, 5M3, 6M3 series of concrete mixing tanker transport, steel Gongjia Bending special equipment - cold-formed; MTR and construction works under pressure by the pile-pipe, steel support, the steel tube PURLIN; works for pulling the pipe wall lock pile with all the various models of hydraulic Stubbs pile driver; Various public facilities used in steel structure, the grid system, and so on.

公司的主要产品有:BZ-20ES、BZ-18ES型多功能挖掘装载机,可用于隧道的装碴、找顶、捡底、多墙清理,是一种先进的隧道施工机械;针梁式、穿行式以及边顶拱式砼衬砌钢模台车;轮式、轨行式、电动式、内燃式和液压式,型号分2.5M3 、3M3、5M3、6M3 系列砼搅拌输送罐车;钢拱架弯曲专用设备---冷弯机;地铁及建筑桩基工程承压用的钢管柱、钢支撑、钢围檩;工程连续墙锁喉管拔桩用的各种型号全液压拔桩机;各种公共设施用的钢结构、网架制安等。

第59/100页 首页 < ... 55 56 57 58 59 60 61 62 63 ... > 尾页
相关中文对照歌词
Top Dawg Under Dawg
It's A Long Way To The Top (If You Wanna Rock 'N' Roll)
Top Of The World
Room At The Top
ZZZ Top
Big Top Halloween
Top Of The World
Put Me On Top
Women On Top
Top Chef
推荐网络例句

In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.

。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。

Go down on one's knees;kneel down

屈膝跪下。。。下跪祈祷

Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.

Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。