查询词典 top beam
- 与 top beam 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The construction process are multiple parameters (such as partial-top, arch axis and elevation changes, etc.) real-time monitoring system controlled by the large-span cable crane rigger arch beam, the system pegging Cable-Stayed deduction deduction for arch beam geometric precision and adjust successfully to a high-precision steel pipe arch-arch-long, concrete-filled steel tube ensures the integrity and stability, effective control of the construction process are arch axis geometric precision.
施工过程中多参数控制实时监测系统,采用大跨度的缆索吊机吊运拱肋梁段,斜拉扣挂体系扣定拱肋梁段并调整几何精度,成功地将钢管拱肋高精度合龙成拱,保证了钢管混凝土的整体性和稳定性,有效控制施工过程中拱轴线几何精度。
-
It is found that topological charge of vortex beam influences the interference pattern, i.e., by compared with the straight interference pattern of plane wave, the interference pattern of vortex beam is shifted in the transverse direction as we look from the top of the interference to the bottom, and the magnitude and direction of shift are related to the topological charge.
详细介绍了涡旋光束的拓扑荷数对干涉条纹分布的影响。发现同平面波的竖直干涉条纹相比较,涡旋光束的干涉条纹,从顶部向底部看去,沿着横向出现移动,并且移动的大小和方向与拓扑荷数的取值有关。
-
In this paper,through the analysis of the engineering quality accident of the top circle beam in a certain big wineshop,a mechanical model of the reinforced concrete circle beam is proposed.
通过对某大酒店顶层环梁质量事故的分析,提出了钢筋混凝土环梁计算的力学模型,经过计算和分析,找出了环梁支座处出现裂缝的原因,并给出正确的计算结果,使事故得以及时处理。
-
By comparison between SMM HXRBS observation and ground observation of Hα and CaIIK lines, especially through the combined study between SMM HXRBS observation and chromospheric flare models, the results show that: in the initial stage of impulsive phase, there is a correlative relation betweem Hα line intensity and hard X-ray emission; different spike in hard X-ray flux curve represents the burst at different location; the energy taken by non-thermal electron beam is larger than the radiative loss in chromosphere; for the flare studied here, the chromospheric evapporation is explosive; if the chromosphere is in balance between electron beam bombardment and radiative loss, the column mass density at the top of chromospheric flare model can not be taken as measure from the source of electrons and then the total material between the source of electrons and the top of chromosphere can be estimated.
通过一个具体耀斑的SMM HXRBS观测结果与同时基于地面得到的Hα和CaⅡK可见光谱观测结果对比,特别是将硬x谱观测结果与色球半经验模型联立研究,结果显示出:在脉冲相上升段,硬x发射与Hα辐射之间存在对应关系;硬x线光变曲线中不同脉冲爆发分量不太可能起源于同一位置;硬x辐射所反映的高能非热电子总携带能量大于色球总辐射损失;对所研究的耀斑而言,其色球蒸发过程是爆发性的;在详细比较了非热电子色球总沉积和色球辐射损失的基础上,指出半经验模型中色球顶部柱数密度不能看成是从非热电子源度量的,从而估计了色球顶部到非热电子源之间的总物质。
-
Through block wall experimental study we can find out that cracks would appear late and the load of crack-resisting and limit-resisting are increased obviously by the constructional measures in the wall. It is very effective method that the splayed cracks are controlled by sill ring beam, the horizontal bending cracks are controlled by structural column on the side of the wall and the horizontal cracks on the top of the wall are controlled by the whole ring beam. It is the most effective method that wall cracks are controlled by structural column, crout column and sill ring beam.
通过试验主要得到在墙体中采取构造措施后,墙体裂缝推迟出现,开裂荷载和极限荷载都有很大程度的提高,同时发现窗台圈梁在控制窗角的八字缝、墙体两侧构造柱对于防止水平弯曲缝以及全截面的圈梁在防止墙体和圈梁交界处的裂缝的出现能起到很好的效果,通过试验确定在砌块墙体中采取&构造柱+芯柱+窗台圈梁&的构造措施来控制裂缝是最为经济合理有效的。
-
We present a flat-top laser beam generation scheme using coherent beam combining of hexagonally arranged Gaussian lasers.
本文提出一种新的平顶光束产生方案,它由六角排列的若干个高斯光源经相干合束而成。
-
Thermal barrier coatings consist of an electron-beam physical-vapor deposited NiCoCrAlY bond coat and 7 wt.% yttria partially stabilized zirconia top coat with a tetragonal phase. The YPSZ top coat shows a columnar grains forming dense clusters with gaps among grain clusters. The roughness of the as-deposited ceramic top coat is relatively low, but some spots of prominent growth defects can be observed. Such defect is a bundle of zirconia columns.
采用EB-PVD方法沉积热障涂层,其粘结层为NiCoCrAlY,陶瓷层为7wt%Y_2O_3部分稳定的ZrO_2,其表层为单一的四方ZrO_2相,其表层比较致密,但有一定的粗糙度,表面存在一些凸出来的斑点状ZrO_2柱状晶,柱状晶粒簇拥成团,团簇间存在间隙。
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
The main way of the method of beam grid is to simulate the top structure with a equivalent beam grid, and concentrates the scattered bending rigid and tension rigid in slab or box beam into the close equivalent beam grid, and the longitudinal rigid of the real structure is concentrated in longitudinal beam rigid, and the lateral rigid is concentrated in lateral beam rigid.
梁格法的主要思路是将上部结构用一个等效梁格来模拟,将分散在板式或箱梁每一区段内的弯曲刚度和抗扭刚度集中于最邻近的等效梁格内,实际结构的纵向刚度集中于纵向梁格构件内,而横向刚度则集中于横向梁格构件内。
-
It is important to reduce the span of the hard roof to avoid its impact load on supports. However, at longwall top coal caving face, the periodical weight of roof is a main factor that crushes the top coal, which is beneficial to the top coal recovery. How to use the roof pressure safely is of crucial importance in top coal caving. Based on field monitoring, theoretical analysis of strata movement, the numerical model of compound structure of hard roof stepped cantilever and the top coal cantilever beam is built, and the parameters of the model are also determined. The elasto-plastic finite element method is used to analyze the effect of hard coal fracture under the abutment pressure of hard roof, and the cracking coefficient is defined according to the stress state of the element.
通过对岩层移动的现场观测,建立了&两硬&条件综放采场台阶悬臂—悬臂梁组合的煤岩组合结构力学模型,并以此煤岩结构为基础,建立&两硬&条件综放采场顶煤压裂的有限元数值模型,分析了坚硬顶板不同来压步距对坚硬顶煤的压裂效应,并确定了合理的支架阻力,从而对坚硬顶板进行有效的控制,消除坚硬项板对采场的冲击隐患,同时保证采场矿压对坚硬顶煤的有效压裂,达到提高顶煤回收率之目的,由此形成了坚硬顶煤、坚硬顶板条件下综放采场围岩控制的基本理论和方法。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。