查询词典 timing chart
- 与 timing chart 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Methods In the conventional internal quality control in the control specimens after the test day, a specimen which total protein result was 60-80 gL^(-1), and albumin result was 30-50 gL^(-1) was selected from the first ten specimens every day, the specimen's TP and ALB results were retested after 3 hours. The difference between the two test results and the difference of the standard deviation were calculated every day for 40 days. Extreme difference quality control chart was established by control limits of range which was calculated by the standard deviation.
在常规室内质控在控后开始检测标本,每天从前10份标本中选出1份总蛋白60~80 gL^(-1)、白蛋白30~50 gL^(-1)的标本,3 h后再重测1次该标本的TP、ALB,每天计算2次测定结果的差值和差值的标准差,连续40个工作日,利用标准差计算双份测定极差的控制限,建立极差型质控图。
-
And then TP and ALB of specimens was test with duplicate determination for a month (22 working days), the difference between the two test result was described on the extreme difference quality control chart.
再连续1个月(22个工作日)进行患者标本TP、ALB双份测定,把每天2次测得结果的差值描到极差型质控图上。
-
Results Among the 38 pedigree charts, 44.7 percent of the diabetics had the background of family tree and 25 symptoms were listed out which were illustrated by a typical pedigree chart. The difference between the total score of kidney-deficiency syndrome with and without family tress is statistically significant (P.05). The total score of four-diagnoses showed a linear correlation with the kidney-deficiency and the regression equation was =
结果在38幅家系图中,有家系背景者占44.7%,进一步举出25项单个症状,及典型家系图加以说明之;无家系背景的肾虚总分和有家系的肾虚总分具有统计学差异(P.05);四诊总分和肾虚总分呈线性相关,回归方程为=
-
First, calculates the fast moving average (usually 12 days) and slow moving average (usually 26 days) by exponential calculation method; second, make fast line value minus slow line value to gain the difference of relative distance. In order to make the trend signals more clear and less influence exerted by of excessive price fluctuation, the difference should be smoothly calculated (general elect 9 days) to get average of difference value. Chart the difference and its average in a coordinate with time for horizontal axis and MACD for vertical axis. Then we can apply the identical, contrary or cross signals through observing their direction, relative and absolute positions.
它首先以指数平滑计算法计算出快速移动平均线(一般选12日)慢速移动平均线(一般选26日),再以快速线数值减慢速线数值即得到快慢线相对距离的差离值,为使趋势信号更明显并且不受股价过分波动的影响,对差离值也进行平滑计算(一般选9日),得到差离值的平均值,把差离值和差离平均值画在以时间为横轴,以MACD为纵轴的坐标上,通过观察差离值和差离平均值的方向、绝对位置和相对位置关系,把它们的同向、异向和交叉现象作为买卖信号的提示。
-
With regards to the learning motive of music, after excluding the pretest influence, it is the finding of the study that the students belonging to the experimentation group score higher in the areas of "Total score","Internal goal orientation","Work value","Controlled belief","Expectation to succeed" and "Test on anxiety" than the control group, amongst which "Work value" reaches significant difference on the measurement chart; of all the students scoring high on "Selective attention" during pretest, the experimentation group scores higher than the control group on posttest scores; regarding the students with lower pretest scores, the control group performs better than the experimentation group; of the students with higher pretest scores on "Discrete attention", the posttest scores of experimentation group are higher than those of the control group; regarding students with lower pretest scores, the control group performs better than the experimentation group; on "Sustained attention", the posttest scores of the experimentation group are higher than those of the control group; on the "Total score" of multidimensional attention measurement, the posttest scores of the experimentation group are higher than those of the control group.
研究结果发现,在音乐学习动机方面,经排除前测影响后,实验组学生在「总分」及「内在目标导向」、「工作价值」、「控制信念」、「期望成功」、「测试焦虑」等分量表上皆高於对照组,其中在「工作价值」分量表上达到显著性差异;在「选择性注意力」前测分数较高学生中,后测成绩为实验组显著优於对照组,对前测分数较低学生而言,则是对照组显著优於实验组;在「分离性注意力」前测分数较高学生中,后测成绩为实验组显著优於对照组,对前测分数较低学生而言,则是对照组显著优於实验组;在「持续性注意力」方面,后测成绩为实验组显著优於对照组;在多向度注意力量表「总分」方面,后测成绩为实验组显著优於对照组。
-
Next to the parallel target, a patterned chart with a distance scale is placed on an incline.
在平行于放置被摄物体的位置上把有距离标尺的测试图表放置于一个斜面上。
-
If what cannot the home judge,be now be most of fire, the simplest way is, go consulting the keyword pop chart of dog of Baidu Yahoo search.
假如家无法判定什么是现在是最火的,最简单的办法就是,去参照百度雅虎搜狗的要害词排行榜。
-
HUSKY DOG Picture CROSS STITCH PATTERN CHART Free S/H.
赫斯基狗图片交叉缝合模式图,免费的S /每小时 US $3.99 (0 Bid)。。。
-
BORDERS FLOWERS CAT DOG TEACUPS KID CROSS STITCH CHART.
边界鲜花猫犬茶杯世代交叉针法图。
-
This paper briefly introduced the development phases of software dog, expatiated on the software dog's software and hardware principles, and analyzed the sameness and difference between software dog and encrypted information. Based on the particular introduction of the inner architecture of CY7C68013 chip which belongs to Cypress corporations EZ-USB FX2 series, the paper gave the hardware implementation of software dog, presented the program flow chart of software dog, and introduced the making process of both driving program and super application program.
简单介绍了软件加密狗的几个发展阶段,具体说明了加密狗的软、硬件原理,并分析了软件加密狗与信息加密的异同,详细介绍了Cypress公司EZ-USB FX2系列CY7C68013芯片的内部结构,并给出了基于此芯片的加密狗的硬件实现,给出加密狗内软件程序流程图,并简要介绍了驱动程序和高级应用程序的制作。
- 相关中文对照歌词
- Timing Is Everything
- Perfect Timing
- River Of Brakelights
- Timing Is Everything (Acoustic)
- Timing Is Everything
- Timing Is Crucial
- Start Well
- Good Timing
- Timelines
- Timing Is Everything
- 推荐网络例句
-
Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.
目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。
-
On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.
一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。
-
What is the topic sentence of this article?
这篇文章中心的句子是那一句?