查询词典 to schedule
- 与 to schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Business travelers know it can be tough to keep a good workout schedule when they're on the road, so we brought along David Kirsch to help us.
商务旅行者知道自己很难在旅途中保持良好的健身计划,所以我们让大卫科西来帮助我们。
-
The voluntary labour of thousands of people day by day helped greatly to bring the project to completion ahead of schedule.
成千上万的人每天参加义务劳动,对工程的提前完成起了很大的推动作用。
-
I want to repay their loans ahead of schedule, while loans for one year before, I heard a need to pay liquidated damages?""
我想提前偿还贷款的时间表,但贷款的前一年,我听说需要支付违约赔偿金?""
-
To gain a larger audience share in our area, and thus i ncrease company profits, KICK should also revise its broadcast schedule to inc lude more sports coverage.
为在本地区获得更高收视率,并从而增加公司利润,KICK也应该修改其播出计划来播放更多的体育节目。
-
3 Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
-
1Reconcile the Master Production Schedule to customer purchase order coverage weekly to ensure that company is not exposed over purchase order coverage.
每周根据客户的采购订单量,调节主生产计划,以确保公司不会生产订单量范围之外的需求。
-
The primary logistical responsibility in manufacturing is to participate in formulating a master production schedule and to arrange for timely availability of materials, component parts, and work-in-process inventory.
制造阶段中,物流的最基本责任是参与制订主生产计划,并安排材料、零部件和在制品存货的及时可得性。
-
Based on master production schedule driven by MRP, check critical material and capacity availability to develop daily production plan and release to workshops.
在MRP运行生成的主生产计划,基础上,检查材料及产能评估,制定生产计划并发给车间
-
Finally, in the Master production schedule formulation process, the thesis seeing the efficiency of production information flow as cut-into point, proposed rolling Master production plan to carry on the arrangement to the production resource, which greatly reduced the stock cost brought by chaotic production plan.
最后,在主生产计划制定过程中,以提高生产信息流的效率作为切入点,提出了滚动主生产计划来对生产资源进行安排,大大降低了由于生产计划混乱带来的高库存成本。
-
This, originates from the master production schedule by utilizing static ERP data, such as BOM, routing, working center and dynamic data, for instance, purchase orders, inventory information, material requirement plan, capacity requirement plan to coordinate the material flow and capacity load so as to have them strike a good status.
这两项工作都是从主生产计划入手,利用 ERP 的静态数据如 BOM、工艺路线、工作中心以及动态数据如销售订单、库存信息、物料需求计划、能力需求计划来完成对物流以及产能的调度,从而达到产能负荷的平衡与物流的准时。
- 推荐网络例句
-
But we don't care about Battlegrounds.
但我们并不在乎沙场中的显露。
-
Ah! don't mention it, the butcher's shop is a horror.
啊!不用提了。提到肉,真是糟透了。
-
Tristan, I have nowhere to send this letter and no reason to believe you wish to receive it.
Tristan ,我不知道把这信寄到哪里,也不知道你是否想收到它。