查询词典 top tray
- 与 top tray 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
To temporarily put any window in the system tray, hold down the SHIFT key while when pressing the minimize button at the top right of the window.
暂时把任何窗口,在系统托盘后,按住 Shift键时,按下按钮,尽量减少在右上角的窗口。
-
You can even minimize top-level windows to the System Tray .
你甚至可以减少高层的视窗系统托盘。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Wing roof form of the more special, two upward puzzle parapet gable, wall tile top of hanging around for the ice tray canopy assemble method.
厢房屋顶形式较特殊,两山墙向上砌女儿墙,墙顶端挂瓦,周围为冰盘檐砌法。
-
A Stay-Fresh Reclosable Tray for Oscar Mayer Center Cut Bacon. The 12-ounce package uses a flip-top lid that snaps closed for easy resealing.
托盘持有该产品是平坦的,因此,新方案将不采取任何更多的空间比老剥片之一。?
-
Langen now offers the:LRC-400 (tray/carton top loader, product assembler),LRC-500,LRC-600, and theLRC-700 (combined case packer and palletizer),as standard products with a wide range of options such as line tracking, a variety of infeeds, stainless steel construction and available quick change end-of-arm-tooling.
根现在提供:法改会- 400 (托盘/纸箱顶端装载机,产品汇编),法改会- 500,法改会- 600,以及法改会- 700,作为标准产品提供广泛的选择,如线追踪,各种infeeds ,不锈钢建设和提供快速变化结束ARM的加工。
-
On the hall table in every house the first thing you saw was silver tray waiting to receive more calling cards on top of the stack already piled up like jackstraws; they were never thrown away.
在任何一家门厅的桌台上你首先看到的是一只银盘上散乱地堆满了名片,仍恭候着更多的名片的到来。来访者的名片从来不被扔弃。
-
If you can't resist a poloneck then throw a round-neck jumper or a chunky cardigan over the top to avoid being confused for a Milk Tray Man wannabe.
如果你不能忍受圆高领,那么放弃圆领上衣或者宽松的开领毛衫,这能最大程度上防止你和&送牛奶工&混淆起来。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?